 PROYECTO: AMPLIACION Y MEJORAMIENTO DE LA I.E. 20133, PROGRAMA DE HABILITACION PROYECTISTA: URBANA FELIPE COSSIO DEL POMAR, CASTILLA-PIURA  Ing ADOLFO M. UISPE MOSCOL - CIP !""#0 UBICACI$N: U%&. FELIPE COSSIO DEL POMAR. CASTILLA PIURA FECHA: NO'IEMBRE 2,00" (TEM DESCRIPCI$N 'OLUMEN )*3+ REAS )*2+ METR a I h n / a i n % I MEJORAMIENTO Y AMPLIACION DE SSHH -INICIAL 01.00.00 T%&4 5%/6*6n%4 01.01.00 Limpieza de terreno man ual Entre Ejes D F y Ejes 3 4 5.60 7.7 1.00 44.63 77.83 01.0!.00 "razo y replanteo preliminar Entre Ejes D F y Ejes 3 4 5.60 7.7 1.00 44.63 0!.03.00 E#$a%a$ion para $imient os E&E' ()*)+)D)E 0.45 3.6! 1.50 4.00 .77 E&E' 1)! 0.45 4.75 1.50 !.00 6.41 I,"E-I- 0.45 4.66 1.!0 1.00 !.5! "" (L /3 1.70

Upload: miguel-saavedra-regalado

Post on 04-Nov-2015

215 views

Category:

Documents


0 download

TRANSCRIPT

METRADOS 20133

PROYECTO: AMPLIACION Y MEJORAMIENTO DE LA I.E. 20133, PROGRAMA DE HABILITACIONPROYECTISTA: DIAMETROS1/4"3/8"1/2"5/8"3/4" 1 de 25URBANA FELIPE COSSIO DEL POMAR, CASTILLA-PIURA Ing ADOLFO M. QUISPE MOSCOL - CIP 98870rea cm20.320.711.292.00 2.84 aUBICACIN: Urb. FELIPE COSSIO DEL POMAR. CASTILLA PIURAFECHA: Peso mi0.250.561.021.60 2.26 NOVIEMBRE 2,008Peso Kg.2.35.049.314.60 20.70TEMDESCRIPCINVOLUMEN (m3)REAS (m2)METRO LINEAL (m)UNDCALCULO DE ACEROaIhnvolainreaInLtunpIvar1/4"3/8"1/2"5/8"total

MEJORAMIENTO Y AMPLIACION DE SSHH -INICIAL01.00.00Trabajos preliminares01.01.00Limpieza de terreno manualEntre Ejes D F y Ejes 3 45.607.971.0044.6344.63

01.02.00Trazo y replanteo preliminarEntre Ejes D F y Ejes 3 45.607.971.0044.63

02.03.00Excavacion para cimientosEJES A-B-C-D-E0.453.621.504.009.77EJES 1-20.454.751.502.006.41INTERIOR0.454.661.201.002.52TOTAL M318.70

PROYECTO: AMPLIACION Y MEJORAMIENTO DE LA I.E. 20133, PROGRAMA DE HABILITACIONPROYECTISTA: DIAMETROS1/4"3/8"1/2"5/8"3/4" 1 de 25URBANA FELIPE COSSIO DEL POMAR, CASTILLA-PIURA Ing ADOLFO M. QUISPE MOSCOL - CIP 98870rea cm20.320.711.292.00 2.84 aUBICACIN: Urb. FELIPE COSSIO DEL POMAR. CASTILLA PIURAFECHA: Peso mi0.250.561.021.60 2.26 NOVIEMBRE 2,008Peso Kg.2.35.049.314.60 20.70TEMDESCRIPCINVOLUMEN (m3)REAS (m2)METRO LINEAL (m)UNDCALCULO DE ACEROaIhnvolainreaInLtunpIvar1/4"3/8"1/2"5/8"total02.10.00Relleno con material afirmado PISOS Y VEREDAS5.607.970.104.464.46

TOTAL M34.46

02.11.00Acarreo de material exedenteTOTAL x1,31.3024.31

03.00.00Obra de concreto simple03.01.00Solado para cimientos corridos0.453.624.006.5160.454.752.004.275

TOTAL M210.79

03.02.00Concreto ciclopeo, C:H 1:10+30% PGEJES A-B-C-D-E0.453.121.005.007.02EJES 1-20.456.261.002.005.63INTERIOR0.454.661.001.002.10TOTAL M314.75

03.03.00Concreto fc =140 kg/cm2 + 30% de PM para sobre cimientosEJES A-B-C-D-E0.153.120.555.001.29EJES 10.152.550.551.000.21EJES 20.156.260.551.000.52INTERIOR0.151.550.551.000.13

TOTAL M32.14

03.04.00Encofrado y desencofrado normal de sobrecimientos hasta 0.30mEJES A-B-C-D-E0.303.1210.009.36EJES 10.302.558.006.12EJES 20.306.268.0015.02INTERIOR

TOTAL M230.50

PROYECTO: AMPLIACION Y MEJORAMIENTO DE LA I.E. 20133, PROGRAMA DE HABILITACIONPROYECTISTA: DIAMETROS1/4"3/8"1/2"5/8"3/4" 1 de 25URBANA FELIPE COSSIO DEL POMAR, CASTILLA-PIURA Ing ADOLFO M. QUISPE MOSCOL - CIP 98870rea cm20.320.711.292.00 2.84 aUBICACIN: Urb. FELIPE COSSIO DEL POMAR. CASTILLA PIURAFECHA: Peso mi0.250.561.021.60 2.26 NOVIEMBRE 2,008Peso Kg.2.35.049.314.60 20.70TEMDESCRIPCINVOLUMEN (m3)REAS (m2)METRO LINEAL (m)UNDCALCULO DE ACEROaIhnvolainreaInLtunpIvar1/4"3/8"1/2"5/8"total04.00.00Obra de concreto armado04.01.00Columnas 04.01.01Concreto fc=210 kg/cm2 en columnasC-1 EJE 10.150.254.105.000.77C-1 EJE 20.150.254.605.000.86TOTAL M31.33

04.01.02Encofrado y desencofrado en columnasC-1 EJE 10.152.705.002.03C-1 EJE 20.153.455.002.59C 1 EJE A -10.352.702.001.89C 1 EJE B-1 0.352.701.000.95C-1 EJE B-20.203.451.000.69C 1 EJE C -10.502.701.001.35C 1 EJE C -20.203.451.000.69C-1 EJE D-10.202.701.000.54C11 EJE -D-20.203.451.000.69C-1 EJE E-10.502.701.001.35C-1 EJE E-20.353.451.001.21

TOTAL ,M213.97

04.01.03Columnas,acero fy=4200 kg/cm2C-15.004.004.1082.0083.645.0022.000.68110.0027.50C-25.004.004.6092.0093.845.0025.000.6885.0021.25226.23

04.02.00Vigas 04.02.01Concreto fc=210 kg/cm2 en vigasVS-102 EJE 1-20.157.010.202.000.42VS -102 EJES A-B-C-D-E0.153.320.205.000.50

TOTAL M30.92

04.02.02Encofrado y desencofrado en vigasVS-102 EJE 1 (EXTERIOR)0.207.011.001.40VS-102 EJE 1 (INTERIOR)0.206.261.001.25VS-102 EJE 1 (FONDO)0.154.601.000.69VS-102 EJE 10.2013.271.002.65VS-102 EJE A-B-C-D-E0.203.1210.006.24

TOTAL M212.47

04.02.03Vigas, acero fy=4200 kg/cm2VS-102 EJE 1-20.157.010.202.004.007.0156.0857.20ESTRIBOS2.0052.000.5860.3215.08VS -102 EJES A-B-C-D-E5.004.003.6272.4073.85ESTRIBOS5.0022.000.5863.8015.9531.030.00131.050.00162.0805.00.00Albaileria05.01.00Muro de soga ladrillo kk de arcilla 1:4 x1.5 cmEJES A-B-C-D-E3.123.265.0050.86EJES 11.662.861.004.75EJES 26.252.751.0017.19INTERIOR2.491.801.004.48

TOTAL M277.27

PROYECTO: AMPLIACION Y MEJORAMIENTO DE LA I.E. 20133, PROGRAMA DE HABILITACIONPROYECTISTA: DIAMETROS1/4"3/8"1/2"5/8"3/4" 1 de 25URBANA FELIPE COSSIO DEL POMAR, CASTILLA-PIURA Ing ADOLFO M. QUISPE MOSCOL - CIP 98870rea cm20.320.711.292.00 2.84 aUBICACIN: Urb. FELIPE COSSIO DEL POMAR. CASTILLA PIURAFECHA: Peso mi0.250.561.021.60 2.26 NOVIEMBRE 2,008Peso Kg.2.35.049.314.60 20.70TEMDESCRIPCINVOLUMEN (m3)REAS (m2)METRO LINEAL (m)UNDCALCULO DE ACEROaIhnvolainreaInLtunpIvar1/4"3/8"1/2"5/8"total

05.02.00Acero en muros 6.005.001.2036.009.0011.870.0011.610.0023.48

06.00.00Revoques ,enlucidos y molduras06.01.00Tarrajeo en Muros exterioresEJES A-B-C-D-E3.123.262.0020.34EJES 11.662.861.004.75EJES 26.252.751.0017.19

TOTAL M242.28

06.02.00Tarrajeo en Muros interioresEJES A-B-C-D-E3.122.068.0051.42EJES 11.661.861.003.09EJES 26.251.751.0010.94EJE MUROS INTERIORES2.490.602.002.99TOTAL M268.43

06.03.00Tarrajeo primario y/o rayado con cemento arena 1:4, 1.5 cmEJES A-B-C-D-E3.121.208.0029.95EJES 11.661.201.001.99EJES 26.251.201.007.50EJE MUROS INTERIORES2.491.202.005.98

TOTAL M245.42

06.04.00Tarrajeo en columnasC-1 EJE 10.152.705.002.03C-1 EJE 20.153.455.002.59C 1 EJE A -10.352.702.001.89C 1 EJE B-1 0.352.701.000.95C-1 EJE B-20.203.451.000.69C 1 EJE C -10.502.701.001.35C 1 EJE C -20.203.451.000.69C-1 EJE D-10.202.701.000.54C11 EJE -D-20.203.451.000.69C-1 EJE E-10.502.701.001.35C-1 EJE E-20.353.451.001.21

TOTAL ,M213.9706.05.00Tarrajeo en vigasVS-102 EJE 1 (EXTERIOR)0.207.011.001.40VS-102 EJE 1 (INTERIOR)0.206.261.001.25VS-102 EJE 1 (FONDO)0.154.601.000.69VS-102 EJE 10.2013.271.002.65VS-102 EJE A-B-C-D-E0.203.1210.006.24

TOTAL M212.4706.06.00Junta de dilatacion6.1216.126.1206,07,00ZCLOS Y CONTRAZCALOS06,07,01ZCALOS H = 0,30MEJES A-E3.622.007.24EJES 12.411.002.41EJES 27.011.007.01TOTAL M216.6606,07,02 CONTRAZCALOSEJES A-B-C-D-E2.871.208.0027.55EJES 10.651.204.003.12EJES 21.571.204.007.54EJE MUROS INTERIORES2.491.202.005.98

TOTAL M244.18

07.00.00PISOS Y VEREDAS07.01.00Falso piso de 4" de Concreto 1:10SH NIAS3.321.5315.08SH NIOS3.321.601.005.31SH NIOS MINUSVLIDOS3.321.615.31PROYECTO: AMPLIACION Y MEJORAMIENTO DE LA I.E. 20133, PROGRAMA DE HABILITACIONPROYECTISTA: DIAMETROS1/4"3/8"1/2"5/8"3/4" 1 de 25URBANA FELIPE COSSIO DEL POMAR, CASTILLA-PIURA Ing ADOLFO M. QUISPE MOSCOL - CIP 98870rea cm20.320.711.292.00 2.84 aUBICACIN: Urb. FELIPE COSSIO DEL POMAR. CASTILLA PIURAFECHA: Peso mi0.250.561.021.60 2.26 NOVIEMBRE 2,008Peso Kg.2.35.049.314.60 20.70TEMDESCRIPCINVOLUMEN (m3)REAS (m2)METRO LINEAL (m)UNDCALCULO DE ACEROaIhnvolainreaInLtunpIvar1/4"3/8"1/2"5/8"totalSH DOCENTES3.321.5315.08TOTAL M220.78

07.02.00Contrapiso e= 25 mm, Mezcla 1:5 SH NIAS3.321.5315.08SH NIOS3.321.601.005.31SH NIOS MINUSVLIDOS3.321.615.31SH DOCENTES3.321.5315.08TOTAL M220.7807.03.00Piso de ceramico 30x30 mmSH NIAS3.321.531.005.08SH NIOS3.321.601.005.31SH NIOS MINUSVLIDOS3.321.601.005.31SH DOCENTES3.321.531.005.08TOTAL M220.78

07.04.00Vereda de concreto fc=140 kg/cm2 E=10cm PASTA 1:2FRONTIS1.487.971.0011.80PSOETERIOR 0.507.971.003.99LATERALES0.503.622.003.62TOTAL M219.40

09.00.00Carpinteria de madera Cedro09.01.00Puerta madera (inc puerta /m2)P2 ( 2,7 X 0,90 )3.00P3 (2,70 X 1,00)1.00TOTAL UNIDADES4.00

09.02.00Ventana de madera cedro alta tipo v1 (inc ventana / m2)V- ( 1,57x 0,50 )4.00TOTAL UNIDADES4.0010.00.00Vidrios, cristales y similares 10.01.00Vidrios semi dobles provicion y coloc. en puert y ventan.puertas (mamparas)0.930.604.002.23ventanas v1.530.502.001.53ventanas h1.600.502.001.605.3610.7657.7011.00.00Coberturas11.01.00Tijeral metalico s/plano (por metro)3.003.00

11.02.00Viguea metalica s/plano (por metro)5.005.00

11.03.00Apoyos en extremos3.003.00

11.04.00Cobertura para techoEternit asbesto cemnto4.827.411.0035.7235.7212.00.00Instalaciones electricas12.01.00Salida p/techo c/cable AWG TW 25 mm + D PVC SAP 3/4"4.004.00

12.02.00Salidad p/toma corriente bi polar doble con PVC.4.004.00

12.03.00Cable electrico TW AWG - MCM N 14- 2.5 mm235.0035.00

PROYECTO: AMPLIACION Y MEJORAMIENTO DE LA I.E. 20133, PROGRAMA DE HABILITACIONPROYECTISTA: DIAMETROS1/4"3/8"1/2"5/8"3/4" 1 de 25URBANA FELIPE COSSIO DEL POMAR, CASTILLA-PIURA Ing ADOLFO M. QUISPE MOSCOL - CIP 98870rea cm20.320.711.292.00 2.84 aUBICACIN: Urb. FELIPE COSSIO DEL POMAR. CASTILLA PIURAFECHA: Peso mi0.250.561.021.60 2.26 NOVIEMBRE 2,008Peso Kg.2.35.049.314.60 20.70TEMDESCRIPCINVOLUMEN (m3)REAS (m2)METRO LINEAL (m)UNDCALCULO DE ACEROaIhnvolainreaInLtunpIvar1/4"3/8"1/2"5/8"total12.04.00Tuberia PVC SAP (electricidad) D= 3/4"35.0035.00

12.05.00Fluorescentes rectos 2 x 40 w Inc. equipo y pantalla 4.004.00

13.00.00Instalacin de red de agua fria SS.HH 13.01.00Salida de agua fria con tuberia de PVC SAP 1/2Baos de nios1.00Baos de nias1.00Bao de minusvlidos1.00bao de docente1.00TOTAL UNDS 4.00

13.02.00Red de distribucion tuberia de 1/2" PVC SAP 30.0030.00

13.03.00Suminstro y colocacion de accesorios PVC SAP4.004.00

14.00.00instalacin de redes sanitarias de desague14.01.00Salida de desague PVC 2"Baos de nios8.00Baos de nias4.00Docentes4.00TOTAL UND16.00

14.02.00Salida de desague PVC 4"Baos de nios8.00Baos de nias4.00Docentes4.00TOTAL UND16.0014.03.00Tuberia de desague PVC SAL 2"Baos de nios7.341.007.34Baos de nias1.001.001.008.34

14.04.00Tuberia de desague PVC SAL 4"Baos de nios y nias26.001.0026.0026.00

14.05.00Suminstro y colocacion de accesorios PVC SAL1.001.00

15.00.00Aparatos sanitarios15.01.00Lavatorio de pared blanco 1 llaveBaos de nios1.00Baos de nias1.00Baos para minusvlidos1.00Baos para docentes1.00TOTAL4.00

15.02.00Urinarios de losas de pico blancoBaos de nios1.001.00

15.03.00Inodoro tanque bajo blancoBaos de nios1.00Baos de nias1.00Baos para minusvlidos1.00Baos para docentes1.00TOTAL4.00

15.04.00sumidero de bronce de bronce 4" provicion y colocacion4.004.00

PROYECTO: AMPLIACION Y MEJORAMIENTO DE LA I.E. 20133, PROGRAMA DE HABILITACIONPROYECTISTA: DIAMETROS1/4"3/8"1/2"5/8"3/4" 1 de 25URBANA FELIPE COSSIO DEL POMAR, CASTILLA-PIURA Ing ADOLFO M. QUISPE MOSCOL - CIP 98870rea cm20.320.711.292.00 2.84 aUBICACIN: Urb. FELIPE COSSIO DEL POMAR. CASTILLA PIURAFECHA: Peso mi0.250.561.021.60 2.26 NOVIEMBRE 2,008Peso Kg.2.35.049.314.60 20.70TEMDESCRIPCINVOLUMEN (m3)REAS (m2)METRO LINEAL (m)UNDCALCULO DE ACEROaIhnvolainreaInLtunpIvar1/4"3/8"1/2"5/8"total

15.05.00Valvula de Llave de paso de 1/24.004.00

16.00.00Pinturas16.01.00Pinturas latex en muros interiores y exteriores16,01,01Muros exterioresEJE A-E3.623.262.0023.60EJE 12.413.061.007.37

TOTAL M230.9816,01,02Muros InterioresEJES A-B-C-D-E3.121.968.0048.92EJES 11.661.501.002.49EJES 26.251.001.006.25EJE MUROS INTERIORES2.490.602.002.99TOTAL M260.65

17.00.00OtrosCurado de estructuras con aguacolumnas9.06vigas4.2513.31