Georgia Residential Energy Code Compliance Certificate* Builder/Design Professional: Phone: Envelope Summary: List the R-Value for the following components: S : f o o r / g n i l i e c t a l F loped/vault ceiling: : l l a w s s a m e d a r g e v o b A : l l a w r o i r e t x E i t t A : l l a w e e n k c i t t A c kneewall sheathing: : s u o u n i t n o c t n e m e s a B : l l a w d u t s t n e m e s a B : s u o u n i t n o c e c a p s l w a r C : l l a w d u t s e c a p s l w a r C Foundation slab: Floors over unconditioned space: Cantilevered Floor: Other insulation: Fenestration Components: : C G H S w o d n i W : r o t c a f - U w o d n i W : C G H S t h g i l y k S : r o t c a f - U t h g i l y k S : r o t c a f - U r o o D e u q a p O : r o t c a f - U r o o D d e z a l G (<50% glazed) Building Envelope Tightness (BET): BET test conducted by: _________________________________ Phone:____________ Fan Flow at 50 Pascals=____________CFM50 Total Conditioned Volume =____________ft 3 ACH50 = CFM50 x 60 / Volume= __________________ ACH50 (must be less than 7 ACH50 ) Low Rise Multifamily Visual Inspection Option (The visual inspection option may be conducted by a third-party instead of the BET test for R-2 buildings only.) Visual inspection conducted by: ___________________________________Phone:___________ Mechanical Summary: Water Heater Energy Factor: ______ ___ Ef Fuel type: Gas Electric Other Number of Heating and Cooling Systems: ______ Heating System Type (choose one): Gas: __________ AFUE Air-Source Heat Pump: _________ HSPF Other: ________________ Efficiency: __________ Cooling System Type (Standard DX, Heat Pump, Geothermal, etc.) :______________ Cooling System Efficiency: ________________ SEER EER Other Heating/Cooling Load Calculations Performed by: ____________________Phone: __________ Total Heating Load (Based on ACCA Man. J or other approved methodology):____________ Btu/h Total Cooling Load (Based on ACCA Man. J or other approved methodology):____________ Btu/h Cooling Sensible Load:_____________ Btu/h Cooling Latent Load :__________ Btu/h Total Air Handler CFM (based on design calculations):_________________CFM Duct Tightness Test Conducted by: ______________________ Phone:___________ CFM25 per 100 ft 2 of conditioned floor area = CFM25 x 100 / Conditioned floor area served If all ducts are not located within conditioned space, builder must verify that either the postconstruction duct leakage to outdoors (PCO 2 , the post construction total duct leakage (PCT 2 , or the rough-in test (RIT) with air 2 . State which method was used to conduct the duct tightness test: duct blower (DB), modified blower door subtraction method (MBDS), or automated multipoint blower door (AMBD). System Method (DB, MBDS, AMBD) Test (PCO, PCT, RIT) CFMArea served (ft 2 ) Test Result 1 2 3 *Note: This permanent certificate shall be posted on or in the electrical distribution panel. Certificate shall be completed by the builder or registered design professional. Where there is more than one value for each component, certificate shall list the value covering the largest area. Builder/Design Professional: Phone: Envelope Summary: List the R-Value for the following components: S : f o o r / g n i l i e c t a l F loped/vault ceiling: : l l a w s s a m e d a r g e v o b A : l l a w r o i r e t x E i t t A : l l a w e e n k c i t t A c kneewall sheathing: : s u o u n i t n o c t n e m e s a B : l l a w d u t s t n e m e s a B : s u o u n i t n o c e c a p s l w a r C : l l a w d u t s e c a p s l w a r C Foundation slab: Floors over unconditioned space: Cantilevered Floor: Other insulation: Fenestration Components: : C G H S w o d n i W : r o t c a f - U w o d n i W : C G H S t h g i l y k S : r o t c a f - U t h g i l y k S : r o t c a f - U r o o D e u q a p O : r o t c a f - U r o o D d e z a l G (<50% glazed) R-30 R-30 R-13 R-13 R-5 N/A R-5 R-5 R-0 R-13 R-13 R-19 R-19 R-4 0.30 SHGC 0.30 SHGC U-0.35 U-0.50 U-0.50 U-0.65 Building Envelope Tightness (BET): BET test conducted by: _________________________________ Phone: Fan Flow at 50 Pascals=____________CFM 50 Total Conditioned Volume =_______ft 3 ACH 50 = CFM 50 x 60 / Volume= __________________ ACH 50 (must be less than 7 ACH50 ) Low Rise Multifamily Visual Inspection Option (The visual inspection option may be conducted by a third-party instead of the BET test for R-2 buildings only.) Visual inspection conducted by: ___________________________________Phone:__________ Compliance Certificate Fact Sheet for the Georgia Building Energy Code developed by Your builder/designer’s name (just in case you forget) ...and his/her contact information (in case you need to call about an issue with your home) ‘Fenestration’ is another word for openings in a building (i.e., windows and doors). R-value vs. U-factor Both of these numbers relate to resistance to thermal conduction, or insulation value. In a nutshell, higher R-values and lower U-factors equate to better insulation, which in turn leads to more comfort in your home and less wasted energy. R = 1 U Hungry for a formula? Here you go: BET Breakdown Struggling to make sense of the mysterious acronyms that dominate the Building Envelope Tightness section? Hopefully this will help a little. ACH 50 CFM 50 (Air Changes per Hour at 50 pascals*) (Cubic Feet per Minute at 50 pascals*) *50 pascals is a simulated testing pressure CFM 50 is the measure of a flow rate—in this case, the volume of air that moves out of your house in a minute under simulated testing pressure. ACH 50 measures the number of times the air in your house changes out in an hour under simulated testing pressure. 1 Cubic Foot 7.5 (1 hour) 4 housefuls of air in = 4 ACH 1 2 3 The Building Envelope Tightness (BET) section contains the results of the BET test conducted on your home. This test helps to determine how leaky the house is by depressur- izing or pressurizing a home with a device called a blower door. Essentially a large, calibrated fan, the blower door helps to measure all of the leaks through the gaps and seams in a house. The energy code requires houses to achieve a value less than 7 ACH 50 (see box to left for more on what this means). Why is a tight building envelope so important? A home without air sealing does a poor job of keeping conditioned air in and unconditioned air out. In the summer, this means hot and muggy air infiltrating and giving your HVAC equipment the workout of its life. Wintertime brings cold drafts and more energy wasted trying to keep a leaky house warm. The primary components of your home’s exterior shell, or ‘building envelope,’ and their insulation values, known as R-values and U-factors (typical values* in red). *The values listed may not necessarily coincide on the same compliance certificate. For example, a house with a crawlspace likely will not have a basement, in which case basement insulation values would not be listed.

Upload: others

Post on 15-Aug-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Compliance Certificate Fact Sheet - Southface Institute€¦ · Certificate shall be completed by the builder or registered design professional. Where there is more than one value

Georgia Residential Energy Code Compliance Certificate*

Builder/Design Professional: Phone:

Envelope Summary:

List the R-Value for the following components:

S:foor/gniliec talF loped/vault ceiling::llaw ssam edarg evobA:llaw roiretxE

ittA:llaweenk cittA c kneewall sheathing::suounitnoc tnemesaB:llaw duts tnemesaB:suounitnoc ecapslwarC:llaw duts ecapslwarC

Foundation slab: Floors over unconditioned space:Cantilevered Floor: Other insulation:

Fenestration Components:

:CGHS wodniW:rotcaf-U wodniW:CGHS thgilykS:rotcaf-U thgilykS:rotcaf-UrooD euqapO:rotcaf-U rooD dezalG

(<50% glazed) Building Envelope Tightness (BET):

BET test conducted by: _________________________________ Phone:____________Fan Flow at 50 Pascals=____________CFM50 Total Conditioned Volume =____________ft3

ACH50 = CFM50 x 60 / Volume= __________________ ACH50 (must be less than 7 ACH50 )

Low Rise Multifamily Visual Inspection Option(The visual inspection option may be conducted by a third-party instead of the BET test for R-2 buildings only.)

Visual inspection conducted by: ___________________________________Phone:___________

Mechanical Summary:

Water Heater Energy Factor: ______ ___Ef Fuel type: Gas Electric Other Number of Heating and Cooling Systems: ______Heating System Type (choose one):

Gas: __________ AFUE Air-Source Heat Pump: _________ HSPF Other: ________________ Efficiency: __________

Cooling System Type (Standard DX, Heat Pump, Geothermal, etc.):______________Cooling System Efficiency: ________________ SEER EER OtherHeating/Cooling Load Calculations Performed by: ____________________Phone: __________Total Heating Load (Based on ACCA Man. J or other approved methodology):____________ Btu/h Total Cooling Load (Based on ACCA Man. J or other approved methodology):____________ Btu/h Cooling Sensible Load:_____________ Btu/h Cooling Latent Load :__________ Btu/hTotal Air Handler CFM (based on design calculations):_________________CFMDuct Tightness Test Conducted by: ______________________ Phone:___________CFM25 per 100 ft2 of conditioned floor area = CFM25 x 100 / Conditioned floor area servedIf all ducts are not located within conditioned space, builder must verify that either the postconstruction duct leakage to outdoors(PCO 2, the post construction total duct leakage (PCT 2, or the rough-in test (RIT) with air

2. State which method was used to conduct the duct tightness test: duct blower (DB), modified blower door subtraction method (MBDS), or automated multipoint blower door (AMBD).

System Method (DB, MBDS, AMBD) Test (PCO, PCT, RIT) CFM25 Area served (ft2) Test Result123

*Note: This permanent certificate shall be posted on or in the electrical distribution panel. Certificate shall be completed by the builder or registered design professional. Where there is more than one value for each component, certificate shall list the value covering the largest area.

Builder/Design Professional: Phone:

Envelope Summary:

List the R-Value for the following components:

S:foor/gniliec talF loped/vault ceiling::llaw ssam edarg evobA:llaw roiretxE

ittA:llaweenk cittA c kneewall sheathing::suounitnoc tnemesaB:llaw duts tnemesaB:suounitnoc ecapslwarC:llaw duts ecapslwarC

Foundation slab: Floors over unconditioned space:Cantilevered Floor: Other insulation:

Fenestration Components:

:CGHS wodniW:rotcaf-U wodniW:CGHS thgilykS:rotcaf-U thgilykS:rotcaf-UrooD euqapO:rotcaf-U rooD dezalG

(<50% glazed)

R-30

R-30

R-13R-13

R-5

N/A

R-5R-5

R-0

R-13R-13

R-19

R-19R-4

0.30 SHGC0.30 SHGC

U-0.35

U-0.50 U-0.50U-0.65

Building Envelope Tightness (BET):

BET test conducted by: _________________________________ Phone:Fan Flow at 50 Pascals=____________CFM50 Total Conditioned Volume =_______ft3

ACH50 = CFM50 x 60 / Volume= __________________ ACH50 (must be less than 7 ACH50 )

Low Rise Multifamily Visual Inspection Option(The visual inspection option may be conducted by a third-party instead of the BET test for R-2 buildings only.)

Visual inspection conducted by: ___________________________________Phone:__________

Compliance Certificate Fact Sheetfor the Georgia Building Energy Code

developed by

Your builder/designer’s name (just in case you forget)

...and his/her contact information(in case you need to call about an issue with your home)

‘Fenestration’ is another word for openings in a building (i.e., windows and doors).

R-value vs. U-factorBoth of these numbers relate to resistance to thermal conduction, or insulation value.In a nutshell, higher R-values and lower U-factors equate to better insulation, which in turn leads to more comfort in your home and less wasted energy.

R = 1UHungry for a formula? Here you go:

BET BreakdownStruggling to make sense of the mysterious acronyms that dominate the Building Envelope Tightness section? Hopefully this will help a little.

ACH50

CFM50

(Air Changes per Hour at 50 pascals*)

(Cubic Feet per Minute at 50 pascals*)

*50 pascals is a simulated testing pressure

CFM50 is the measure of a flow rate—in this case, the volume of air that movesout of your house in a minute under simulated testing pressure.

ACH50 measures the number of times the air in your house changes out in an hour under simulated testing pressure.

≈ 1 Cubic Foot7.5

(1 hour)4 housefuls of air in = 4 ACH

1

2

3The Building Envelope Tightness (BET) section contains the results of the BET test conducted on your home. This test helps to determine how leaky the house is by depressur-izing or pressurizing a home with a device called a blower door.

Essentially a large, calibrated fan, the blower door helps to measure all of the leaks through the gaps and seams in a house. The energy code requires houses to achieve a value less than 7 ACH50 (see box to left for more on what this means).Why is a tight building envelope so important? A home without air sealing does a poor job of keeping conditioned air in and unconditioned air out. In the summer, this means hot and muggy air infiltrating and giving your HVAC equipment the workout of its life. Wintertime brings cold drafts and more energy wasted trying to keep a leaky house warm.

The primary components of your home’s exterior shell, or ‘building envelope,’ and their insulation values, known as R-values and U-factors (typical values* in red).

*The values listed may not necessarily coincide on the same compliancecertificate. For example, a house with a crawlspace likely will not have a basement, in which case basement insulation values would not be listed.

Page 2: Compliance Certificate Fact Sheet - Southface Institute€¦ · Certificate shall be completed by the builder or registered design professional. Where there is more than one value

Compliance Certificate Fact Sheetfor the Georgia Building Energy Code

Georgia Residential Energy Code Compliance Certificate*

Builder/Design Professional: Phone:

Envelope Summary:

List the R-Value for the following components:

S:foor/gniliec talF loped/vault ceiling::llaw ssam edarg evobA:llaw roiretxE

ittA:llaweenk cittA c kneewall sheathing::suounitnoc tnemesaB:llaw duts tnemesaB:suounitnoc ecapslwarC:llaw duts ecapslwarC

Foundation slab: Floors over unconditioned space:Cantilevered Floor: Other insulation:

Fenestration Components:

:CGHS wodniW:rotcaf-U wodniW:CGHS thgilykS:rotcaf-U thgilykS:rotcaf-UrooD euqapO:rotcaf-U rooD dezalG

(<50% glazed) Building Envelope Tightness (BET):

BET test conducted by: _________________________________ Phone:____________Fan Flow at 50 Pascals=____________CFM50 Total Conditioned Volume =____________ft3

ACH50 = CFM50 x 60 / Volume= __________________ ACH50 (must be less than 7 ACH50 )

Low Rise Multifamily Visual Inspection Option(The visual inspection option may be conducted by a third-party instead of the BET test for R-2 buildings only.)

Visual inspection conducted by: ___________________________________Phone:___________

Mechanical Summary:

Water Heater Energy Factor: ______ ___Ef Fuel type: Gas Electric Other Number of Heating and Cooling Systems: ______Heating System Type (choose one):

Gas: __________ AFUE Air-Source Heat Pump: _________ HSPF Other: ________________ Efficiency: __________

Cooling System Type (Standard DX, Heat Pump, Geothermal, etc.):______________Cooling System Efficiency: ________________ SEER EER OtherHeating/Cooling Load Calculations Performed by: ____________________Phone: __________Total Heating Load (Based on ACCA Man. J or other approved methodology):____________ Btu/h Total Cooling Load (Based on ACCA Man. J or other approved methodology):____________ Btu/h Cooling Sensible Load:_____________ Btu/h Cooling Latent Load :__________ Btu/hTotal Air Handler CFM (based on design calculations):_________________CFMDuct Tightness Test Conducted by: ______________________ Phone:___________CFM25 per 100 ft2 of conditioned floor area = CFM25 x 100 / Conditioned floor area servedIf all ducts are not located within conditioned space, builder must verify that either the postconstruction duct leakage to outdoors(PCO 2, the post construction total duct leakage (PCT 2, or the rough-in test (RIT) with air

2. State which method was used to conduct the duct tightness test: duct blower (DB), modified blower door subtraction method (MBDS), or automated multipoint blower door (AMBD).

System Method (DB, MBDS, AMBD) Test (PCO, PCT, RIT) CFM25 Area served (ft2) Test Result123

*Note: This permanent certificate shall be posted on or in the electrical distribution panel. Certificate shall be completed by the builder or registered design professional. Where there is more than one value for each component, certificate shall list the value covering the largest area.

*Note: This permanent certificate shall be posted on or in the electrical distribution panel. Certificate shall be completed by the builder or registered design professional. Where there is more than one value for each component, certificate shall list the value covering the largest area.

Mechanical Summary:

Water Heater Energy Factor: ______ ___Ef Fuel type: Gas Electric Other Number of Heating and Cooling Systems: ______Heating System Type (choose one):

Gas: __________ AFUE Air-Source Heat Pump: _________ HSPF Other: ________________ Efficiency: __________

Cooling System Type (Standard DX, Heat Pump, Geothermal, etc.):______________Cooling System Efficiency: ________________ SEER EER OtherHeating/Cooling Load Calculations Performed by: ________________Phone: ______Total Heating Load (Based on ACCA Man. J or other approved methodology):____________ Btu/h Total Cooling Load (Based on ACCA Man. J or other approved methodology):____________ Btu/h Cooling Sensible Load:_____________ Btu/h Cooling Latent Load :_________ Btu/hTotal Air Handler CFM (based on design calculations):_________________CFM

Duct Tightness Test Conducted by: ______________________ Phone:__________CFM25 per 100 ft2 of conditioned floor area = CFM25 x 100 / Conditioned floor area servedIf all ducts are not located within conditioned space, builder must verify that either the postconstruction duct leakage to outdoors(PCO 2, the post construction total duct leakage (PCT 2, or the rough-in test

2. State which method was used to conduct the duct tightness test: duct blower (DB), modified blower door subtraction method (MBDS), or automated multipoint blower door (AMBD).

System Method (DB, MBDS, AMBD) Test (PCO, PCT, RIT) CFM25 Area served (ft2) Test Result123

(RIT) with air

developed by

Load CalculationsInstalling high-efficiency mechanical equipment is important for energy savings, yet properly sizing this equipment through accurate load calulations is often just as significant. Some HVAC contractors habitually disregard this critical step, so be your own advocate and scrutinize this section.

Thinking about changing out your old HVAC equipment? Opting for a high-efficiency model (look for models with a high SEER or EER) could save you hundreds of dollars on energy costs.

Test those DuctsTesting ductwork for tightness is valuable not only for new homes, but also existing abodes. Finding a certified professional to test your existing home is as easy as visiting georgiapower.com/homeimprovements.

Duct testing involves the use of a duct blaster (a calibrated fan) and lots of tape. A certified tester will tape all of the supply and return grills in a home, pressurize the ductwork with the fan, and record and analyze the resulting flow of the fan.

Compliance Certificate LocationIf you live in a house built to the 2009 IECC (the current energy code), you should be able to make your way to your air handler (probably in your attic or basement) or electrical distribution panel to locate the compliance certificate.

Once you find it, check the values and visit southface.org/energy-codes for terms you don’t know. This certificate is the starting point for understanding energy efficiency in your home and empowering you as a homeowner.

// Check for mastic, a heavy-duty sealant, applied around the air handler and the joints and seams of ductwork. It’s required by the energy code and makes your ducts super tight.

Duct Tightness You Can See!

4

5

6

Similar to the BET test, the Duct Tightness Test measures the air tightness of the ductwork that circulates conditioned air throughout your house. Leaky ducts can actually be one of the biggest energy drains in a house.

The Mechanical Summary outlines the types and efficiencies of your heating and cooling equipment. It also provides details on your home’s load calculations and who performed them.