costos y presupuestos hojas de calculo
DESCRIPTION
PUTRANSCRIPT
HOJA DE METRADOS
ITEM DESCRIPCION UNIDAD CANTIDAD REPETIDAS01.00.00 TRABAJO PREELIMINAR01.01.00 LIMPIEZA DE TERRENO NATURAL M2 1 101.02.00 TRAZO Y REPLANTEO PRELIMINAR M202.00.00 MOVIMIENTO DE TIERRAS
ZAPATA Z12 M3 9ZAPATA Z13 M3 1CIMIENTO CORRIDOEJES 27, 28, 30, 31 M3 4EJE 29 M3 1EJE L M3 1EJE M M3 1 MUROS INTERIORES M3 6
M3 6M3 2
LAVADERO CIMIENTO M3 4
HOJA DE METRADOS
A L H PARCIAL TOTAL
9.9 17.75 175.737.9 15.75 124.43
0.9 0.9 1.5 10.940.8 1.35 1.5 1.62
0.45 2.35 1.1 4.650.45 2.4 1.1
0.4 8.5 1.10.4 8.5 1.10.4 1.33 0.40.4 0.16 0.40.4 0.19 0.40.4 0.5 0.4
ITEM PARTIDAS UND MET. P.U.01.00.00 TRABAJOS PRELIMINARES01.01.00 LIMPIEZA DE TERRENO NATURAL M2 175.73 7.1301.02.00 TRAZO Y REPLANTEO PREELIMINAR M2 124.43 4.4902.00.00 MOVIMIENTO DE TIERRAS02.01.00 EXCAVACION PARA ESTRUCTURAS M302.02.00 RELLENO Y COMPACTACION M302.03.00 ACARREO DE MATERIAL EXCEDENTE M302.01.00 ELIMINACION CON VOLQUETE DE MATERIAL M302.05.00 NIVELACION Y COMPACTACION SUB BASE M302.06.00 AFIRMADO CON MATERIAL DE PRESTAMO M3
ANALISIS DE PRECIOS UNITARIOS
01..01.00 LIMPIEZA DE TERRENO NATURALR = M2/DIA MO = 70.00 EQ = 70.00 C = 10P + 4PE CU/M2 = S/. 7.13
CODIGO DESCRIPCION DE RECURSO UND CUADRILLA CANTIDAD PU 147010002 OPERARIO HH 1 0.1143 14.74147010004 PEON HH 4 0.4571 11.45
EQUIPOHERRAMIENTAS MANUALES %MO 3 6.92
02.01.00 EXCAVACION P/ESTR = M3/DIA MO = 280 EQ = 208 C = 1PE CU/M2 = S/. 33.72
CODIGO DESCRIPCION DE RECURSO UND CUADRILLA CANTIDAD PU 147010004 PEON HH 1 2.8571 11.46
EQUIPOHERRAMIENTAS MANUALES %MO 3 32.74
ANALISIS DE PRECIOS UNITARIOS
LIMPIEZA DE TERRENO NATURAL 01.02.00 TRAZO Y REPLANTEOCU/M2 = S/. 7.13 R = M2/DIA MO = 500 EQ = 500 C = 1TO + 1OP + 3PE
PARCIAL CODIGO DESCRIPCION DE RECURSO UND CUADRILLA CANTIDAD1.68 14700032 TOPOGRAFO HH 1 0.0165.24 147010002 OPERARIO HH 1 0.0166.92 147010004 PEON HH 3 0.048
0.21 MATERIALES0.21 YESO SAC 0.02
MADERA Pie2 0.68CLAVOS Kg 0.2
EQUIPOHERRAMIENTAS MANUALES %MO 3
TEODOLITO HM 1 0.016
EXCAVACION P/ESTCU/M2 = S/. 33.72
PARCIAL32.7432.74
0.980.98
ANALISIS DE PRECIOS UNITARIOS
TRAZO Y REPLANTEOCU/M2 = S/. 4.49PU PARCIAL
14.74 0.2414.74 0.2411.46 0.55
1.03
10 0.22.97 2.025.5 1.1
3.2
1.03 0.036.78 0.11
0.14