Download - job presentation 2
I worked as an intern at HALLMARK
INDUSTRIES, lower parel
Was appointed as a Junior
Merchandiser
• CHART PREPARATION FOR SALES MAN SAMPLING.
1.Clicked photographs 2. Inserted them in excel 3. Made categories
4. Accessories Requirement and availability.
5. Fabric Requirement and its availability.
Work allocated
• HELP IN MAKING BUYER CATALOGUE1. Checking technical sketches sent by
designer
2. Correspondence with the designer on email for making changes.
• DEVELOPING SAMPLES FOR NEW BUYER 1. Studying buyers original styles2. Developing new styles3. Fabric sourcing4. Trims Requirements5. Embriodery & Prints.6. Developed to Logos for this purpose.
SALES MAN SAMPLING PROCESS
Costing
Tech Pack
Garment listsJob Cards
Original samples
MERCHANDISING PROCESS
SALES MAN SAMPLING PROCESS
Development of embriodery and prints
Fabric & trim arrangement
Production of SMS
Sending all production requirements to masterji
GARMENT STICHING PROCESS• Patternmaking on paper and then tracing it on the cloth. These patterns are traced on a single fabric
These patterns are traced on a single fabric but when they are cut many fabrics are piled up under the marked fabric so that it becomes easy.
• The fabrics are not cut by a simple scissor but a hand knife mashine A hand knife machine is the one in which the machine can be moved according to the curves like a paint brush. The cutting process is shown below:-
• After the cutting process is done it is been handed over to the tailors to stitch them according to the patterns.
• There was a fusing machine present in the factory. Instead of using an iron we use the fusing machine so that the temperature, pressure and time is uniform.
• After the stitching is done the garment is always ironed with an ironing machine. In order to help a crisp iron ironing is done on a vacuum table.
A vacuum table settles the fabric on the table making the surface og the garment flat.
WORKING EXPERIENCE
• As far as creativity is concerned we are expected to think out of the box.
• It is necessary to prioritize work and not try to do all the things at the same time.
• A good rapport with the colleagues is very important to undertake the entire production process.
• And lastly, dedication towards the work is very important as it increases work efficiency.