Download - MartinezHostettler SOQ 2013
...from concept to completion without compromise
General Contractor Construction Manager
Introduction to
MartinezHostettler
MartinezHostettler is a company that was founded to MartinezHostettler is a company that was founded to provide high quality, large company services with the personal attention of a small organization. MartinezHostettler provides superior quality, professional, technologically advanced, services to this highly competitive often unsophisticated market.
Through a consistent use of quality personnel, a Through a consistent use of quality personnel, a commitment to providing our organization with a technologically superior infrastructure, and a solid procedure driven, professional philosophy based on personal integrity, trust, and ethical practices MartinezHostettler provides a level of performance often seen only from much larger organizations and on much larger projects.on much larger projects.
What sets us apart from our competitors is our ability to provide our clients with total solutions. With a long history of providing both architectural and construction services we have a strong understanding of both sides of the construction equation. With a long standing respect for both architecture and construction our business model allows us to provide a complete service not found allows us to provide a complete service not found elsewhere....from concept to completion. What this also means is that we have a long ingrained desire to get the job done with a minimum of conflict between the various architects, engineers or contractors involved on any given project.
A/E/C is about communication, team-work, and quality. MartinezHostettler will exceed all your expectations. 90% of our business is from repeat customers - we want your trust, we want to be your partner.
Services We Provide
Construction
Preconstruction Services Construct-ability Review / Value Engineering Construction Feasibility Review Conceptual / Budget Estimating Guaranteed Maximum Price Generation Scheduling / Schedule Analysis
General Contracting Supervision / On-site Management Safety / Quality Control Scheduling / Logistics Management Project Documentation Control / Submittal Cost Control / Reporting Payment / Financial Controls Closeout Process
Design / Build Single Source Responsibility Timely Cost Containment
Services We Provide
Construction Management
Project Scope Development
RFP / Contracting Process Management
Cost Estimating
Cost & Schedule Control
Contract Administration
Document Control & Systems
Construction Inspection / Quality Control
Value Engineering Assistance
Risk Management
Constructability Review & Red-lining
Contracting and project delivery systems
Project Management Planning
Permit Process Management
Owner Fixtures, Furnishing and Equipment Coordination
Commissioning
LEED Coordination
Markets We Serve
Office / CorporateRetailMedicalEntertainmentHospitalityTTransportationInstitutionalNon-ProfitsEducationDistressed Property
Product Types
New ConstructionRenovation / RemodelRenovation / RemodelRetrofitsTenant ImprovementSite work
SELECT REPRESENTATIVE PROJECTS
Project Name Description Size / SF Service Type Location ClientYear
Complete
Veolia Transportation Washington Facility
Renovation of an existing 5 acre site into 5,000sf of office space with 10,000sf of maintanence area and bus parking. Scope of work included rework and renovation of office and maintanence areas to conform to Veolia Transportation and DOT requirements. Includes installation of propane fueling, buswash, and CNG fueling facilities.
15,000sf - 5 Acre Site
General Contractor / Design
Transportation Los Angeles, CA Veolia Transportation In Progress
AFEX Corporate Office Renovation of an existing 24,000sf concrete tilt-up building to allow for the consolidation of AFEX Corporate headquarters into one local facility. Includes all renovations, new server / data room facility and migration of AFEX's existing computer systems to the new location.
24,000sf General Contractor / Design
Office / Corp Los Angeles, CA AFEX, Inc. In Progress
Haronian Medical Bldg New construction of a three story medical office bldg including surgery centers, all associated sitework, emergency generators and all interior buildout.
30,000sf CM - Agency Medical Los Angeles, CA Osteon Enterprises, LLC
In Progress
Breakthru Fitness Expansion Expansion of an existing 14,000sf fitness center to incorporate a new format speed school. Includes all interior buildout and FFE coordination
3,500sf General Contractor / Design
Health/Retail Pasadena, CA Breakthru Fitness 2012
2221 Lincoln Blvd Complete interior demoltion of an existing two-story commercial bldg. Scope of work includes the renovation of all interior core areas and the exterior of the building.
9,000sf Design Venice, CA SR Partners In Progress
SELECT REPRESENTATIVE PROJECTS
Project Name Description Size / SF Service Type Location ClientYear
Complete
Baldwin Hills Crenshaw Plaza Mall Renovation - Post & Beam Restaurant
Construction Management (Agent) within the scope of the 30M renovation of BHCP including: Post & Beam Restaurant: complete demolition and renovation of an existing building to become a new, botique restaurant. Includes full interior remodel, commercial kitchen, bar, and exterior.
2,500sf CM - Agency Restaurant Los Angeles, CA The Wolf Group / Capri Capital
2012
Baldwin Hills Crenshaw Plaza Mall Renovation - Staples
Construction Management (Agent) within the scope of the 30M renovation of BHCP including: Staples: Ground up, build-to-suit, construction of an 18,000sf Staples store. Complete with the demolition of three existing buildings on the BHCP Mall property and all related site-work and site improvements. Scope included the management of the permitting / plan -check process thru the City of Los Angeles
18,000sf CM - Agency Retail Los Angeles, CA The Wolf Group / Capri Capital
2011
Baldwin Hills Crenshaw Plaza Mall Renovation - Rave Multi-Plex Theatre
Construction Management (Agent) within the scope of the 30M renovation of BHCP including: Rave Theatre: complete interior and exterior renovation of an existing 60,000sf+ former Magic Johnson Theatre into a state of the art, 15 auditorium, multi-plex theatre complete with digital technology, 3D screens and the Rave Xtreme auditorium format. The entire project was fast tracked and completed in 4 months.
60,000sf CM - Agency Entertainment Los Angeles, CA The Wolf Group / Capri Capital
2011
SELECT REPRESENTATIVE PROJECTS
Project Name Description Size / SF Service Type Location ClientYear
Complete
Champion CM Miscellaneous CM services for various mixed use project sites such as review of proposed tenant TI plans, investigation / repairs to water intrusion issues and other building issues. Developer warranty repairs to individual units.
N/A CM - Agency Misc Various Champion Development 2010
Mike & Annes Interior design / permitting of a new restaurant including all interior layout and finish selection. Including new commercial kitchen design.
3,000sf Architecture Sierra Madre, CA Mike & Anne's 2011
The Dalton New construction of a 55 unit mixed use condominium building with 7,000sf of commercial space over subterranean parking.
65,000sf CM - Agency Mixed Use Pasadena, CA Champion Development. 2008
High Pressure Water Main Installed 400lf of 12in high pressure water line in the public right away for a group of three adjacent developments. Included coordination with all effected property owners and the relocation and reinstallation of various facilities such as existing fire hydrants etc.
CM - Agency Utilities Pasadena, CA Champion Development, Terrabella West, and West Development
2006
Irwindale Commerce Center New construction of three separate retail buildings on a on a raw, 5 acre parcel
25,000sf CM - Agency Retail Irwindale, CA Irwindale 4th Street Associates, LLC
2004
AFEX Tenant Improvement of an existing tenant space into a new format financial services company
2,700sf General Contractor / Design
Office / Corp Beverly Hills, CA AFEX, Inc. 2011
SELECT REPRESENTATIVE PROJECTS
Project Name Description Size / SF Service Type Location ClientYear
Complete
CCS Stores Interior demo and remodel of the interiors of existing CCS stores revise both the floor plans, security enclosures, restrooms and finishes. Phased construction was completed during the course of normal business operations. Eight (8) locations to date
3-5.000sf General Contractor / Design
Retail Various Continental Currency 2010
Arbour Bldg - Suite 102 Remodel and existing Class A office space including floor plan changes and all finishes. Fast-track
2,000sf General Contractor / Design
Office / Corp Pasadena, CA Hayes & Company 2010
Breakthru Fitness Locker Rm Expansion
Remodel and expansion of existing men's locker room. Including modfications to the existing women's restroom access due to the locker room expansion.
1,000sf General Contractor / Design
Remodel Pasadena, CA Breakthru Fitness 2010
Dalton Shell Modifications Remodel / Modifications to existing shell retail spaces including subdivision of larger spaces, modifications to all utilities stubbed into spaces, and entrance modficiations.
7,100sf General Contractor / Design
Remodel Pasadena, CA Champion Development 2010
Spring Street Facility Demolish and renovate an existing 10,000sf warehouse into a DASH bus maintanence facility. Install bus wash, and bus fueling stations into the existing parking lot.
10,000sf / 1.5 acre
General Contractor / Design
Institutiional Los Angeles, CA Veolia Transportation 2009
Arbour Bldg - Suite 105 Remodel and existing Class A office space including floor plan changes and all finishes. Fast-track
3,000sf General Contractor / Design
Office / Corp Pasadena, CA Hayes & Company 2009
Boys & Girls Club Pool Facilty
Replace existing pools facilities ceiling with a moisture resistant product, install daylighting systems, and install new lighting.
3,000sf General Contractor / Design
Institutiional Pasadena, CA Boys & Girls Club of Pasadena
2009
SELECT REPRESENTATIVE PROJECTS
Project Name Description Size / SF Service Type Location ClientYear
Complete
Naud Street Facility Demolish and renovate an existing 16,000sf warehouse into 5,000sf of office and 11,000sf of bus maintanence area. Includes demolition of existing 1.5acre area to become a bus storage, bus wash and bus fueling facility.
16,000sf / 2acre
General Contractor / Design
Institutiional Los Angeles, CA Veolia Transportation 2008
Arbour Bldg - Suite 104 Remodel and existing Class A office space including floor plan changes and all finishes. Fast-track
2,500sf General Contractor / Design
Office / Corp Pasadena, CA Hayes & Company 2008
Public Works Seismic retrofit of an existing structure and complete interior renovation, including new restrooms, extension of an existing mezzanine level, installation of new fire alarm system and installation of a new elevator - all while mainaining normal operations of the non-profit organization.
11,000sf General Contractor Institutiional Pasadena, CA Public Works 2007
Dalton Sales Office Interior tenant improvement for a new sales office for the adjacent Mixed Use project
1,000sf General Contractor / Design
Retail Pasadena, CA Champion Development 2007
CCS Hollywood Façade Renovation
Exterior façade improvement of an existing retail building on famed Hollywood Blvd.
6,200sf General Contractor / Design
Remodel Hollywood, CA Continental Currency 2006
San Antonio Winery Parking Demolition of existing structures and parking lot to modify drainage, landscaping, and site lighting into a larger parking lot for the winery facility. Included working around a 10" underground petroleum transport pipeline that bisected the property.
2 acres General Contractor / Design
Site Improvement Los Angeles, CA San Antonio Winery 2005
SELECT REPRESENTATIVE PROJECTS
Project Name Description Size / SF Service Type Location ClientYear
Complete
San Antonio Winery Barrel Room
Demising an existing warehouse and buildout of all necessary infrastructure including drainage, insulation, HVAC, and access to allow for its use as a wine aging area.
20,000sf General Contractor Remodel Los Angeles, CA San Antonio Winery 2005
Weldex Workstations Installation of 80 future workstations in an existing building. Consisted of all data and power backbone modifications to the building, to each station and to server location
6,500sf General Contractor TI Cerritos, CA RIA Financial Services 2005
RIA Generator Buildout of an interior backup generator room and the installation of a new 225kva backup generator. Installation and tie-in to existing systems during the normal operation of an on-going internet based financial institution.
10,000sf General Contractor / Design
TI Cerritos, CA RIA Financial Services 2005
1855 N Main Rework of main buiding electrical, installation of new fire sprinklers, and fire alarms for two ongoing TI on two floors. Both charter school uses (KIPP / PUC) were being built out during the course of the shell building modifications.
60,000sf General Contractor / Design
Remodel Los Angeles, CA SR Partners 2005
East L.A. Light & Life Classroom Bldg
New construction of an elementary school classroom building consisting of four classrooms with corresponding restroom facilities.
3,500sf General Contractor / Design
Education Los Angeles, CA Free Methodist Church of Southern Calif.
2004
University Club Commercial kitchen remodel 1,500sf General Contractor Remodel Pasadena, CA University Club 2004
Breakthru Fitness Center Construction of a private fitness training center
3,800/sf General Contractor / Design
TI Pasadena, CA SR Partners 2003
SELECT REPRESENTATIVE PROJECTS
Project Name Description Size / SF Service Type Location ClientYear
Complete
San Antonio Winery Tasting Room
Remodel of the winery retail sales / tasting room facility
2,500/sf General Contractor TI Ontario, CA San Antonio Winery 2003
Bank of America Exterior façade / site renovation, during the course of demising the building from one existing bank tenant into two tenants. Includes façade renovations, new main building electrical service and vault, exterior patios, walls, canopies and site lighting.
10,000sf General Contractor / Design
Remodel 2003
San Antonio Winery Corp Office
Phased remodel of existing corporate office 3,000/sf General Contractor TI Los Angeles, CA San Antonio Winery 2002
Regency Centers Corp Office Remodel of a portion of the existing corporate executive suites
1,000/sf General Contractor TI Los Angeles, CA Regency Centers 2002
** Arclight Theatres Interior buildout, in a newly constructed shell building, of a 14 theatre luxury multi-plex. Included a restaurant and two bars. Located adjacent to the Hollywood Cineramadome.
145,000sf General Contractor Entertainment Hollywood, CA Pacific Theatres 2002
** Lucent Technologies New construction of a type 1 building housing a Lucent technologies wafer manufacturing facility. Project to include a Japanese Type 1 clean room facility and sub-terranean precious metals vault.
175,000sf General Contractor Manufacturing Irwindale, CA Lucent Technologies 2000
** AM Gateway Site Development of a 5 acre parcel into three pads to be developed by future tenants. Sitwork consisted of all utiliites to pads, and extensive offsite improvements such as widening of the City right of way and associated relocation of underground storm systems, street lighting, etc.
5 acres General Contractor Site Improvement Monrovia, CA AM Gateway Associates 1999
SELECT REPRESENTATIVE PROJECTS
Project Name Description Size / SF Service Type Location ClientYear
Complete
** Office Depot New construction on a raw parcel of a 26,00sf Office Depot store. Included constrution of a 200ft +/- retaining wall on the Property line at the low end of the property, a portion of which was incorporated into the building itself.
26,000sf / 3 acre
General Contractor Retail La Crescenta, CA Regency Centers 1999
** Mission Road DOT Facility Remodel of existing industrial facility into a mixed use office, maintanence and storage facility for The Dept. of Transportation. Work was completed in two existing buildings and associated sitework. 10,000sf of office space, 20,000sf of warehouse storage space, and 35,000sf space for vehicle maintanence.
65,000sf General Contractor Remodel Los Angeles, CA SR Partners 1999
** AM Gateway Retail New shell construction of a retail building. Including all applicable site work.
18,000sf General Contractor Retail Monrovia, CA AM Gateway Associates 1999
** 2555 Colorado Façade Façade renovation of an existing four story building, including all exterior "skin", windows and lobby & elevator remodel. Building was occupied during the course of construction.
40,000sf General Contractor Remodel Pasadena, CA Stivers Development 1999
** 133 N Altadena Façade Façade renovation of an existing four story building, including all exterior "skin", windows and lobby & elevator remodel. Included cutting in curtain wall storefront systems into the full height of the existing building.
50,000sf General Contractor Remodel Pasadena, CA Stivers Development 1999
** Colorado Plaza Demolish an existing 4,000sf masonry building to construct an exterior plaza and parking area for an adjoining building.
8,000sf General Contractor Site Improvement Pasadena, CA Stivers Development 1999
SELECT REPRESENTATIVE PROJECTS
Project Name Description Size / SF Service Type Location ClientYear
Complete
** Gelson's Market Interior buildout, in a newly constructed shell building, of a Gelsons Supermarket
40,000sf General Contractor Retail Irvine, CA Gelson's Markets 1999
** Rite Aid Remodel Program Remodel of exising Thrifty Stores to fit the new Rite Aid format. All stores were phased remodels during on-going operations
15,000sf General Contractor Retail Various Rite Aid 1998
** Principal experience with prior employer