  • 1Pgina :S10

    Precios y cantidades de recursos requeridosObra MEJORAMIENTO DE LA INFRAESTRUCTURA DE RIEGO EN EL CENTRO POBLADO DE

    YARUCAYA0202004

    01/10/2015FechaLIMA - OYON - COCHAMARCALugar 150904

    CantidadUnidadRecursoCdigo Precio S/. Parcial S/.

    MANO DE OBRA 408.5800 8,964.16 21.94CAPATAZ0101010002 hh 461.9100 8,443.64 18.28OPERARIO0101010003 hh

    2,909.1800 44,539.50 15.31OFICIAL0101010004 hh 2,891.4900 39,815.82 13.77PEON0101010005 hh

    6.6200 128.33 19.38OPERARIO TOPOGRAFO01010300000005 hh 6.4400 30.25 4.70CONTROLADOR OFICIAL01010300080001 hh

    101,921.70MATERIALES

    0.1400 5.68 41.17ACEITE PARA MOTOR SAE-300201010023 gal 0.3100 1.18 3.78GRASA0201020012 kg 3.0900 28.79 9.32GASOLINA 8402010300010001 gal

    10.6400 26.18 2.46ASFALTO RC-25002010500010001 gal 940.2800 2,313.09 2.46ALAMBRE NEGRO RECOCIDO N 802040100010001 kg

    34,280.8900 84,330.99 2.46ALAMBRE NEGRO RECOCIDO N 1602040100010002 kg 1.0300 4.62 4.50ALAMBRE NEGRO N 1602040100020001 kg

    19,654.2600 48,742.57 2.48ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60

    0204030001 kg

    1,446.7900 5,642.50 3.90CLAVOS PARA MADERA CON CABEZA DE 3"

    02041200010005 kg

    0.1500 0.59 3.90CLAVOS PARA MADERA CON CABEZA DE 4"

    02041200010007 kg

    379.6800 14,427.81 38.00PIEDRA CHANCADA 1/2" - 3/4"02070100010005 m3 1.9900 79.46 40.00PIEDRA MEDIANA DE 6"02070100050002 m3

    12.7100 508.23 40.00PIEDRA GRANDE DE 8"0207010006 m3 1.0700 39.41 37.00ARENA FINA02070200010001 m3

    208.3400 7,291.96 35.00ARENA GRUESA02070200010002 m3 51.7100 2,068.37 40.00HORMIGON0207030001 m3

    593.9600 5,939.58 10.00AGUA PUESTA EN OBRA0207070001 m3 163.4000 4,052.23 24.80CEMENTO PORTLAND TIPO I (42.5 kg)0213010001 bol

    6,407.9100 158,916.26 24.80CEMENTO PORTLAND TIPO V0213010003 bol 19.8700 371.48 18.70TIZA0213040001 kg

    0.1800 36.80 205.00CONCRETO PREMEZCLADO F'C=140 kg/cm2 CON CEMENTO TIPO V

    02190100010007 m3

    0.0900 10.72 113.45ADITIVO DESMOLDANTE CHEMALAC0222140008 gal 164.5700 13,988.74 85.00ADITIVO IMPERMEABILIZANTE02221700010044 gal

    1,533.0900 7,512.15 4.90MADERA TORNILLO0231010001 p2 304.3900 980.12 3.22MADERA TORNILLO PARA ENCOFRADOS

    INCLUYE CORTE0231010002 p2

    9.0000 193.50 21.50TRIPLAY LUPUNA 4 x 8 x 4 mm02310500010001 pln 33.1100 982.01 29.66PINTURA ESMALTE0240020001 gal

    1.6000 59.44 37.15PINTURA ESMALTE SINTETICO TEKNO0240020003 gal 1.6000 59.44 37.15PINTURA ANTICORROSIVA0240070001 gal 1.6000 16.96 10.60THINNER0240080012 gal

    358,630.86EQUIPOS

    0.8300 82.78 100.00NIVEL TOPOGRAFICO0301000002 da 5,682.78HERRAMIENTAS MANUALES0301010006 %mo

    608.9700 2,435.88 4.00REGLA MADERA TORNILLO CEPILLADA03010300010009 p2 12.7900 2,335.56 182.57CARGADOR SOBRE LLANTAS DE 125-135

    HP 3 yd303011600010003 hm

    139.9300 31,125.48 222.43EXCAVADORA SOBRE ORUGAS 115-165 HP

    03011700010001 hm

    38.4600 10,280.63 267.33CAMION VOLQUETE DE 15 m303012200040001 hm 24.4000 138.12 5.66VIBRADOR DE CONCRETO 4 HP 2.40"03012900010005 hm 51.9500 498.72 9.60MEZCLADORA DE CONCRETO 11 P3 (18

    HP)03012900030004 hm

    36.4200 413.36 11.35CORDEL03014900010001 rll

    52,993.31SUBCONTRATOS

    1.0000 5,000.00 5,000.00SC MOVILIZACION Y DESMOVILIZACION DE EQUIPO

    04240100010001 glb

    1.0000 1,800.00 1,800.00SC INSTALACION DE COMPUERTA TIPO IZAJE

    04250200020012 glb

    1.0000 1,300.00 1,300.00SC INSTALACION DE TAPA METALICA04250200020013 glb

    8,100.00

    TOTAL S/. 521,645.87

    20/07/2015 04:47:07p.m.Fecha :