= 6.00 L/s
= 62.7 mm
= AN SCH40
= 110
= 1.8 m
= 3 m
= 145.30 m
NUMERO
2
1
1
1
NUMERO
3
0
0
1
= 1.94 m/s
= 1.94 m/s
= 1.94 m/s
Jt = 0.171 m
Jt = 0.286 m
= 2.257 m
= 1.403 m
= 2.429 m
= 1.689 m
= 48.447 m
ACCESORIOS SUCCION
JUNTA 62.7
62.7
1.881
DIAMETRO mm
62.7 5.643
MATERIAL
VLVULA DE COMPUERTA 62.7
VLVULA DE PIE
TOTAL
62.7
Codo 90
0.502
COEFICIENTE RUGOSIDAD
LONGITUD DEL TRAMO SUCCION
LONGITUD DEL TRAMO DESCARGA
LONGITUD DEL TRAMO IMPULSION
SISTEMA DE BOMBEO
CALCULOS DE PRDIDAS POR ACCESORIOS
CAUDAL DE BOMBEO
DIAMETRO SUCCION - DESCARGA
DATOS GENERALES
JUNTA
0.000
ACCESORIOS DESCARGA DIAMETRO mm LONGITUD EQUIVALENTE
LONGITUD EQUIVALENTE
15.675
23.701
VLVULA DE COMPUERTA
CODO 90 62.7 8.465
VLVULA CHECK 62.7 6.270
62.7 0.000
TOTAL 14.735
RESULTADOS OBTENIDOS
PERDIDAS EN ACCESORIOS DESCARGA
PERDIDA TOTAL SUCCION
PERDIDA TOTAL DESCARGA
PERDIDA TOTAL IMPULSION
MAXIMA VELOCIDAD SUCCION
MAXIMA VELOCIDAD DESCARGA
MAXIMA VELOCIDAD IMPULSIN
PERDIDA DE CARGA TUB.SUCCION
PERDIDA DE CARGA TUB. DESCARGA
PERDIDAS EN ACCESORIOS SUCCION
4/2max * Q
V
87.4
.int
85.1
85.1
*
**643.10
C
QdLhf
-
= 6.00 L/s
= 2.429 m
= 1.689 m
= 48.447 m
= 9.07 m
= 12.17 m
= 3.10 m
= 805.00 msnm
= 55.66 m
= 65 % BOMBA
POTENCIA CALCULADA = 6.75 HP
POTENCIA ADOPTADA = 7.00 HP = 5.22 KW
= 805.00 m
= 1.8 m
= 0.99 m
= 2.429 m
= 6.00 L/s
= 1.94 m/s
= 62.70 mm
= 0.00 m.(positiva)
= 1.50 m.(negativa)
ALTURA NETA POSITIVA DE SUCCION DISPONIBLE = 3.85 m. N.P.S.H.D.
ALTURA NETA POSITIVA DE SUCCION REQUERIDA = 3.93 m. N.P.S.H.R.
CLCULO DE POTENCIA DEL EQUIPO MOTORBOMBA
DATOS GENERALES
RESULTADO POTENCIA APROXIMADA EQUIPO
DATOS GENERALES
CARACTERISTICAS BOMBA RECOMEDADA
CHEQUEO DE CAVITACION EN EQUIPO DE BOMBEO
6
: TRIFASICA
: Hierro fundido, bocas de aspiracin e impulsin roscada
CANTIDAD:
CONCLUSIN
LA BOMBA NO CAVITA
N.P.S.H.D > N.P.S.H.R
RESULTADOS CHEQUEO POR CAVITACIN
DIFERENCIA ESTTICA
ALTURA SOBRE EL NIVEL DEL MAR
PRDIDAS POR ALTURA SOBRE NIVEL DEL MAR
PRDIDAS POR TEMPERATURA 17C
PERDIDAS POR SUCCION (Hf)
CAUDAL BOMBEO
MODELO
CAUDAL DE BOMBEO
PERDIDA TOTAL POR SUCCION
PERDIDA TOTAL POR DESCARGA
PERDIDA TOTAL POR IMPULSION
COTA DE SUCCION
COTA DE DESCARGA
ALTURA DE OPERACIN
ALTURA DINAMICA TOTAL TDH
EFICIENCIA DEL EQUIPO
DIMETRO INT. SUCCIN
ALTURA DE ASPIRACIN
ALTURA DE ASPIRACIN
VELOCIDAD DE SUCCION
MAT. CONST.
: UNA [tipo centrfuga]
55.7TDH MXIMA (mca)
CAUDAL MXIMO (l/s)
-
CURVA DE INSTALACION: H = Ht+ Jt
= 6.00 l/s
= 0.25
= 9.07 m
= 12.17 m
= 3.10 m
= 2.43 m
= 1.69 m
= 48.45 m
= 52.56 m
PERDIDA DE CARGA EFECTIVA = 1.904 m/m
ECUACION : H = 3.10 + 1.904 * Q^(1/0.54)
10.1705
16.4172
CAUDAL (gpm) H altura (pies)
PERDIDAS DE CARGA EN LA DESCARGA (Jd)
303.9629
95.1048
57.9465
32.7188
91.5617
133.2089
8.00
4.00
3.1000
73.0308
92.6490 126.8064
5.0040
27.9084
0.0000
15.8508
31.7016
63.4032
79.2540
110.9556 239.5994
182.6242
0.00
1.00
2.00
5.00
3.00
40.6026
55.6645
7.00
6.00
CURVA CARACTERISTICA
CURVA CARACTERISTICA DEL SISTEMA
17.6623 47.5524
9.9728
CAUDAL (l/s) H altura (m)
PERDIDA DE CARGA TOTAL (Jt)= (Js+Jd+Ji)
PERDIDAS
DATOS GENERALES
CAUDAL DE BOMBEO
RANGO CAUDAL - INTERVALO
COTA DE SUCCION
COTA DE DESCARGA
DIFERENCIA DE NIVELES
PERDIDAS DE CARGA EN LA SUCCION (Js)
PERDIDAS DE GARGA EN LA IMPULSION (Ji)
0
50
100
150
200
250
300
350
0 20 40 60 80 100 120 140
AL
TU
RA
(p
ies)
CAUDAL (gpm)
-
= 6.00 L/s
= 73.00 mm
= 62.70 mm
= 145.30 m
= 5.15 mm
= 2.07E+08
= 2.10E+10 ACERO
= 1346.60 m/s
= 0.22 s
VELOCIDAD = 1.94 m/s
GOLPE DE ARIETE Ha = 261.66 mca
ALTURA ESTTICA Ht = 3.10 m
SOBRE PRESIN (Ha + Ht) = 264.76 m
PRESIN DE TRABAJO NETA DE LA TUBERA = 689.00 m
266.74
CAUDAL DE BOMBEO
DIAMETRO EXT. TUBO
SISTEMA DE BOMBEO
SOLUCIN - GOLPE DE ARIETE
DATOS GENERALES
LONGITUD DEL TRAMO IMPULSION
ESPESOR DEL TUBO
DIAMETRO INT. TUBO
TIEMPO DE FASE T (s)
CELERIDAD
LA TUBERA SELECCIONADA ES CAPAZ DE RESISTIR SOBREPRESIN
MDULO ELASTICIDAD DEL FLUIDO K (kg/m2)
MDULO ELASTICIDAD DEL MATERIAL E (kg/m2)
PRESIN DE TRABAJO NETA DE LA TUBERA > SOBRE PRESIN (Ha + Ht)
CONCLUSIN