Bba a Centr calcularPTAS COLULE MEJORAMIENTO LINEA DE LODOS

Bomba de Lodos Deshidratados

a) Esquema Impulsin

b)Cotas en CentrifugaCota Radier Galpnm99.62Altura machn bombam0.10==> Cota radier bombam99.72Altura eje bombapulg10.001/16==> Altura eje bombam0.26==> Cota eje bombam99.98

c)Cotas en Galpn EncaladoCota Radier m99.66Altura descarga impulsin existente sobre tornillom2.20==> Cota entrega impulsinm101.86

==> Altura Geomtrica elevacinm1.88

d)Caudal lodos deshidratados

Caudal de diseom3/h5.0L/s1.39

e)Verificacin Impulsin

TramoDesdeHastaMaterialDext (mm)e (mm)Dint (mm)V(m/s)L(m)

1BombaDerivacin bba existAcero114.36.02102.260.1718.202Derivacin bba existImpulsin existAcero114.36.02102.260.176.403Impulsin existDescarga tornillo calAcero114.36.02102.260.1711.7036.30

f)Propiedades del lodo (reologa)Concentracin lodo deshidratadoXkg/m3250.0==> Humedad%75.0

==> Peso especifico del lodo kg/m31,400.0==> Coeficiente de Rigidezhkg/(m-s)5.0

g)Clculo Prdidas de Carga

==> Nmero de ReynoldsR--4.842==> Coeficiente de Friccinf--13.218==> Cada de presin debido a la friccinDpN/m238,298m38.3psi55.838==> Altura totalm40.18psi58.585

h)Puntos de TrabajoAltura esttica m1.88

Caudal de Impulsin Requeridom3/h5.00L/s1.39Bombas en OperacinN1Caudal Unitario de BombeoL/s1.39

TotalPrdida de Carga Friccionalm38.30Prdida de Carga Singularm0.00Prdida Totalm38.30Altura de Elevacinm40.18Punto Trabajo5.00m3/h&4.02bar==> curva revolucionesrpm80

Curvas de Bombas y SistemaBomba ProyectadaBOERGER PL 200

Curva SistemaCurva bombaQ HQ Helev.(L/s)m3/h(m)(L/s)(m)h elevacion

0.00.00.040.180.600.20.71.8840.240.180.600.41.41.8840.440.180.600.62.21.8840.640.180.600.82.91.8840.840.180.601.03.61.8841.040.180.601.24.31.8841.240.180.601.45.01.8841.440.180.601.65.81.8841.640.180.601.86.51.8841.840.180.602.07.21.8842.040.180.60

DQ (L/s) =0.2

Determinacin de prdidas de carga Tramo :1FittingsNKsKsDiam, m 0.0001691087Salida00.50.0Vlvulas de CompuertaFitting Losses, Ks =3.2Entrada111.0Prdidas de Carga segn % CierrePipe Length,m =0.0Codo 90o20.250.5d/D% CierreKsC =0Vlv. comp.10.20.2Vlv. check01.50.010.0%0.20reduccion00.50.07/812.5%0.07Tees11.51.53/425.0%0.26Sum Kla 5.453.25/837.5%0.811/250.0%2.063/862.5%5.521/475.0%17.01/887.5%97.8

Q (L/s)Q (m3/h)V (m/s)RefDPHs1, mHs2, mHf1, mHf2, mHT tramo 1HT tramo 2HTotal tramos

0.000.000.000.00000ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!0.200.728904.45421.629590.1520.000.00.401.4417808.90843.259180.0760.000.00.602.1626713.341,264.888780.0510.000.00.802.8835617.791,686.518370.0380.000.01.003.6044522.242,108.147960.0300.000.01.204.3253426.692,529.777550.0250.000.01.405.0462331.142,951.407150.0220.000.01.605.7671235.583,373.036740.0190.000.01.806.4880140.033,794.666330.0170.000.02.007.2089044.484,216.295920.0150.000.01.395.0061836.452,927.983280.0220.000.0

&F \ &A

Lodos Deshidratados desde Centrifuga Proyectada

Lodos Deshidratados desde Filtro Banda Existente

Sistema encalado existente

Hoja1Caudal de lodos WAS68.3m3/h