CRONOGRAMA VALORIZADO DE EJECUCIÓN DE OBRA EXPEDIENTE TÉCNICO COMPONENTES TOTAL S/. CRONOGRAMA DE EJECUCION DE OBR MES 01 MES 02 MES 03 MES 04 MES 05 01 COMPONENTE 01: (SISTEMA DE AGUA POTABLE) 1,355,993.09 01.01 INSTALACIONES PROVISIONALES 7,484.80 7,484.80 100% 01.02 864,505.40 01.02.01 CAPTACION DE LADERA (19 UND) 74,470.29 22,341.09 37,235.15 14,894.06 30% 50% 20% 01.02.02 91,047.97 36,419.19 54,628.78 40% 60% 01.02.03 12,227.21 6,113.61 6,113.61 50% 50% 01.02.04 3,120.06 3,120.06 100% 01.02.05 6,917.91 3,113.06 3,804.85 45% 55% 01.02.06 3,120.06 3,120.06 100% 01.02.07 58,142.69 01.02.07.01 50,882.17 10,176.43 25,441.09 15,264.65 20% 50% 30% 01.02.07.02 7,260.52 3,630.26 3,630.26 50% 50% 01.02.08 29,194.50 01.02.08.01 PASE AEREO CON TUBERIA DE F° G° Ø 1" DE 30 ML 17,909.69 2,686.45 15,223.24 15% 85% 01.02.08.02 PASE AEREO CON TUBERIA DE F° G° Ø 1" DE 10 ML 11,284.81 1,128.48 10,156.33 10% 90% 01.02.09 4,250.76 2,975.53 1,275.23 70% 30% 01.02.10 440,656.48 44,065.65 264,393.89 10% 60% 01.02.11 VALVULAS DE CONTROL (23 UND.) 3,530.96 : "AMPLIACIÓN Y MEJORAMIENTO DEL SISTEMA DE SANEAMIENTO BASICO INTEGRAL EN LAS COMUN DE CHECCA - PROVINCIA DE CANAS - CUSCO" LINEA DE CONDUCCION, L=2753.71 m.l. , TUBERIA PVC-SAP RESERVORIO C°A° DE 15 m3 - SUB SISTEMA: 02 RESERVORIO C°A° DE 3 m3 - SUB SISTEMA: 01 RESERVORIOS CON ROTOPLAS DE (600, 1100 Litros) RESERVORIOS CON ROTOPLAS DE (600 Litros) - 15 UNID. RESERVORIOS CON ROTOPLAS DE (1100 Litros) - 02 UNID. PASES AEREOS (04 UND.) CAMARA DISTRIBUIDORA DE CAUDALES (02 UND.) RED DE DISTRIBUCION - ADUCCION (15,585.33 m.l.)

Upload: paul-huamanvilca-huamani

Post on 10-Dec-2015

4 views

Category:

Documents


0 download

DESCRIPTION

EXEL PARA CRONOGRAMA AVANCE VALORIZADO

TRANSCRIPT

Page 1: Cronograma Avance Valorizado

CRONOGRAMA VALORIZADO DE EJECUCIÓN DE OBRA

EXPEDIENTE TÉCNICO

COMPONENTES TOTAL S/.CRONOGRAMA DE EJECUCION DE OBRA

MES 01 MES 02 MES 03 MES 04 MES 05 MES 06 MES 07 MES 08

01 COMPONENTE 01: (SISTEMA DE AGUA POTABLE) 1,355,993.09

01.01 INSTALACIONES PROVISIONALES 7,484.80 7,484.80

100%

01.02 864,505.40

01.02.01 CAPTACION DE LADERA (19 UND) 74,470.29 22,341.09 37,235.15 14,894.06

30% 50% 20%

01.02.02 91,047.97 36,419.19 54,628.78

40% 60%

01.02.03 12,227.21 6,113.61 6,113.61

50% 50%

01.02.04 3,120.06 3,120.06

100%

01.02.05 6,917.91 3,113.06 3,804.85

45% 55%

01.02.06 3,120.06 3,120.06

100%

01.02.07 58,142.69

01.02.07.01 50,882.17 10,176.43 25,441.09 15,264.65

20% 50% 30%

01.02.07.02 7,260.52 3,630.26 3,630.26

50% 50%

01.02.08 29,194.50

01.02.08.01 PASE AEREO CON TUBERIA DE F° G° Ø 1" DE 30 ML 17,909.69 2,686.45 15,223.24

15% 85%

01.02.08.02 PASE AEREO CON TUBERIA DE F° G° Ø 1" DE 10 ML 11,284.81 1,128.48 10,156.33

10% 90%

01.02.09 4,250.76 2,975.53 1,275.23

70% 30%

01.02.10 440,656.48 44,065.65 264,393.89 132,196.94

10% 60% 30%

01.02.11 VALVULAS DE CONTROL (23 UND.) 3,530.96 3,530.96

100%

: "AMPLIACIÓN Y MEJORAMIENTO DEL SISTEMA DE SANEAMIENTO BASICO INTEGRAL EN LAS COMUNIDADES DE SAUSAYA Y TACOMAYO, DEL DISTRITO DE CHECCA - PROVINCIA DE CANAS - CUSCO"

SISTEMA DE AGUA POTABLE, ( 203 BENEF.) - C.C. SAUSAYA

LINEA DE CONDUCCION, L=2753.71 m.l. , TUBERIA PVC-SAP

RESERVORIO C°A° DE 15 m3 - SUB SISTEMA: 02

CASETA DE VALVULAS RESERVORIO DE 15 m3 - SUB SISTEMA:02

RESERVORIO C°A° DE 3 m3 - SUB SISTEMA: 01

CASETA DE VALVULAS RESERVORIO DE 3 m3 - SUB SISTEMA:01

RESERVORIOS CON ROTOPLAS DE (600, 1100 Litros)

RESERVORIOS CON ROTOPLAS DE (600 Litros) - 15 UNID.

RESERVORIOS CON ROTOPLAS DE (1100 Litros) - 02 UNID.

PASES AEREOS (04 UND.)

CAMARA DISTRIBUIDORA DE CAUDALES (02 UND.)

RED DE DISTRIBUCION - ADUCCION (15,585.33 m.l.)

Page 2: Cronograma Avance Valorizado

CRONOGRAMA VALORIZADO DE EJECUCIÓN DE OBRA

EXPEDIENTE TÉCNICO

COMPONENTES TOTAL S/.CRONOGRAMA DE EJECUCION DE OBRA

MES 01 MES 02 MES 03 MES 04 MES 05 MES 06 MES 07 MES 08

: "AMPLIACIÓN Y MEJORAMIENTO DEL SISTEMA DE SANEAMIENTO BASICO INTEGRAL EN LAS COMUNIDADES DE SAUSAYA Y TACOMAYO, DEL DISTRITO DE CHECCA - PROVINCIA DE CANAS - CUSCO"

01.02.12 VALVULAS DE PURGA (41 UND.) 4,876.95 4,876.95

100%

01.02.13 INSTALACION PILETAS DOMICILIARIAS TIPO II - VIVIENDAS (203 UND) 130,057.32 6,502.87 52,022.93 52,022.93 19,508.60

5% 40% 40% 15%

01.02.14 DEMOLICION DE ESTRUCTURAS EXISTENTES 2,892.24 1,735.34 1,156.90

60% 40%

01.03 484,002.89

01.03.01 CAPTACION DE LADERA (12 UND) 95,819.53 28,745.86 67,073.67

30% 70%

01.03.02 22,580.40 22,580.40

100%

01.03.03 13,069.67 13,069.67

100%

01.03.04 3,180.84 2,862.76 318.08

90% 10%

01.03.05 6,917.91 6,917.91

100%

01.03.06 3,120.06 3,120.06

100%

01.03.07 55,753.74

01.03.07.01 55,753.74 44,602.99 11,150.75

80% 20%

01.03.08 7,383.22

01.03.08.01 PASE AEREO CON TUBERIA DE F° G° Ø 1" DE 20 ML 7,383.22 7,383.22

100%

01.03.09 1,048.47 1,048.47

100%

01.03.10 198,460.11 128,999.07 69,461.04

65% 35%

01.03.11 VALVULAS DE CONTROL (19 UND.) 2,916.88 2,916.88

100%

01.03.12 VALVULAS DE PURGA (26 UND.) 3,092.70 3,092.70

SISTEMA DE AGUA POTABLE, ( 104 BENEF.) - C.C. TACOMAYO

LINEA DE CONDUCCION, L=1,206.74 m.l. , TUBERIA PVC-SAP

RESERVORIO C°A° DE 8 m3 - SUB SISTEMA: 01

CASETA DE VALVULAS RESERVORIO DE 8 m3 - SUB SISTEMA:01

RESERVORIO C°A° DE 3 m3 - SUB SISTEMA: 03

CASETA DE VALVULAS RESERVORIO DE 3 m3 - SUB SISTEMA:03

RESERVORIOS CON ROTOPLAS DE (600 Litros)

RESERVORIOS CON ROTOPLAS DE (600 Litros) - 09 UNID.

PASES AEREOS (01 UND.)

CAMARA DE REUNION (01 UND.)

RED DE DISTRIBUCION - ADUCCION, L=10,931.61 m.l., TUBERIA PVC-SAP

Page 3: Cronograma Avance Valorizado

CRONOGRAMA VALORIZADO DE EJECUCIÓN DE OBRA

EXPEDIENTE TÉCNICO

COMPONENTES TOTAL S/.CRONOGRAMA DE EJECUCION DE OBRA

MES 01 MES 02 MES 03 MES 04 MES 05 MES 06 MES 07 MES 08

: "AMPLIACIÓN Y MEJORAMIENTO DEL SISTEMA DE SANEAMIENTO BASICO INTEGRAL EN LAS COMUNIDADES DE SAUSAYA Y TACOMAYO, DEL DISTRITO DE CHECCA - PROVINCIA DE CANAS - CUSCO"

100%

01.03.13 INSTALACION PILETAS DOMICILIARIAS TIPO II - VIVIENDAS (104 UND) 68,731.20 34,365.60 34,365.60

50% 50%

01.03.14 DEMOLICION DE ESTRUCTURAS EXISTENTES 1,928.16 1,928.16

100%

02 COMPONENTE 02: (SISTEMA DE ELIMINACION DE EXCRETAS) 2,245,362.24

02.01 1,362,616.27

02.01.01 LETRINAS CON ARRASTRE HIDRAULICO ESTANDAR - VIVIENDAS (203 UND 834,291.04 83,429.10 333,716.42 333,716.42 83,429.10

10% 40% 40% 10%

02.01.02 POZO DE ABSORCION PARA PILETAS DOMICILIARIAS (203 UND.) 77,841.99 38,921.00 38,921.00

50% 50%

02.01.03 BIODIGESTORES (203 UND.) 333,359.77 100,007.93 200,015.86 33,335.98

30% 60% 10%

02.01.04 CAJA DE LODOS (203 UND.) 55,072.48 44,057.98 11,014.50

80% 20%

02.01.05 POZO DE PERCOLACION (203 UND.) 62,050.99 43,435.69 18,615.30

70% 30%

02.02 680,580.49

02.02.01 LETRINAS CON ARRASTRE HIDRAULICO ESTANDAR - VIVIENDAS (104 UND 409,494.05 40,949.41 245,696.43 122,848.22

10% 60% 30%

02.02.02 POZO DE ABSORCION PARA PILETAS DOMICILIARIAS (104 UND.) 39,879.64 11,963.89 27,915.75

30% 70%

02.02.03 BIODIGESTORES (104 UND.) 170,785.00 42,696.25 128,088.75

25% 75%

02.02.04 CAJA DE LODOS (104 UND.) 28,631.98 10,021.19 18,610.79

35% 65%

02.02.05 POZO DE PERCOLACION (104 UND.) 31,789.82 9,536.95 22,252.87

30% 70%

02.03 ENSAYOS DE CONTROL DE CALIDAD 1,350.00

02.03.01 PRUEBAS ROTURA BRIQUETAS DE CONCRETO 1,350.00 270.00 270.00 270.00 270.00 270.00

20% 20% 20% 20% 20%

02.04 PLAN DE SEGURIDAD Y CONTINGENCIA EN OBRA 19,000.00

SISTEMA DE ELIMINACION DE EXCRETAS, (203 BENEF.) - C.C. SAUSAYA

SISTEMA DE ELIMINACION DE EXCRETAS, (104 BENEF.) - C.C. TACOMAYO

Page 4: Cronograma Avance Valorizado

CRONOGRAMA VALORIZADO DE EJECUCIÓN DE OBRA

EXPEDIENTE TÉCNICO

COMPONENTES TOTAL S/.CRONOGRAMA DE EJECUCION DE OBRA

MES 01 MES 02 MES 03 MES 04 MES 05 MES 06 MES 07 MES 08

: "AMPLIACIÓN Y MEJORAMIENTO DEL SISTEMA DE SANEAMIENTO BASICO INTEGRAL EN LAS COMUNIDADES DE SAUSAYA Y TACOMAYO, DEL DISTRITO DE CHECCA - PROVINCIA DE CANAS - CUSCO"

02.04.01 EQUIPOS DE PROTECCION PERSONAL-EPP 12,500.00 12,500.00

100%

02.04.02 Recursos para respuestas ante emergencias en seguridad y Salud durante el 6,500.00 6,500.00

100%

02.05 FLETE TRANSPORTE TERRESTRE 176,515.48

02.05.01 TRANSPORTE DE MATERIALES-SAP 74,355.83 59,484.66 14,871.17

80% 20%

02.05.02 TRANSPORTE DE MATERIALES-SAL 102,159.65 81,727.72 20,431.93

80% 20%

02.06 MITIGACION DEL IMPACTO AMBIENTAL 5,300.00

02.06.01 CHARLAS DE SENSIBILIZACION 5,300.00 5,300.00

100%

03 COMPONENTE 03 49,417.50

03.01 PROMOCION, CAPACITACION Y EDUCACION SANITARIA 49,417.50

03.01.01 PROMOCION, CAPACITACION Y EDUCACION SANITARIA 49,417.50 49,417.50

100%

COSTO DIRECTO S/.3,650,772.83 77,571.75 163,578.40 302,639.75 899,491.45 923,638.79 706,911.77 439,749.05 137,191.87GASTOS GENERALES (10%) S/.365,077.28 S/.7,757.17 S/.16,357.84 S/.30,263.98 S/.89,949.14 S/.92,363.88 S/.70,691.18 S/.43,974.91 S/.13,719.19UTILIDAD (8.5%) S/.310,315.69 S/.6,593.60 S/.13,904.16 S/.25,724.38 S/.76,456.77 S/.78,509.30 S/.60,087.50 S/.37,378.67 S/.11,661.31COSTO PARCIAL S/.4,326,165.80 S/.91,922.52 S/.193,840.41 S/.358,628.11 S/.1,065,897.36 S/.1,094,511.97 S/.837,690.45 S/.521,102.63 S/.162,572.36I.G.V. (18%) S/.778,709.84 S/.16,546.05 S/.34,891.27 S/.64,553.06 S/.191,861.53 S/.197,012.15 S/.150,784.28 S/.93,798.47 S/.29,263.03COSTO EJECUCION DE OBRA S/.5,104,875.65 S/.108,468.57 S/.228,731.68 S/.423,181.17 S/.1,257,758.89 S/.1,291,524.12 S/.988,474.73 S/.614,901.10 S/.191,835.39SUPERVISION S/.165,000.00 S/.20,625.00 S/.20,625.00 S/.20,625.00 S/.20,625.00 S/.20,625.00 S/.20,625.00 S/.20,625.00 S/.20,625.00COSTO TOTAL S/.5,269,875.65 S/.129,093.57 S/.249,356.68 S/.443,806.17 S/.1,278,383.89 S/.1,312,149.12 S/.1,009,099.73 S/.635,526.10 S/.212,460.39PORCENTAJE DE AVANCE MENSUAL 100.00% 2.45% 4.73% 8.42% 24.26% 24.90% 19.15% 12.06% 4.03%

Page 5: Cronograma Avance Valorizado

DESCRIPCIÓN DE COMPONENTES INVERSIÓN S/.

C1:INFRAESTRUCTURA BASICA Y ADMINISTR S/. 949,174.51

Estructura S/. 407,320.59

Arquitectura S/. 461,974.68

Instalaciones Sanitarias S/. 33,377.18

Instalaciones Electricas S/. 46,502.06

C2: INFRAESTRUCTURA COMPLEMENTARIAS S/. 670,225.54

Patio de Honor S/. 203,343.85

Veredas, Accesos comunes S/. 166,615.93

Tanque Cisterna y Tanque Elevado S/. 30,138.37

Sardineles S/. 14,686.77

Podio y Asta de Bandera S/. 4,749.63

Cerco Perimetrico S/. 250,690.99

C3: EQUIPAMIENTO Y MOBILIARIO S/. 106,800.00

ión de Mobiliario y Equipamiento Educativo S/. 106,800.00

C4: MITIGACIÓN DE IMPACTOS S/. 20,080.12

de Areas Verdes y Mitigación de Impactos S/. 20,080.12

COSTO DIRECTO S/. 1,746,280.17

GASTOS GENERALES (12.30%) S/. 214,792.46

GASTOS DE SUPERVISION (3.50%) S/. 61,119.81

GASTOS ELAB. EXPEDIENTE TECNICO (2.10%) S/. 36,671.88

GASTOS DE LIQUIDACIÓN DE OBRAS (0.70%) S/. 12,223.96

EVALUACION DE EXPEDIENTE TECNICO (0.40%) S/. 6,985.12

PRESUPUESTO TOTAL S/. 2,078,073.40

RESUMEN DEL PRESUPUESTO DE LA INVERSIÓN DEL PROYECTO

Page 6: Cronograma Avance Valorizado

RESUMEN DEL PRESUPUESTO DE LA INVERSIÓN DEL PROYECTODESCRIPCIÓN DE COMPONENTES INVERSIÓN S/.

C1:INFRAESTRUCTURA BASICA Y ADMINISTRATIVA S/. 949,174.51

Estructura S/. 407,320.59

Arquitectura S/. 461,974.68

Instalaciones Sanitarias S/. 33,377.18

Instalaciones Electricas S/. 46,502.06 C2: INFRAESTRUCTURA COMPLEMENTARIAS S/. 670,225.54

Patio de Honor S/. 203,343.85

Veredas, Accesos comunes S/. 166,615.93

Tanque Cisterna y Tanque Elevado S/. 30,138.37

Sardineles S/. 14,686.77

Podio y Asta de Bandera S/. 4,749.63

Cerco Perimetrico S/. 250,690.99 C3: EQUIPAMIENTO Y MOBILIARIO S/. 106,800.00 Adquisición y Dotación de Mobiliario y Equipamiento Educativo S/. 106,800.00 C4: MITIGACIÓN DE IMPACTOS S/. 20,080.12 Acondicionamiento de Areas Verdes y Mitigación de Impactos S/. 20,080.12

COSTO DIRECTO S/. 1,746,280.17

GASTOS GENERALES (12.30%) 214,792.46

GASTOS DE SUPERVISION (3.50%) 61,119.81

GASTOS ELAB. EXPEDIENTE TECNICO (2.50%) 36,671.88

GASTOS DE LIQUIDACIÓN DE OBRAS (0.70%) 12,223.96

6,985.12PRESUPUESTO TOTAL S/. 2,078,073.40

Page 7: Cronograma Avance Valorizado

4,322.22

320,326.87

3,903.09

759.92

5,277.67

11,878.27

2,174.22

291,123.21

3,118.34

1,463.82

628.33

50,748.37

424,381.43

3,903.09

5,389.48

12,678.84

2,174.22

337,845.68

6,184.43

2,001.76

555.14

53,648.79

1,043,994.28

443,432.23

317,740.12

Page 8: Cronograma Avance Valorizado

281465.525,658.95

92,023.29

16,760.75

4,546.31

6,702.81

536,950.72

389,735.95

5,658.95

109,019.90

19,973.70

7,219.75

5,342.47

34,111.33

25,000.00

4,500.00

Page 9: Cronograma Avance Valorizado

150005.33%