DISTRIBUTION Stage 2, April 28, 2009
September 2008Research Report: UCPRC-RR-2008-04
CCCooommmpppaaarrriiisssooonnn ooofff PPPrrreee---CCCaaasssttt aaannnddd
CCCaaasssttt---iiinnn---PPPlllaaaccceee CCCooonnncccrrreeettteee PPPaaavvveeemmmeeennntttsss UUUnnndddeeerrr HHHeeeaaavvvyyy VVVeeehhhiiicccllleee
SSSiiimmmuuulllaaatttooorrr LLLoooaaadddsss
Author:
Erwin Kohler
Work Conducted as part of Partnered Pavement Research Center Strategic Plan Element No. 4.17: HVS testing of pre-cast PCC panels in District 8
PREPARED FOR: California Department of Transportation (Caltrans) Division of Research and Innovation
PREPARED BY:
University of California Pavement Research Center
UC Davis and Berkeley
DISTRIBUTION Stage 2, April 28, 2009
UCPRC-RR-2008-04 ii
DOCUMENT RETRIEVAL PAGE Research Report No.:
UCPRC-RR-2008-04Title: Comparison of Pre-cast and Cast-in-place Concrete Pavements Under Heavy Vehicle
Simulator Loads
Authors: Erwin Kohler
Prepared for: Caltrans Division of Research and Innovation and Caltrans District 8
FHWA No.:
Work Submitted: April 28, 2009
Date:February 2008
Strategic Plan Element No.:4.17
Status: Draft
Version No:Stage 2
Abstract: The California Department of Transportation (Caltrans) evaluated use of the Super-Slab® System of pre-cast concrete pavement as a strategy for the long-life rehabilitation of concrete pavements by conducting accelerated pavement testing using the Heavy Vehicle Simulator (HVS) on a specially constructed experimental pavement in San Bernardino County. HVS testing of the pre-cast pavement occurred in 2005-2006. Caltrans had conducted similar HVS tests on Jointed Plain Concrete Pavements (JPCP) on between 1998 and 2001 at SR-14 in Palmdale. This report compares the results of the accelerated tests on these two pavement types. A difference in the location of the loading made it necessary to apply conversion factors to the Palmdale JPCP data for the comparison. Tests on that pavement used edge loading, while testing on the San Bernardino pre-cast slabs used wheelpath loading. The comparison results suggest that similar service life ranges can be obtained from this pre-cast system and jointed plain concrete pavements. A rough estimate of about 200 million ESALs seem to represent this service life. There is insufficient data to judge the variability in the expected life of pre-cast pavements; however, significant variability was observed in the cast-in-place JPCP slabs tested.
Keywords:pre-cast concrete slabs, Super-Slab, Heavy Vehicle Simulator, HVS, experimental pavement section, dry and wet pavement tests, accelerated pavement testing, instrumented slabs
Proposals for implementation: None
Related documents: • Kohler et al. (2008). “HVS Testing of Pre-Cast PCC Panels First-Level Report—Test 597FD”.
(UCPRC-RR-2008-02). • Kohler et al. (2008). HVS Testing of Pre-Cast PCC Panels First-Level Report—Test 5987FD.
(UCPRC-RR-2008-03). • Du Plessis et al. (2002). “HVS Test Results on Fast-Setting Hydraulic Cement Concrete, Palmdale,
California Test Sections, South Tangent”. ( UCPRC-RR-2002-03) • Du Plessis et al (2005). “HVS Testing of the Palmdale Test Site, North Tangent Sections:
Evaluation of Long Life Pavement Rehabilitation Strategies-Rigid”. (UCPRC-RR-2005-02)
Signatures: Erwin Kohler First Author
John Harvey Technical Review
David Spinner Editor
John Harvey Principal Investigator
T. Joseph Holland Caltrans Contract Manager
DISTRIBUTION Stage 2, April 28, 2009
UCPRC-RR-2008-04 iii
DISCLAIMER
The contents of this report reflect the views of the authors who are responsible for the facts and
accuracy of the data presented herein. The contents do not necessarily reflect the official views
or policies of the State of California or the Federal Highway Administration. This report does not
constitute a standard, specification, or regulation.
PROJECT OBJECTIVES
This project is responsive to the objectives identified by Caltrans District 8 in its request to the
Caltrans Pavement Standards Team (PST) for evaluation of the Super-Slab® System:
• The short-term objectives are to answer a constructability question regarding opening to
traffic in the ungrouted condition and to determine what the failure mechanisms of the
Super-Slab panels are. .
• The long-term objective is to provide information to Caltrans to help determine how the
performance of precast panels compares to that of current Long-Life Pavement
Rehabilitation Strategies (LLPRS) designs for jointed plain concrete pavements.
The project involves the evaluation of transverse joint behavior; measurement of load transfer
efficiency; observations of possible joint deterioration; measurement of faulting, cracking, and
settlement that may result from slab and cement-treated base (CTB) deterioration; estimation of
expected service life of Super-Slab pavement based on HVS test results; and comparison of
Super-Slab performance (expected service life) to Heavy Vehicle Simulator (HVS) tests
conducted on cast-in-place jointed plain concrete slabs (SR-14 at Palmdale).
DISTRIBUTION Stage 2, April 28, 2009
UCPRC-RR-2008-04 iv
DISTRIBUTION Stage 2, April 28, 2009
UCPRC-RR-2008-04 v
EXECUTIVE SUMMARY
In an effort to evaluate whether the pre-cast concrete pavement system known as the Super-
Slab® System can be used as a long-life pavement rehabilitation strategy, the California
Department of Transportation (Caltrans) had the University of California Pavement Research
Center (UCPRC) perform accelerated pavement tests (APT) using a Heavy Vehicle Simulator
(HVS). This testing, which took place on a specially constructed experimental pavement in San
Bernardino County, was similar to that on an earlier project that used cast-in-place jointed plain
concrete pavements (JPCP) on State Road 14 (SR-14) in Palmdale. When the tests on the
Super-Slab sections were completed, the results were compared with those of the Palmdale
tests. This report presents the results of the comparison.
In the San Bernardino pre-cast pavement two identical sections were evaluated. The sections
were on two sides of a five-by–two slab arrangement of 225-mm thick slabs constructed on a
specially built 150-mm thick cement-treated base. For the cast-in-place, Palmdale JPCP slabs,
a series of 14 HVS tests were conducted, all with one concrete mix, but with four different
pavement structures. (Two additional cast-in-place sections are mentioned, but these were
excluded from the analysis because the slab thicknesses were not comparable to the pre-cast
slabs.) The four JPCP sections that were compared with the pre-cast ones consisted of sections
with the following design characteristics:
No dowel bars and no asphalt shoulder, paved on an aggregate base
No dowels but an asphalt shoulder, paved on top of a cement treated base.
Dowel bars and also a tied concrete shoulder, paved on a cement treated base
Dowel bars and in a widened lane configuration, on a cement treated base
One notable difference between the tests on the pre-cast slabs and those on the cast-in-place
slabs was the placement of the HVS load: on the pre-cast slabs, the load was applied in the
wheelpath, almost 2 ft (0.6 m) from the slab edge, and HVS loads on the cast-in-place slabs
were applied at the slab edge (except for the widened lane, where the load was placed 2 ft [0.6
m] from the edge). Since the stresses that result from edge loading are much higher than those
resulting from interior loading, the cast-in-place JPCP slabs failed under fewer load repetitions
than the pre-cast slabs. A process was followed, based on earlier research, to compare edge
loads to interior loads so that a meaningful comparison could be drawn.
DISTRIBUTION Stage 2, April 28, 2009
UCPRC-RR-2008-04 vi
Another notable difference was that the JPCP slabs at Palmdale that are compared with the
pre-cast in this project were allowed to cure for at least a year prior to HVS loading. Although
the concrete mix used for the JPCP slabs consisted of a blend of fast-setting hydraulic cement
and portland cement, measured values for strength from cores taken from the slabs showed
that they had similar strength to JPCP slabs built by Caltrans at the time the Palmdale sections
were subjected to HVS loading. Therefore the comparison presented in this report does not
include comparison between pre-cast slabs and slabs placed in nighttime closures and opened
to traffic the next morning.
The results of the comparison between the two pavement types suggest that similar ranges of
service life can be obtained from this pre-cast system and from jointed concrete pavements.
Large variability was found in the expected life from cast-in-place JPCP pavements, both
between pavements with different designs (i.e., base type, dowel/no dowels, tied concrete
shoulder, widened lane) and within a given design. Given that only two sections of pre-cast
pavements were tested, insufficient data are available to judge their variability. Assuming a fixed
heavy traffic level of 6.6 million equivalent single axle loads (ESALs) per year, a service life for
each was calculated. One pre-cast pavement section failed after the equivalent of 37 years,
while the other was perfectly functional after 22 years of equivalent traffic levels and was not
loaded to failure. The lives of cast-in-place JPCP pavements ranged between zero (slabs with
lengths greater of 18 ft [5.5 m] cracked before any traffic loading in the hot, dry environment)
and 80 years; and if only the designs on cement-treated bases and doweled joints are
considered, this type of pavement would be expected to last on average the equivalent of
approximately 23 years.
DISTRIBUTION Stage 2, April 28, 2009
UCPRC-RR-2008-04 vii
TABLE OF CONTENTS
Project Objectives...................................................................................................................... iii Executive Summary.................................................................................................................... v List of Figures .......................................................................................................................... viii List of Tables............................................................................................................................ viii Abbreviations Used in the Text ................................................................................................ ix Abbreviations Used in the Text ................................................................................................ ix 1 Introduction ........................................................................................................................... 1 2 Background ........................................................................................................................... 3
2.1. Types of Concrete Pavements.......................................................................................... 3 2.2. Pre-cast Versus Rapid-Setting Concrete .......................................................................... 4 2.3. Process Used to Compare Performance of Cast-in-Place and Pre-cast Concrete Under
HVS Loading....................................................................................................................... 5 3 HVS Experiments on Pre-cast and Cast-In-Place Concrete Experiments ....................... 7
3.1. Pre-cast Concrete Pavement in San Bernardino .............................................................. 7 3.2. Cast-in-Place JPCP Concrete Pavement in Palmdale .................................................... 11
4 Comparison of Structures and Traffic Loading to Failure ............................................. 15 5 Summary and Comparison ................................................................................................ 21 References................................................................................................................................. 23
DISTRIBUTION Stage 2, April 28, 2009
UCPRC-RR-2008-04 viii
LIST OF FIGURES
Figure 1: Pre-cast pavement testing. (a) Placement of a slab, and (b) HVS applying traffic
loads. .................................................................................................................................... 7 Figure 2: Dowel grouting. (a) Dowel bars are free immediately after slab placement,
(b) dowel grouting completed in one of the two joints, and (c) dowel slot filled with grout...... 8 Figure 3: Pavement condition at the end of the HVS test for Section 2 (not failed) and
Section 1 (failed), plus map of cracking including location of MDD, excavation,
and cores. ............................................................................................................................. 10 Figure 4: Typical cracks observed in slabs from Palmdale (14)................................................. 12 Figure 5 Test sections characteristics for the cast-in-place study, thickness, materials,
presence of dowel bars, and edge support conditions.......................................................... 16 Figure 6: Comparison of equivalent single axle loads for the PCPS and the
different JPCP pavements of the study................................................................................. 19
LIST OF TABLES
Table 1: Sequence of Test and Loading Conditions in Section 1 ................................................ 9 Table 2: Sequence of Test and Loading Conditions in Section 2 ................................................. 9 Table 3. Comparison of Structure, ESALs, and Expected Life for Precast and Cast-In-Place
Pavements Loaded with HVS in California ........................................................................... 16 Table 4. Edge Load Factor, ELF (after Ref.[18])......................................................................... 17
DISTRIBUTION Stage 2, April 28, 2009
UCPRC-RR-2008-04 ix
ABBREVIATIONS USED IN THE TEXT
AASHTO American Association of State Highway and Transportation Officials Caltrans California Department of Transportation CTB cement-treated base DRI Division of Research and Innovation ESAL equivalent single-axle load GPR ground-penetrating radar HVS Heavy Vehicle Simulator JDMD joint deflection measurement device LTE load-transfer efficiency LLPRS Long-Life Pavement Rehabilitation Strategies LVDT linear variable differential transformer METS Materials Engineering and Testing Services MDD multidepth deflectometer PPRC Partnered Pavement Research Center PCC portland cement concrete
DISTRIBUTION Stage 2, April 28, 2009
UCPRC-RR-2008-04 x
SI* (Modern Metric) Conversion Factors APPROXIMATE CONVERSIONS TO SI UNITS Symbol Convert From Multiply By Convert To Symbol LENGTH In. Inches 25.4 millimeters mm Ft Feet 0.305 meters M AREA In.2 square inches 645.2 square millimeters mm2 ft2 square feet 0.093 square meters M2 VOLUME ft3 cubic feet 0.028 cubic meters M3 MASS Lb Pounds 0.454 kilograms kg TEMPERATURE (exact degrees) °F Fahrenheit 5 (F-32)/9 Celsius C or (F-32)/1.8 FORCE and PRESSURE or STRESS Lbf Poundforce 4.45 newtons N Lbf/in.2 poundforce/square inch 6.89 kilopascals kPa APPROXIMATE CONVERSIONS FROM SI UNITS Symbol Convert From Multiply By Convert To Symbol LENGTH Mm Millimeters 0.039 inches In. M Meters 3.28 feet Ft AREA mm2 square millimeters 0.0016 square inches In.2 M2 square meters 10.764 square feet Ft2 VOLUME M3 cubic meters 35.314 cubic feet Ft3 MASS Kg Kilograms 2.202 pounds Lb TEMPERATURE (exact degrees) C Celsius 1.8C+32 Fahrenheit F FORCE and PRESSURE or STRESS N Newtons 0.225 poundforce lbf
kPa Kilopascals 0.145 poundforce/square inch lbf/in.2
*SI is the symbol for the International System of Units. Appropriate rounding should be made to comply with Section 4 of ASTM E380. (Revised March 2003.)
DISTRIBUTION Stage 2, April 28, 2009
UCPRC-RR-2008-04 1
1 INTRODUCTION Use of precast slabs is being considered as a rehabilitation strategy for extending the
service life of distressed concrete pavement. Benefits of the strategy include the long life
expectancy of concrete slabs cast in factory-controlled conditions and the fact that fully
cured pre-cast slabs can be put into use almost immediately after installation, which makes
them attractive for use on heavily traveled highways where work windows for full-depth
repairs are short.
A Heavy Vehicle Simulator (HVS) research project to evaluate the expected performance of
the Super-Slab® system of pre-cast concrete pavement was conducted for the California
Department of Transportation (Caltrans) by the University of California Pavement Research
Center (UCRPC). This work was performed as Partnered Pavement Research Center
Strategic Plan Element 4.17 (PPRC SPE 4.17), titled “HVS testing precast PCC panels in
District 8,” and was approved by the Caltrans Pavement Standards Team in February 2005.
The short-term objective of the project was to determine failure mechanisms of the Super-
Slab panels and to answer a constructability question regarding opening to traffic in the
ungrouted condition. This constructability question has to do with the effect on the pavement
when the pre-cast slabs are opened to traffic shortly after they are placed and before grout is
injected into the transverse joints and under the slab to activate their dowels. The project’s
long-term objective was to provide information to Caltrans to help determine how the
performance of pre-cast panels compares to that of current Long-Life Pavement
Rehabilitation Strategies (LLPRS) designs for jointed plain concrete pavements (JPCPs)
constructed as part of lane replacement using extended traffic closures. The results in this
report do not consider comparison of pre-cast panels with JPCP constructed in nighttime
closures and opened to traffic the next morning with only several hours for strength gain
prior to loading.
This report is one of a series of documents generated by this study that cover specific
aspects of this project. Among the other items published are a test plan (1), a report on
construction of the test sections (2), a technical memorandum containing an interim
assessment of structural life (3), and reports detailing the HVS tests and their results on
each of the two sections (4, 5). This report provides comparative information regarding the
structural capacity of the pre-cast concrete pavement evaluated in this project and the
structural capacity of cast-in-place jointed plain concrete pavements (JPCP) previously
evaluated by the UCPRC with an HVS.
DISTRIBUTION Stage 2, April 28, 2009
UCPRC-RR-2008-04 2
DISTRIBUTION Stage 2, April 28, 2009
UCPRC-RR-2008-04 3
2 BACKGROUND
2.1. Types of Concrete Pavements The service life that can be obtained from alternative pavement systems is one of the most
important factors that agencies take into account when deciding the pavement type for a
specific project and it is a critical factor in performing a Life Cycle Cost Analysis to select the
most cost-efficient design alternative for a project. Concrete pavements are in general
considered to have longer lives than asphalt pavements, but even the performance of
concrete pavements will vary depending upon design and type.
Pavements across the nation contain an historical mix of different concrete pavement types.
Jointed reinforced concrete pavements (JRCPs) are seldom used today, although they were
used extensively in the 1960s. There are two problems with JRCP: One is the wide
transverse joint openings caused by volumetric changes that are the result of long slabs, and
the other is the appearance of transverse cracks caused by friction forces opposing the
volumetric changes. Continuously reinforced concrete pavements (CRCPs) are generally
considered the most durable type of pavement (6, 7, 8), and there are cases of CRCP
serving heavy highway traffic for more than 60 years (9). Use of CRCP is increasing in the
United States and in many European countries (10). However, by far the most common type
of concrete pavement is jointed plain concrete pavement (JPCP). A great deal of field
performance data exist for JPCP, and it shows a wide range of service lives. In cases where
JPCPs have not performed as well as expected, problems have generally been attributed to
design (specifically, to longer slab lengths and the absence of dowels in transverse joints)
and construction issues (particularly built-in thermal curling which precludes good uniform
support under the slabs).
Pre-cast concrete pavement systems (PCPSs), a newer type of concrete pavement, has
gained popularity for use in roadways in the U.S. during the last six to seven years.
However, because its development and use are relatively recent, little performance data is
available at this time. Although a market exists for PCPS pavements because of the short
construction windows available during the rehabilitation of congested roadways, it is
important for agencies charged with selecting the most cost-effective pavement solution to
be able to compare the expected lives of PCPS against more traditional cast-in-place
concrete pavements, particularly JPCP.
DISTRIBUTION Stage 2, April 28, 2009
UCPRC-RR-2008-04 4
2.2. Pre-cast Versus Rapid-Setting Concrete To be effective, a conventionally produced replacement slab (of poured concrete) must gain
flexural strength sufficient for opening to traffic within a short construction window. A study
by Kumara et al. (11), which investigated the early strength requirements of concrete slab
replacements by loading them with an HVS 6 hours after placement, confirmed that
replacement slabs must possess greater flexural strength than the anticipated maximum
induced stress at the time they are opened to traffic if they are to avoid premature failure.”
Although there are concrete slab-replacement products already in use that gain strength
rapidly, it remains to be seen whether projects rehabilitated with rapid-setting concrete can
last as long as projects rehabilitated with regular concrete. The issue here is consumption of
fatigue life at early age, when some of the slabs have yet to gain enough strength to resist
traffic. Evidence exists that shows that regular concrete made with Type I/II cement and
rapid-setting concretes are comparable as long as the flexural strength is the same, if the
beams are subjected to the same stress levels (12). Having same stress levels for pavement
slabs means that they are subjected to similar traffic and to similar thermal curling and drying
shrinkage conditions.
Given the uncertainties regarding early strength gain and the associated risk of early
cracking with opening to traffic that are entailed in using cast-in-place concrete without
providing sufficient time for greater strength gain—through use of weekend or extended
traffic closures—the concept of pre-cast pavements is an intelligent solution. However,
impediments remain to the widespread use of pre-cast pavements. One of these
impediments is contractors’ current preference for paving with rapid-setting concrete (which
gains strength more quickly than conventional concrete precisely to allow earlier opening to
traffic). Many contractors prefer this method because their crews are familiar with the
required equipment and possess the skills to use it; using the installation technology for pre-
cast slabs would mean retraining and added risks for construction crews (or competition
from a general contractor who normally would not bid for a paving job). A second
impediment is posed by the logistics and increased attention to project coordination needed
for use of pre-cast panels. Because panels of different sizes are used in a project, delivery of
the right panel at the right time is essential, and without proper timing of delivery construction
operations can come to a halt. Making this timing work places additional demands on the
manufacturers when the panels are made, stacked, and loaded onto trucks, and on the
contractor to saw cut and remove damaged pavement within a short work window.
However, assuming that the pavement life yielded by each system is comparable, the
decision to use pre-cast panels or rapid setting concrete is best taken in a case-by-case
DISTRIBUTION Stage 2, April 28, 2009
UCPRC-RR-2008-04 5
basis. The remainder of this report focuses in finding out whether the assumption of
comparable life is valid.
2.3. Process Used to Compare Performance of Cast-in-Place and Pre-cast Concrete Under HVS Loading Data from two sets of HVS tests were used to compare the estimated performance of pre-
cast and cast-in-place concrete pavements:
• Data from HVS testing of cast-in-place JPCP on the shoulder of State Route 14 (SR-
14) performed as part of PPRC SPE 4.2, titled “Evaluation of Rigid Pavement Long-
Life Pavement Rehabilitation Strategies (LLPRS-Rigid),” from 1998 through 2001;
and,
• Data from HVS testing of precast slabs as part of this project.
The load repetitions for each set of sections were equated with each other using a Load
Equivalence Factor (LEF) to convert repetitions of different loads into repetitions of
Equivalent Single Axle Loads (ESALs). The paths of the wheel loads for the two sets of data
relative to the edge of the slab, which were different, were then translated into equivalent
repetitions based on previous analyses performed by others. With the assumptions inherent
in these conversions, the performance in terms of load repetitions to failure of the two types
of concrete pavement could be compared on an approximate basis, as if the loads and load
locations had been the same.
DISTRIBUTION Stage 2, April 28, 2009
UCPRC-RR-2008-04 6
DISTRIBUTION Stage 2, April 28, 2009
UCPRC-RR-2008-04 7
3 HVS EXPERIMENTS ON PRE-CAST AND CAST-IN-PLACE CONCRETE EXPERIMENTS
3.1. Pre-cast Concrete Pavement in San Bernardino
A pre-cast test pavement was constructed near San Bernardino, an hour east of Los
Angeles. It consisted of ten slabs in a two–by-five arrangement. The details of the test slab
installation were developed to mirror the pavement details of a potential specific project in
nearby highway I-15. The main components of the installation included (2):
• Construction of a 150-mm (6 in.) cement-treated base;
• Placement of an 8-mm layer of fine bedding material (stone sand);
• Placement of precast Super-Slab® sections, 225 mm thick (8-7/8 in.) on precisely
graded sub-base;
• Application of grout through the slab surface at joints where slots for dowels and tie
bars were present, followed by application of a second type of grout that reached
under the slab (bedding grout);
• Diamond grinding of the surface of the slab to meet smoothness requirements of the
project.
Two test sections were evaluated between June 2005 and August 2006, one on each side of
the two-by-five panel arrangement (Figure 1). The main test objectives were (1) to evaluate
whether traffic could be safely allowed on the newly placed slabs before grouting (2) to
identify how much traffic loading the system could carry (which relates to years of expected
service), and (3)to determine failure mechanisms for this type of PCPS.
Figure 1: Pre-cast pavement testing. (a) Placement of a slab, and (b) HVS applying traffic
loads.
a) b)
DISTRIBUTION Stage 2, April 28, 2009
UCPRC-RR-2008-04 8
Traffic loading was applied to both sections to simulate the exposure to traffic from the time
of placement of the slabs to the time of grouting, which would normally occur during the next
nighttime closure. The grouting process completes installation of the pre-cast system. There
are two types of grouting, one for dowel bars and tie bars, and the other for filling of voids
under the slabs. The dowel grout activates the dowels bars, which would otherwise float in
the open slots (Figure 2).
Figure 2: Dowel grouting. (a) Dowel bars are free immediately after slab placement, (b) dowel
grouting completed in one of the two joints, and (c) dowel slot filled with grout.
After preliminary loading of the ungrouted pavement, the sections were grouted, and the
grouted sections were then loaded for extended periods under different conditions in the
sequence shown in Table 1 (note that testing on Section 1 resumed after completion of
testing on Section 2). All the loading on these sections was performed in the wheelpath,
0.6 m (2 ft) from the slab edge. Section 1 was heavily overloaded to cause failure and allow
identification of failure modes and Section 2 was utilized to determine performance under
lower, more realistic load levels that were still heavy enough to potentially fail the pavement
within a reasonable amount of time, such as a couple of months.. Wet pavement conditions
were simulated by applying water directly onto the slabs at the joints.
a) b) c)
DISTRIBUTION Stage 2, April 28, 2009
UCPRC-RR-2008-04 9
Table 1: Sequence of Test and Loading Conditions in Section 1
Date and Repetitions at the End of the Phase
Repetitions
Moisture Condition
Slab Condition
Traffic Mode
Portion of
Section Tested
Traffic Load (kN) Date
Each Cumulative
60 17-Jun-05 152,404 152,40480 24-Jun-05 147,671 300,075
120 10-Aug-05 210,085 510,160
Uncracked
150 25-Aug-05 251,884 762,044
Dry Two-way
150 20-Sep-05 477,218 1,239,26260 19-May-06 62,716 1,301,978
100 9-Jun-06 97,206 1,399,184One-way
150 12-Jul-06 15,958 1,415,142
Corner crack at cabin-end transverse joint
150 1-Aug-06 31,241 1,446,383
Full
150 9-Aug-06 158,689 1,605,072150 18-Aug-06 77,332 1,682,404
Wet
Second corner crack
Two-way
Half 150 28-Aug-06 2,018 1,684,422
Table 2: Sequence of Test and Loading Conditions in Section 2
Traffic Load (kN)
Date and Repetitions at the End of the Phase
Repetitions Moisture Condition
Slab Condition
Traffic Mode Target Actual Date Each Cumulative
40 60 3-Oct-05 243,801 243,801 Dry 100 100 15-Feb-
2006 2,334,349 2,578,150
40 60 3-Mar-06 2,456,357 5,034,507 60 90 8-Mar-06 2,552,935 7,587,442 80 80 15-Mar-06 2,664,929 10,252,371
Wet Uncracked Two-
way
100 100 2-May-06 3,459,387 13,711,758
Only Section 1 reached the end of its serviceable life, and for that reason the results of
Section 2 are presented first. No sign of any distress was observable at the end of the dry
test. The dry test consisted of two loading conditions, 60 kN and later a 100 kN load level.
Once the responses measured by the sensors indicated a stable condition at a 100 kN load,
water application at the joints was initiated and loading continued. During the wet part of the
test, loading was applied at levels between 60 kN and 100 kN (13.5 and 22.5 Kips). No
distresses were observable at this stage either, despite the fact that considerable pumping of
material from under the slab occurred during the wet trafficking. The pumping of fine sand,
however, did not result in any significant rise in corner deflections. An investigation was
carried out to evaluate the extent of the suspected voids under the slab caused by pumping
and it revealed that the pumped material was comprised of the finer particles from the sand
bedding layer and disintegrated bedding grout. There was no clearly observable void in the
wheelpath under the joint, but there were widespread channels of washed fines.
DISTRIBUTION Stage 2, April 28, 2009
UCPRC-RR-2008-04 10
Loading in Section 1 was applied with an aircraft tire able to apply load levels above 100 kN.
Corner cracks appeared on both sides of one of the two loaded joints. HVS trafficking under
dry conditions was stopped when the pavement responses were once again stable despite
the cracks. After the wet traffic was initiated, the slabs were able to withstand nearly a half
million more heavy load repetitions before traffic was stopped, which was a clear indication
of a still sound structural condition of the cracked slabs. The cracks neither widened nor
developed faulting or spalling.
Failure of Section 1 was reached in the form of a localized collapse at one of the joints and a
more extended corner crack on the other joint. Forensic investigation revealed that the
localized failure happened between dowel bars, exactly under the wheelpath. The combined
observations point toward concrete fatigue under channelized traffic and the loss of support
caused by pumping. The other joint in Section 1 presented a failure that can be considered
typical of cast-in-place, with large concrete cracks. Both failed joints in Section 1 are shown
in Figure 3. Drill cores obtained from various locations in both test sections indicated very
good performance of the dowel grout. There was no sign of looseness of the dowel, which
means that the grout was strong enough to sustain the compressive forces of the dowel as
load was transmitted across the joint. Likewise, there were no signs of debonding issues
between the grout and the surrounding concrete of the slot.
Slab 2
Slab 3
Slab 4
HVS wheel-pathMDDsSlab excavationCores
HVS wheel-pathMDDsSlab excavationCores
Figure 3: Pavement condition at the end of the HVS test for Section 2 (not failed) and Section
1 (failed), plus map of cracking including location of MDD, excavation, and cores.
Section 1 Section 2
DISTRIBUTION Stage 2, April 28, 2009
UCPRC-RR-2008-04 11
3.2. Cast-in-Place JPCP Concrete Pavement in Palmdale
Approximately five years before this pre-cast experiment, an investigation was undertaken to
evaluate the use of rapid-strength concrete for accelerating construction of new concrete
pavements and for rapid rehabilitation of existing facilities (i.e., slab replacements). A series
of HVS tests were conducted to evaluate the fatigue behavior of fast-setting hydraulic
cement concrete pavements (13) and various design features, namely base type (granular
and CTB), tied concrete shoulder, dowels, and widened truck lane. Six full-scale pavement
test sections were constructed on State Route 14 (SR-14) near Palmdale, California, about
an hour north of Los Angeles. Each section was 70 m long and consisted of approximately
15 slabs. The concrete used for the slabs was an 80/20 blend of Ultimax® and Type
I/II portland cement. The concrete mix met specifications for Fast-Setting Hydraulic Cement
Concrete (FSHCC) at the time of construction.
Joints were sawed at 90 degrees, and the joint spacing followed an alternating pattern of
3.7, 4.0, 5.5, 5.8 m (12, 13, 18, 19 ft). An important difference existed between the fast-
setting concrete used in Palmdale and the concrete that is most regularly used in overnight
slab replacements: The Palmdale sections used in this comparison were not trafficked until
more than a year after construction, so their flexural strength at time of opening to traffic was
not an issue (13). The point here is that in contrast to the typical case of overnight
construction with traffic opening the same morning, the concrete at Palmdale had a chance
to gain most of its final strength before it took any traffic loading. The early consumption of
fatigue life in concrete that is opened to truck traffic within 2 to 3 hours of placement is likely
one of the major causes of short life for slab replacements in the field. . Extensive laboratory
testing (12) showed similar fatigue life for same stress ratio (ratio of tensile stress to flexural
strength) for both types of material compared in this report, the blend used at Palmdale and
the conventional Type I/II cement used at San Bernardino. For this reason, it is assumed
that cement type is not a variable in the performance comparison.
The pavements in Palmdale Sections 1, 3, and 5 consisted of plain jointed concrete slabs of
various thicknesses, and were tested between July 1998 and May 1999. These three
sections were placed on a compacted granular base. Sections 7, 9, and 11 were designed
and constructed on 100 mm of cement-treated base on top of 150 mm of an aggregate base.
The differences among these sections are as follows: Section 7 had no dowels and an
asphalt concrete shoulder; Section 9 was constructed with dowels, normal lane width, and a
concrete shoulder with tie bars (the tied shoulder was the adjacent lane); and Section 11
was constructed using a widened truck lane (4.26 m instead of 3.66 m wide) and doweled
DISTRIBUTION Stage 2, April 28, 2009
UCPRC-RR-2008-04 12
joints. The testing on Sections 7, 9, and 11 took place between June 1999 and December
2001.
The main mode of failure observed on all JPCP sections consisted of the development of a
longitudinal crack parallel to the direction of traffic but outside the trafficking area. The
majority of the cracks started as transverse cracks, but turned into longitudinal or, in some
cases, corner cracks. Figure 4 shows typical examples of the cracking observed in the 23
tested locations within the six sections.
Figure 4: Typical cracks observed in slabs from Palmdale (14).
The reason for the longitudinal cracking was found to be associated with built-in curling of
the slabs, and to a lesser extent, to the half axle loading. In addition to the use of fast-setting
high early-strength concrete, these pavements were built in desert conditions and under
daytime construction. These conditions resulted in top-down shrinkage and thermal cracks
(15) and high estimated built-in temperature differential values (16). Regardless of the
inclusion of dowels and tie bars on Sections 7, 9, and 11, the study showed that slab curling
played a major role on the deflections observed under HVS loading, and therefore on the
stresses that led to cracking of the concrete. The loss in support from the substructure,
especially in the proximity of the longitudinal free edge, resulted in the development of high
tensile stresses at the top of the concrete, which in turn caused the slabs to crack in the
observed fashion.
DISTRIBUTION Stage 2, April 28, 2009
UCPRC-RR-2008-04 13
All the test sections at Palmdale with 5.5 and 5.8 m (18 and 19 ft) slab lengths cracked
before HVS loading was performed, and no other heavy loads were applied. These cracks
were due to temperature curling and shrinkage only. All HVS tests were therefore performed
on the 3.7 and 4.0 m (12 and 13 ft) long slabs.
In general, deflection sensors placed just below the concrete in the base layer close to the
edge registered very small deflections, even with the application of test loads greater than
90 kN (20.3 Kips). Deflections recorded in the base layer were typically less than 0.2 mm,
while the surface-mounted sensors recorded deflections between 1.0 and 1.2 mm for the
same test. This means that the slab was not in complete contact with the base, as less than
20 percent of the surface deflections were passed on to the base layer (17).
Temperature also played a significant role in the structural behavior of the concrete slab.
Daily variations in slab temperatures caused the slabs to go through cycles of expansion and
contraction, which had a noticeable effect on the measured load transfer efficiency (LTE)
(17). During the hot part of the day the slabs expanded, the joints locked up, and LTE values
close to 100 percent were commonly calculated. At night, when slab contraction took place,
LTE values dropped below 80 percent. Also, the concrete slabs went through curling cycles
owing to temperature differentials (temperature at the surface of the slab with respect to the
temperature at the bottom of the slab),. High deflection measurements were associated with
lower surface temperatures.
The advantages of dowels, tie bars, and a widened lane were clearly illustrated in the study.
Even after the application of aggressive 150-kN loading (33.8 Kips), no obvious LTE
deterioration could be detected on the sections constructed with dowels, tie bars, and
widened lanes. Although significant cracks developed during the testing period, no
significant drop in LTE values could be detected after the formation of the cracks, an
indication of the effectiveness of the dowels to transfer load across joints even after
extensive joint deterioration. The dowels had a significant influence in controlling slab edge
movements. In contrast to this, the sections without dowels or tie bars experienced
significant reductions in LTE due to trafficking and after the appearance of corner cracks.
The damaging effect of repetitive loading caused a significant reduction in the life of the
pavement in comparison with the doweled jointed sections.
DISTRIBUTION Stage 2, April 28, 2009
UCPRC-RR-2008-04 14
DISTRIBUTION Stage 2, April 28, 2009
UCPRC-RR-2008-04 15
4 COMPARISON OF STRUCTURES AND TRAFFIC LOADING TO FAILURE
Only one pre-cast pavement type was tested in San Bernardino, while various structures of
jointed plain concrete pavement (JPCP) were studied in Palmdale. The test sections’ main
structural characteristics, including slab thicknesses and edge support condition, are
presented in Table 3. Note the slab thickness in JPCP Sections 1 and 3. They were
constructed with reduced slab thickness of 100 mm and 150 mm, are not comparable to the
pre-cast sections that were 225 mm thick, and therefore are not included in comparison with
the pre-cast concrete pavement system (PCPS). The slab thickness of the other JPCPs was
similar to the PCPS slab thickness (see Rows A and B. in Table 3), and even though the
underlying materials do not exactly match (see Row C in Table 3), it was considered close
enough to compare the performance of the two types of pavements. PCPS and JPCP
sections of comparable structure are shown in Figure 5. The particular features of the JPCP
pavements are listed in Row D, such as the use of dowels in the transverse joints and edge
support conditions. The HVS used in these experiments was able to test up to 8 m (26.5 ft)
of pavement, and therefore in most cases three slabs/two joints were evaluated per HVS
test. As indicated previously, two HVS tests were conducted in the pre-cast pavement, one
on each side of the two-by-five arrangement. On the JPCP there was room for up to five
replicate tests in each section, as shown in Row E in Table 3.
One important aspect of the comparison is the subgrade. Dynamic cone penetrometer
(DCP) testing at the San Bernardino site indicated CBR values under the pre-cast sections
between 45 and 80 percent, while CBR at Palmdale had been found to be close to 100
percent. This information is confirmed by the fact that backcalculated subgrade modulus at
San Bernardino ranged mostly between 50 and 100 MPa, while at Palmdale the modulus
was approximately 200 MPa.
DISTRIBUTION Stage 2, April 28, 2009
UCPRC-RR-2008-04 16
Table 3. Comparison of Structure, ESALs, and Expected Life for Precast and Cast-In-Place Pavements Loaded with HVS in California
Summary
PCPS Section
1
PCPS Section
2
JPCP Section
1
JPCP Section
3
JPCP Section
5
JPCP Section
7
JPCP Section
9
JPCP Section
11
A. Design slab thickness , mm
225 225 100 150 200 200 200 200
B. Mean measured thickness, mm
225 225 107 163 211 226 221 222
C. Underlying structure, mm
150 CTB 150 CTB 150 AggB 150 AggB 150 AggB 100 CTB 150 AggB
100 CTB 150 AggB
100 CTB 150 AggB
D. Design features Load transfer Shoulder Slab size Length, m Width, m
Dowels, Asphalt
4.57 3.96
Dowels, Asphalt
4.57 3.96
No dowels
None
3.69-5.803.66
No dowels
None
3.58-5.773.66
No dowels
None
3.70-4.033.66
No dowels
Asphalt
3.64-5.913.66
Dowels,
Tied PCC
3.62-5.86 3.66
Dowels,
Widened L.
3.67-5.91 4.26
E. Number of HVS tests
1 1 3 5 4 4 3 3
F. Edge Load Factor 1 1 0.050 0.050 0.050 0.050 0.161 0.163
G. Average ESALs, millions
242 142 10 8 45 142 241 187
H. ESALs each test, millions
- - 4, 4, 22 0, 4, 5, 11, 18
2, 8, 31, 102
39, 48, 115, 363
35, 162, 526
57, 205, 298
I. Years to failure* 37 22 2 1 7 21 37 28
J. Range of years to failure*
37 >22 1-3 0-3 0.3-15 6-55 5-80 9-45
* Years to failure assumes 6.6 million ESALs per year.
JPCP - 11PCPS
225 PCPS8 Bed Sand150 CTB
(dowels & grout)
AC Shoulder
PCPS
225 PCPS8 Bed Sand150 CTB
(dowels & grout)
AC Shoulder
JPCP - 5
200 JPCP100 CTB150 AggB
(no dowels)
AC Shoulder
JPCP - 5
200 JPCP100 CTB150 AggB
(no dowels)
AC Shoulder
JPCP - 7
200 JPCP100 CTB150 AggB
(no dowels)
AC Shoulder
JPCP - 7
200 JPCP100 CTB150 AggB
(no dowels)
AC Shoulder
JPCP - 9
200 JPCP100 CTB
150 AggB(dowels)
PCC Tied Shoulder
JPCP - 9
200 JPCP100 CTB
150 AggB(dowels)
PCC Tied Shoulder
200 JPCP100 CTB
150 AggB(dowels)
Wide lane
200 JPCP100 CTB
150 AggB(dowels)
Wide lane
Figure 5 Test sections characteristics for the cast-in-place study, thickness, materials,
presence of dowel bars, and edge support conditions.
DISTRIBUTION Stage 2, April 28, 2009
UCPRC-RR-2008-04 17
The total number of Equivalent Single Axle Loads (ESALs) applied to a pavement takes into
consideration the various load levels used during the course of an HVS test. It is a gross
approximation at best, but provides a means to compare different loading sequences. The
HVS passes are normalized to the passage of an 80 kN axle load through the ESALs
calculation. The computation of ESALs in this study was done according to Equation 1,
which used the Caltrans load equivalence exponent of 4.2, where L is the half-axle load level
in kN and ELF is the Edge Load Factor.
12.4
40−×⎟
⎠⎞
⎜⎝⎛= ∑ ELFLESALs (1)
An ELF accounts for the difference in pavement damage caused by a wheel load applied at
the edge of the pavement with respect to the damage caused when the load is in the
wheelpath. The ELFs for the HVS loads applied to the JPCP sections were determined from
an Illinois DOT study (18). The ELFs are reported in Table 3 in Row F.
For HVS tests on PCPS the ELF was taken as 1.0, as the wheel load was at the wheelpath,
i.e., approximately at 460 mm from the edge, as can be seen in Figure 3. For the JPCP
sections, the wheel loads were at the edge of the slab as seen in Figure 4 (except in the
case of the widened truck lane, where the load was 0.6 m from the edge of wide slab, at the
edge of the expected truck traffic wander pattern). The ELFs for edge loads were determined
from Table 4, which is adopted (by interpolation) from work done at the University of Illinois
(18). The edge load factors of 0.050, 0.161, and 0.163 (shown in Table 3), taken as inverse
numbers, imply that the numbers of repetitions for the same damage is respectively 20, 6.20,
and 6.15, depending on the edge support condition of each section.
Table 4. Edge Load Factor, ELF (after Ref.[18])
[email protected]* [email protected] Edge Support Slab thickness, mm k=100** k=200 k=100 k=200 203 0.05 0.05 0.12 0.12 254 0.05 0.05 0.12 0.12 Asphalt Shoulder 305 0.06 0.06 0.14 0.14 203 0.07 0.06 0.18 0.17 254 0.09 0.09 0.19 0.19
3-m Concrete Shoulder (Medium load transfer efficiency) 305 0.17 0.17 0.22 0.22
203 0.12 0.13 0.24 0.18 254 0.21 0.22 0.27 0.23
3-m Concrete Shoulder (High load transfer efficiency) 305 0.34 0.33 0.36 0.32
203 0.11 0.14 0.17 0.19 254 0.17 0.2 0.24 0.25 Widened lane (0.6m) 305 0.25 0.28 0.31 0.34
*Two cases of wheelpath distance from the edge, which depends on lane width and other factors. ** k-value is the modulus of subgrade reaction in pounds per cubic inch.
DISTRIBUTION Stage 2, April 28, 2009
UCPRC-RR-2008-04 18
The total number of ESALs that each section was able to sustain before the end of the HVS
loading is shown in Row G. of Table 3. Given that multiple replicate HVS tests were
conducted in each JPCP section, the details of ESALs in each one of those replicate tests
are shown in Row H. The average of ESALs in all the tests for a given section is the value
reported in Row G. The individual test data exhibit a wide range of scatter, which is
attributed to the variable field conditions. To make the results more easily understood, the
total ESALs were converted to an equivalent number of years in service. This arbitrary
conversion of the results used the current traffic on highway I-15 near the site of the pre-cast
pavement experiment. The assumed total of ESALs per year at that location is 6.6 million.
The results are presented in Rows I and J in Table 3, for average and range respectively,
and reveal that these pavements should be able to remain in service between 1 and 37
years (JPCP sections 1 and 3 are excluded).
These service lives are very conservative because the yearly traffic is high, despite of
assuming constant ESALs for the computations (zero rate of increase over the years for
traffic volume and axle loads). The 6.6 million ESALs per year used for estimation of life is
the result of taking the AADT values for highway 15 in San Bernardino County (Caltrans
District 8) near the junction with highway 10. For this segment the Caltrans reported traffic
volumes in 2006 for trucks with 2, 3, 4, and 5 axels were respectively 6,401; 1,209; 526; and
13,000. The conversions for ESALs per truck were taken as 0.26, 0.42, 0.42, and 1.20. This
resulted in 18,027 ESALs a day, which translates to 6.58 million ESALs a year. Proper
pavement design mandates that AADT has to be split equally into the two traffic directions
and only a fraction of this traffic be assigned to a design lane through the use of a lane
factor. Taking 60% as the lane factor and applying it to the one-direction traffic leads to an
estimated 1.97 million ESALs per year, which in turn means pavement lives that are 3.33
times longer. This portends that the best estimate for service life is not up to 37 years, but up
to 123 years. This is too long of a time span to be reported with confidence, so the very
conservative approach that results from concentrating the two-way traffic count on a single
design lane was adopted. Furthermore, the main reason to convert ESALs to years is to
offer a simpler comparison between pavements, and should be seen more in relative rather
than in absolute terms.
A graphical representation of the ESALs to failure for the PCPS and JPCP sections is shown
in Figure 6. These results are interpreted as a rough indication that the expected life of pre-
cast concrete pavement systems does not differ greatly from that expected from cast-in
place jointed plain concrete pavements. However, these results should be used with caution
due to the many assumptions used to permit comparison of the two sets of data. It should be
DISTRIBUTION Stage 2, April 28, 2009
UCPRC-RR-2008-04 19
noted that HVS loading at PCPS Section 2 was halted at 142 million ESALs without
pavement damage, and it is not known whether failure would have been achieved at a
higher or lower number of ESALs than PCPS Section 1. From data shown in Table 3 and
Figure 6 a rough estimate of about 200 million ESALs seem to represent the life expectancy
for the type of PCPS that was evaluated, and also for the JPCP pavement types that were
evaluated in this study.
0
100
200
300
400
500
600
PCPSsection 1
PCPSsection 2
JPCPsection 5
JPCPsection 7
JPCPsection 9
JPCPsection 11
ES
ALs
(mill
ions
)
Not loaded to
failure
Figure 6: Comparison of equivalent single axle loads for the PCPS and the
different JPCP pavements of the study.
DISTRIBUTION Stage 2, April 28, 2009
UCPRC-RR-2008-04 20
DISTRIBUTION Stage 2, April 28, 2009
UCPRC-RR-2008-04 21
5 SUMMARY AND COMPARISON Use of pre-cast concrete pavement systems (PCPSs), which are relatively new and have not
been widely deployed, is being considered as a strategic alternative to the use of
conventional cast-in-place slab replacements for the rehabilitation of projects that carry large
traffic loads. However, before pre-cast systems gain more widespread implementation, more
information is required about how they compare to JPCP, especially data about their
capacity to carry large amounts of traffic loads, which is a point of major controversy. Since
long-term field performance data for pre-cast systems under real traffic conditions does not
exist, and because this type of information is needed to provide a preliminary evaluation of
their cost-efficiency, this study was undertaken. The study compared the number of ESALs
that pre-cast and cast-in-place jointed pavement resisted under Heavy Vehicle Simulator
(HVS) loads. The study provides the first, full-scale experimental comparison of load
capacity between PCPS and JPCP and is intended to inform the discussion about which
type of pavement lasts longer.
It should be remembered that the JPCP slabs at Palmdale that are compared with the pre-
cast in this project were allowed to cure for at least a year prior to HVS loading. Although the
concrete mix used for the JPCP slabs consisted of a blend of fast-setting hydraulic cement
and portland cement, measured values for strength from cores taken from the slabs showed
that they had similar strength to JPCP slabs built by Caltrans at the time the Palmdale
sections were subjected to HVS loading. Therefore the comparison presented in this report
does not include comparison between pre-cast slabs and slabs placed in nighttime closures
and opened to traffic the next morning.
The results of this study indicated that 200 millions ESALs is a valid rough approximation of
the capacity of PCPS and JPCP of approximately 200- to 225-mm slab thickness.
Unfortunately only two PCPS sections were tested and only one was trafficked until
pavement failure was achieved. The two sections were loaded differently, which meant that
there were no replicate tests, which therefore precluded an assessment of the results’
variability.
One can speculate that slabs manufactured in a pre-cast plant would be more uniform than
field-cast JPCP slabs in terms of thickness and strength, and that this would lead to them to
have less field variability. The JPCP testing results agreed with field observations that there
is considerable variability in JPCP performance, with some test sections failing (cracking)
very early under live traffic, while others lasted considerably longer.
DISTRIBUTION Stage 2, April 28, 2009
UCPRC-RR-2008-04 22
The variable nature of the performance of complex infrastructure systems makes it difficult to
come up with test results that allow for prediction of the exact moment when either a pre-
cast pavement or a cast-in-place concrete pavement will fail, and in the pre-cast experiment
it was unfortunately not possible to obtain replicate tests. The results showed that one
section remained intact (no cracks or faulting or any other distress) after 142 millions ESALs,
while another section failed after 242 million ESALs. Similarly, transverse or corner cracking
was observed in one of the JPCP tests at as early as 160 thousand ESALs, while another
withstood 536 million ESALs before cracking. Assuming a fixed heavy traffic level of 6.6
million ESALs per year, a service life for each type of pavement was calculated. One of the
pre-cast pavement sections failed after what would be 37 years, assuming very conservative
traffic levels, while the other was still perfectly functional after 22 years of equivalent traffic
levels. The lives of cast-in-place JPCP pavements ranged between zero (long slab lengths)
and 80 years, but if only the designs that include cement-treated bases and doweled joints
are considered, this type of pavement would last on average around 23 years for the very
heavy annual ESALs considered for this calculation (6.6 million ESALs per year).
In sum, a preliminary assessment, based on the limited results in this project, is that doweled
JPCP and PCPS pavements of similar thicknesses can be expected to have similar
performance and failure mechanisms.
DISTRIBUTION Stage 2, April 28, 2009
UCPRC-RR-2008-04 23
REFERENCES 1. Partnered Pavement Research Program (2005). HVS Test Plan: Super-Slab
Reconstruction of Rigid Pavement Sections. Test plan prepared for the California Department of Transportation (Caltrans) by University of California Pavement Research Center, Dynatest Consulting Inc., and CSIR South Africa.
2. Kohler, E., du Plessis, L., and Theyse, H. (2007). Construction and Preliminary HVS Tests of Pre-Cast Concrete Pavement Slabs. Research report prepared for the California Department of Transportation (Caltrans) by the University of California Pavement Research Center. (UCPRC-RR-2006-10)
3. Theyse, H., du Plessis, L., and E. Kohler (2007). Interim Assessment of Expected Structural Life of Pre-Cast Concrete Pavement Slabs with HVS Testing. Technical memorandum prepared for the California Department of Transportation (Caltrans) by the University of California Pavement Research Center. (UCPRC-TM-2006-04)
4. Kohler, E., Theyse, H., and du Plessis, L. (2008). HVS Testing of Pre-Cast PCC Panels First-Level Report—Test 597FD. Research report prepared for the California Department of Transportation (Caltrans) by the University of California Pavement Research Center. (UCPRC-RR-2008-02)
5. Kohler, E., Theyse, H., and du Plessis, L. (2008). HVS Testing of Pre-Cast PCC Panels First-Level Report—Test 598FD. Research report prepared for the California Department of Transportation (Caltrans) by the University of California Pavement Research Center. (UCPRC-RR-2008-03)
6. Smith, K. D., Wade, M. J., Peshkin, D. G., Khazanovich, L. Yu, H. T., and Darter, M. I. (1998). Performance of Concrete Pavements. Volume II: Evaluation of In-service Concrete Pavements. (FHWA-RD-95-110)
7. Gharaibeh, N. G., Darter, M. I., and Heckel, L. B. (1999). “Field Performance of Continuously Reinforced Concrete Pavement in Illinois,” Transportation Research Record - Journal of the Transportation Research Board: 1684, pp 44-50.
8. Won, M., Kim, D-H., Cho, Y-H., and Medina-Chavez, C. (2006). “Long-Term Performance of Continuously Reinforced Concrete Pavement in Texas,” Proc International Conf on Long-Life Concrete Pavements: Illinois October 25–27, 2006.
9. Kohler, E.R. “Accelerated Load Tests of Continuously Reinforced Concrete Pavements and Case Studies of CRCP in the US,” Proc. International Conf on Concrete Roads: Midrand, South Africa, August 2007.
10. Jaszienski, A (2008) Presentation at Workshop, “CRCP—Design, Practice and International Experiences,” 9th International Conf on Concrete Pavements: San Francisco, California, August 2008.
11. Kumara, M. W., Tia, M., Bergin, M., and Choubane, B. 2006. “Evaluation of Early Strength Requirement of Concrete for Slab Replacement Using Accelerated Pavement Testing,” J. Transp. Engr.: Volume 132, Issue 10, pp. 781-789
12. Kohler, E., Ali, A., Harvey, J. (2005). “Goal 4 Long Life Pavement Rehabilitation Strategies-Rigid: Flexural Fatigue Life of Hydraulic Cement Concrete Beams.” Draft report prepared for the California Department of Transportation (Caltrans) Division of Research and Innovation Office of Roadway Research by the University of California Pavement Research Center. (UCPRC-RR-2005-04)
13. Roesler, J., C. Scheffy, A. Ali, and D. Bush. (2000). “Construction, Instrumentation, and Testing of Fast-Setting Hydraulic Cement Concrete in Palmdale, California.” Report prepared for California Department of Transportation. Pavement Research Center,
DISTRIBUTION Stage 2, April 28, 2009
UCPRC-RR-2008-04 24
CAL/APT Program, Institute of Transportation Studies, University of California, Berkeley. (UCPRC-RR-2000-05)
14. du Plessis, L., Bush, D., Jooste, F., Hung, D., Scheffy, C., Roesler, J., Popescu, L., and Harvey, J. T. (2002). “HVS Test Results on Fast-Setting Hydraulic Cement Concrete, Palmdale, California Test Sections, South Tangent.” Draft report prepared for the California Department of Transportation (Caltrans) by the University of California Pavement Research Center, Institute of Transportation Studies, University of California, Berkeley. (UCPRC-RR-2002-03)
15. Heath, A. and J. Roesler. (1999). “Shrinkage and Thermal Cracking of Fast Setting Hydraulic Cement Concrete Pavements in Palmdale, California”. Draft report prepared for California Department of Transportation (Caltrans) by the University of California Pavement Research Center, CAL/APT Program, Institute of Transportation Studies, University of California, Berkeley. (UCPRC-RR-1999-07)
16. Rao, S., and Roesler, J. (2005). “Characterization of Effective Built-in Curling and Concrete Pavement Cracking on the Palmdale Test Sections”. Draft report prepared for the California Department of Transportation (Caltrans) by the University of California Pavement Research Center, Berkeley and Davis. (UCPRC-RR-2005-09)
17. du Plessis, L., Jooste, F., Keckwick,S., and Steyn, W. (2005). “HVS Testing of the Palmdale Test Site, North Tangent Sections: Evaluation of Long Life Pavement Rehabilitation Strategies-Rigid”. Draft report prepared for the California Department of Transportation (Caltrans) by CSIR Transportek, Pretoria, Republic of South Africa and the University of California Pavement Research Center, Berkeley and Davis. (UCPRC-RR-2005-02)
18. Zollinger, D. and Barenberg, E. J. (1989). “Proposed Mechanistic Based Design Procedure for Jointed Concrete Pavements.” 18, Illinois Cooperative Research Program, University of Illinois, Urbana. Report TES-057 of Project IHR-5.