bis facility presentation

28
BEMCO FOR INDUSTRIAL SERVICES (BIS) Manufacturing Equipment, Piping & Structure

Upload: hassan-fakha-pmp

Post on 24-Jan-2017

107 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: BIS Facility Presentation

BEMCO FOR INDUSTRIAL SERVICES (BIS)

Manufacturing Equipment, Piping & Structure

Page 2: BIS Facility Presentation

© ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

Introduction & Over View

Bemco for Industrial Services (BIS) operates from premises measuring a total of 90,000 SQM on a site next to the prestigious PP10 Power plant in Riyadh, Kingdom of Saudi Arabia, The factory was purposely built over last four years back to manufacture Pressure pipe spool prefabrication works, Pressure vessels, Steel plate works, Heavy structural steelwork and associated secondary steel work such as ladders, handrails and supports etc.

The emphasis has always been placed on having up to date modern equipment to ensure that high quality is achieved while maintaining good production levels in an excellent working environment

Page 3: BIS Facility Presentation

© ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

• Location

– Riyadh, Kingdom of Saudi Arabia

• Area

– Total Area: 90,000 sqm – Laydown Area: 35,000 sqm – Shop Floor: 22,900 sqm – Support Facilities: 5,200 sqm

• Employees

– 380 employees

• Capabilities – Prefab Piping Spools..... 500K DI/yr – HRSGs Non Pressure Parts...5K

Ton/yr – Steel Strcutures.......4K Ton/Yr – Manufacturing & Assembling of

Various type of Skids.

72% 

5% 

3% 

3% 

8% 

4%  5% 

Production

Engineering

Project Management

Procurment,Commercial & Proposal

Support Function toProduction

QA/QC

HR/Admin/Finance

Plant Capacity

Page 4: BIS Facility Presentation

© ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

Quality Policy & Accreditations “Quality a Tool for Success”

Accreditations

Quality Management System ISO 9001:2008

ASME Designators :

PP : Pressure Piping- Fabrication & Assembly

S: Power Boilers - Manufacturing & Assembly

U: Pressure Vessels- Manufacturing & Assembly

R: Repairs & Alterations

•Quality Policy BIS is committed to achieve and sustain excellence in Design Manufacturing and supply of Products and Services that shall meet Customer expectations by implementing the standards, Codes, Statutory and Regulatory requirements through continual improvement of performance and effective implementation of Quality management system through out the company

Page 5: BIS Facility Presentation

© ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

Company Accreditations

Page 6: BIS Facility Presentation

© ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

MAIN FABRICATION ACTIVITIES

PLATE FABRICATION STEEL STRUCTURE

PIPE SPOOLS FABRICATION SKID FABRICATION ASME PRESSURE

VESSELS

Page 7: BIS Facility Presentation

© ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

Organizational Chart

Page 8: BIS Facility Presentation

Factory Overview - Overall Plot Plan

Page 9: BIS Facility Presentation

Factory Overview - Piping Shops  “Efficiency and Quality is our aim, Low costs to the customer ”

Shop Overview

HGG Pipe Cutting M/c  CNC Band Saw  NC Double Head Welding M/c 

• 2 Bays  each of 20 M Wide x 206 M Long 

• Area: 8200 SQM  

• Crane capacity:   5x10 T x 206 M                   (3 & 2 Cranes/Bay) 

• Key Equipments  

− CNC Band Saw − Semi Automatic Welding Machines − NC Beveling Machines − 10 Ton OH Cranes − HGG RBPC 660 Pipe Cutting Machine

(Remote control with PRO CAM Software) − NC MIG/SAW Welding Machines Quick − Pipe Spool Fit Up Station − Full Conveyor System For Production Line

Page 10: BIS Facility Presentation

PIPING WORKSHOP

Factory Overview - Piping Workshop

Bay 1 (20 M W x 206 M L)

4120 SQM

Simple & Complex Spool Area

CNC Band Saw Semi Automatic Welding Machines NC Beveling M/cs 10 Ton OH Cranes

1 10 2 2

1000 DI/Day/Shift (8 Hr)

Bay 2 (20 M W x 206 M L)

4120 SQM

Simple & Complex Spool Area

HGG RBPC 660 Pipe Cutting NC MIG/SAW Welding Machines Quick Pipe Spool Fit Up Station Full Conveyor System For Production Line Semi Automatic Mig Welding Machines 10 Ton Over head Cranes

1 2 2 1

10 2

1500 DI/Day/Shift (8 Hr)

Bay‐1 

Bay‐2 

Description Area Function Major Equipment Quantity Capacity

Page 11: BIS Facility Presentation

Factory Overview - Steel Plate Fabrication Shops

Shop Overview

CNC Plasma   CNC Press Brake  C& B System 

• 3 Bays, Each Bay Spreads on Span 20 M Wide x 206 M Long 

• Area: 12,300 SQM

• Crane capacity: 6 x10 T x 206 M (2 Cranes/Bay)

• Key Equipment‘s − 24 & 16 M CNC Plasma Plate Cutting

Machines (Remote control with Lentek Software)

− Plate Rolling Machines − CNC Press Brake − Profile Rolling Machine − 10 Ton OH Cranes − MIG/SAW Welding Machines − C&B Automatic Welding Stations

Plate Rolling Machine 

Page 12: BIS Facility Presentation

Steel Fabrication Workshop

Bay 3 (20 M W x 206 M L)

4120 SQM

Set ups For Assembly For Initial Process like Cutting &

Bending

Guillotine Max Cut Semi Automatic Mig Welding M/cs Welding Rectifiers SMAW M/cs 10 Ton Over Head Cranes

1 10 10 2

Combine Capacity 3 Bays (3, 4 & 5) > 20

Tons/ Day/ Shift

Bay 4 (20 M W x 206 M L)

4120 SQM

Plate Fabrication For Duct &

Cylindrical Works

24 m Plasma & Oxy Gas CNC M/C 800 Ton Break Press Semi Automatic Mig Welding M/cs Welding Rectifiers SMAW M/cs 10 Ton Over Head Cranes

1 1

10 10 2

Bay 5 (20 M W x 206 M L)

4120 SQM

Plate Fabrication For Large Diameter Cylindrical Tanks &

Stacks

16 m Plasma & Oxy Gas CNC M/c NC Plate Rolling M/c 3m W x 50 mm Horizontal Profile Bending M/c Column & Boom Welding Stations Semi Automatic Mig Welding M/cs 10 Ton Over Head Cranes Submerged Arc Welding M/cs SMAW Welding M/cs Sweep Blasting Shop & Painting Shop

1 1 1 5

10 2

10 10 1

Factory Overview - Steel Plate Fabrication Workshops

Bay‐3 Bay‐4 

Bay‐5 

Description Area Function Major Equipment Quantity Capacity

Page 13: BIS Facility Presentation

Factory Overview - Medium Steel Structural Shop

Shop Overview

Band Saw 

• Area: 2400 sqm  

• Crane capacity:   3x10t x 100 m                    

• Key Equipment's − Band Saw Machines − Guillotine Press − Magnetic Drill Machines − Semi Automatic MIG welding Machines − SMAW Welding Machines − 10 Ton Over Head Cranes

Page 14: BIS Facility Presentation

STRUCTURE SHOP

Structural Shop (24m W x 100 m L)

2400 SQM

Structural fabrication Facility

Band Saw M/cs Guillotine Press

Magnetic Drill M/cs Semi Automatic Mig welding M/cs

SMAW Welding M/cs 10 Ton Over Head Cranes

5 4 5

10 8 3

Structural Fabrication: 15 Tons/Day /Shift (400 Ton/month)

Factory Overview - Structure Workshop

Description Area Function Major Equipment Quantity Capacity

Page 15: BIS Facility Presentation

Factory Overview - Surface Treatment Shop

Shop Overview

Blasting Machine 

• Area:              2000 SQM  

• Crane capacity:   1x 5 T x 76 M 

• Capacity:              50 Tons/Day Surface Treatment                   

• Key Equipments − Surface Treatment Machine − Sand Blasting Machine − Painting Airless Spray System

Page 16: BIS Facility Presentation

Factory Overview - Power & Compressor House

Overview

Power & Compressor House

(14 M W x 57 M L)

800 SQM Power Facility Diesel Generators @ 560KW

Oil Fee Air Compressors: 292 [email protected] 5 2

Total Power: 2800 KW Total Comp Air: 584 cfm

Description Area Function Major Equipment Quantity Capacity

Page 17: BIS Facility Presentation

Factory Overview - Welders Training Facility

Overview

Welders Training Facility (15 M W x 96 M L) 1488 SQM Training School

SMAW Welding Rectifier Machines 20 20 Welders Training at a Time

Description Area Function Major Equipment Quantity Capacity

Page 18: BIS Facility Presentation

Factory Overview - Material Laydown & Storage

Overview

Raw Material Laydown Area

12,000 SQM

Lay Down Area 10130 SQM

Separate Raw material Area For Piping &Structural

Finished Product Lay DownArea

20,000 SQM Lay Down Area 14660 SQM

Separate Finished material Lay down AreaFor Piping & Structural

Central store Area 1,008 SQM Stores Storage Area For Consumable , Tools,Power Tool M/cs etc.

Description Area Function Capacity

Page 19: BIS Facility Presentation

ENGINEERING  “ Excellence in Engineering offering the client the BEST SOLUTIONS” BIS Engineering department comprises of highly qualified personnel all

within the specific field of pipe design and operate from the main office. All personnel are fully experienced with pipe & Structure work design and manufacture and use the latest TEKLA, AUTOCAD, Pro CAM program including SMART PLANT 3D, Isometric and SPOOLGEN. The Piping engineering Team Design capabilities generically covers the following:- a. Generates detailed design shop drawings. b. Generates TAF, GPD & NC files for CNC cutting machines c. Generates documents for fabrication workshops covering:-

a. Material take offs (MTO) b. Weld map drawings c. Pipe cutting plans

ASME Design Validation for multiple projects using CAESAR-II

Page 20: BIS Facility Presentation

Presentation  Presentation 

Presentation 

BEMCO for Industrial Services

Overall Project Management

20 

Page 21: BIS Facility Presentation

BIS’s Major Contribution to various Projects

PP 10 Project 2012-2015

•Prefab Piping Spools- CS- 95,000 DI SS- 40,000 DI AS- 35,000 DI •Exhaust Stacks – 40 Sets- 2800 MT •Steel Structures – 2500 MT •BFP Skid frames – 210 MT

•Prefab Piping Spools- CS- 10,000 DI AS- 11,000 DI •Steel Structures –1100 MT • ASL Heaters Skid Assembly -12 Sets

PP 12 Project 2013-2015

•Piping Spools Erection- CS- 90,000 DI •Steel Structures Fabrication – 1500 MT

•Steel Structures Erection -5000 MT

QURRAYYAH CC Project 2012-2013

•Piping Spools Fabrication- CS- 22,000 DI •Blow Down Tanks with ASME Certification – 4 HRSG Units

HAIL CC Project 2015-2016

Page 22: BIS Facility Presentation

S . No.  PROJECT/SCOPE DESCRIPTION  ORDER ISSUED BY  QTY  UOM  % of 

Completion DELIVERY SCHEDULE AS PER 

CONTRACT/SCHEDULE 

            START DATE  END DATE 

1  Piping Works          

1.1  PP10 CCPP (Steam Blowing Piping)  Arabian Bemco  3,000   DI   95  Nov‐2015  Feb‐2016 

1.2  SSPP‐ BEP  HYUNDAI Heavy Industries  98,000  DI  97  MaY‐2015  Feb‐ 2016 

1.3  HAIL‐COMBINE CYCLE‐BEP  Piping         AMEC Foster Wheeler  

22,000  DI  100  Oct‐2015  Jan‐2016 

General  Steel Structural Works 

2  General Structure Works‐ PP 12CCPP  BEMCO‐GS   150  Ton   90  15‐Sep‐14  Dec‐15 

2.1 General Structure Works‐ PP 10CCPP  

Arabian Bemco  40   Ton   95  ‐‐‐‐‐‐‐‐  Nov‐15 

     

Bemco for Industrial Services Current Ongoing Projects (Piping & Structure)

Page 23: BIS Facility Presentation

  I: POWER 

S. NO.  MACHINE DESCRIPTION  CAPACITY  QTY  UOM FUNCTION/REMARKS 

1   Diesel Generators Sets   Power Rating/ 560kW  5  Nos.  Utilization Capacity ‐ 3 MW 2   Air Compressor   250 cfm / 8.6 bar  2  Nos.  For Utility Activity in Shop 

II: PIPING FABRICATION 

S. NO.  MACHINE DESCRIPTION   CAPACITY  QTY  UOM PROCESS  REMARKS 

1   CNC Pipe                                                                 Profile Cutting Machine  

Min. ‐ 48mm                          Max. ‐ 660mm                      Length ‐ 12000mm                Accuracy ± 1.5mm                 Wall Thick ‐ Up to 50mm 

1  No. Hot Plasma/Oxy Fuel for all Carbon Alloy Steel, SS 

Cutting Speed 550mm/Min. 

2   CNC Band Saw Machine  Max. ‐ 660mm                        Wall Thick ‐ Up to 50  1  No.  Cold Cutting  ‐ 

3   N.C. Pipe Beveling Machine Min. ‐ 114mm                         Max. ‐ 610mm                        Thick ‐ 6‐180mm 

2  Nos.  For All Steels Beveling Cutting    

4   N.C. Pipe Fit‐Up Machine Min. ‐ 168mm                         Max. ‐ 630mm                        Length ‐ 12000mm 

2  Sets  For All Pipe Fit‐Up Activities    

5  CNC Pipe                                                                  Welding Machine 

Min. ‐ 168mm                         Max. ‐ 630mm                        Wall Thick ‐ 3‐60mm 

2  Sets  For Carbon, Alloy & SSMIG+SAW Process Efficiency ‐ 600 Inches/Shift 

EQUIPMENT & MACHINERY SPECS & CAPABILITY

23 

Page 24: BIS Facility Presentation

6   Manual Welding Machines  Max. Weld Current 600A  28  Nos. For All Complex Spool SMAW    

7   Welding Machine  Max. Weld Current 500A  10  Nos. For All Complex Spool SMAW    

8   Welding Machine  Max. Weld Current 400A  20  Nos. For All Complex Spool SMAW    

9   Material Handling OHT Cranes   10 MT  10  Nos. For Piping, Plate Shop Activities    

10   Material Handling OHT Cranes   10 MT  3  Nos. For Structural Shop Activities    

11   PWHT Equipment  125 KVA  2  Nos. For PWHT Activities of Piping    70  KVA  8  Nos. 

III: SURFACE PREPARATION 

12  Shot Blast Machine  160 MT/Hour  1  No.  Shot Blasting before & after Fab. IV: STEEL FABRICATION SHOP 

13   CNC Plasma Cutting Machine  3 Mtr x 24 Mtr up to 80mmt  1  No.  Hot Plasma / Oxy Fuel 

for all type of steels 

14   CNC Plasma Cutting Machine   2.5 Mtr X 12.0 Mtr up to 40mmt  1  No.  Hot Plasma / Oxy Fuel 

for all type of steels 

15   Plate Rolling Machine  2.3 Mtr X 25mm Thick  1  No.  Cold Rolling 

16   Profile Bending Machine  ‐  1  No.  Cold Profile Bending 

17   Press Brake  6.1 Mtr (l) x 17mm (t) ‐ 8000 kV  1  No.    

EQUIPMENT & MACHINERY SPECS & CAPABILITIES

24 

Page 25: BIS Facility Presentation

© ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

HSE “BEMCO Follows 5 STAR SAFETY & HEALTH Management System”

Main Roles & Responsibilities

Define and Implement the HSE Plan for the construction and site activities

Set up Emergency Response Plan

Implement Security Plan

Carry out Safety Education, Training and Motivation Programs

Define and Implement the Constructional Environmental Plan

Define and Implement the Waste Management Program

Define and Implement the Pollution Contingency Plan

Implement Work permit System

Identification and Correction of Hazardous Scenarios

Monitor and Control Sub Contractors HSE Performance

Implement HSE Lessons Learned from Previous projects

•Safety Objective Prevent Human Injuries and Property Damage in the phase of Construction and Commissioning of the Plant in accordance with the defined HSE Plan.

Page 26: BIS Facility Presentation

© ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

HSE Safety and Health Training & Orientation

Address the Safety and Health Responsibilities of all Personnel

Incorporate it into Training and Job Performance /Practice

Employees must Understand the hazards they may be exposed to and how to prevent harm to themselves and others from hazard exposure

Orientation Training Program to all Workers

Controlling the Hazards

To Prevent and Control hazards Engineering Controls

Administrative Controls

Personal Protective Equipment

Safe Work Practices Communicated via Training, Positive reinforcement,

Correction of unsafe Performance, and Execution

Page 27: BIS Facility Presentation

© ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

HSE Long Term Strategic Goals

Change Culture And Behavior- We are Building a leading culture of Personal Accountability for Safety And Operational Discipline

Provide Employees with Knowledge and Tools- Well Established and Maintained Well Defines Standards, Requirements and tools that Integrated Safety into all Phase of Activities

Creates Safety Work Place- To Provide Facilities and Reducing / Eliminating all Known Hazard

SAFETY GOALS

Constantly monitor & assess the effectiveness of the entire Safety Systems

Continuously improve the applications of the Safety Systems

Ensure a comprehensive coverage of Safety Training Programs

Integrate across the corporation one set of Priorities and Safety Management System Functions

Actively Promotes a Safety Culture

Recognize and reward good Safety leadership thru out the Company

Page 28: BIS Facility Presentation

 www.arabianbemco.com 

Thank you