  • 7/31/2019 Aqualectra Presentation

    1/24

    21 years of Wind generationExperience

    Curacao Netherlands Antilles.

    Presented byMr. ir. Irvin Hanst

    Manager Corporate Affairs

  • 7/31/2019 Aqualectra Presentation

    2/24

  • 7/31/2019 Aqualectra Presentation

    3/24

    Legal structure of the corporation

    roductionroduction

    StIP/EGC

    Holder of 100%

    Common stock

    Mirant

    Holder of 100%

    Preferred stock

    100%

    mmon

    Stock

    100%

    Common

    Stock

    100%

    Common

    Stock

    49%

    Common

    Stock

    DistributionDistribution Multi UtilityMulti Utility

    CUCCUCHoldingsHoldings

    B.O.OB.O.O

  • 7/31/2019 Aqualectra Presentation

    4/24

    100% water production

    100% water distribution 90% electric power generation

    100% electric power distribution

    Responsibilities Aqualectra

  • 7/31/2019 Aqualectra Presentation

    5/24

    Characteristics electrical system

    66 kV transmission system (100% underground cables)

    30 kV sub-transmission system (100% underground cables)

    12 kV distribution system (75% underground cables)

    220/127V, 50 Hz and 380/220V, 50Hz LV system (50%

    underground cables)

    Peak electric load Curacao is 105 MW Total generation capacity Aqualectra is 165 MW

    75 MW steam units and 90 MW diesel units

    10 years ago 100 MW steam units and 35 MW diesel units

  • 7/31/2019 Aqualectra Presentation

    6/24

    Characteristics continued

    All power generation on transmission & sub

    transmission level

    Less then 1% of energy losses in transmission & subtransmission level

    Less then 2% of energy losses in distribution system

    Almost 9% of energy losses in LV system

  • 7/31/2019 Aqualectra Presentation

    7/24

    History wind generation Curacao

    Renewable energy is part of our business plansince the 1970s

    Resulted in contract agreement in 1984 for thefirst wind generator for Curacao at Tera Kora.

    Wind generator was a 300 kW NEWECS-25

    of manufactory FDO-Stork Type was fixed speed induction generator with

    stall

    This first wind generator became operationalin October 1985

  • 7/31/2019 Aqualectra Presentation

    8/24

    Experience first wind generator

    First wind generator tripped frequently on over

    speed

    Brakes suffered excessive wearing

    Major breakdown due to braking system of

    wind generator

    Extensive wind measurement and wind study

  • 7/31/2019 Aqualectra Presentation

    9/24

    Results study

    Wind in Curacao comes 95% of the time from thesame direction between NE and SE

    Wind speed is almost constant year around Average wind speed at 30 m is 8 - 9 m/s

    Weibull shape factor between 4 and 5

    Best sites Tera Cora and Playa Kanoa

    First wind generator was designed taking into accounta wind speed of 6.5 m/s measured at 10 m, based on

    30 years wind measurement done by the metrologicalservice of Curacao

  • 7/31/2019 Aqualectra Presentation

    10/24

  • 7/31/2019 Aqualectra Presentation

    11/24

    First wind park on Curacao

    New wind farm consisting of 12 x 250 kW wind

    generators (Manufactory Nedwind) was installed at

    Tera Kora Type fixed speed with stall optimized for wind of 8.5

    m/s

    Shaft height 30 m Rotor diameter 25 m

    Became operational in 1993

    Capacity factor 34%

    Availability 90%

  • 7/31/2019 Aqualectra Presentation

    12/24

    Tera Kora wind farm

  • 7/31/2019 Aqualectra Presentation

    13/24

    Continued

  • 7/31/2019 Aqualectra Presentation

    14/24

    Additional studies in 1995

    Additional wind measurements and study for 50m

    height

    Study to determine fluctuations in power output offirst wind farm

    Grid study to determine influence of first wind farm

    on the system frequency and voltage Grid study to determine maximum penetration level of

    wind generation for the Aqualectra system

  • 7/31/2019 Aqualectra Presentation

    15/24

    Results additional studies

    Average wind speed at 50 m is 9.5 m/s

    Wind fluctuations impact power output of the

    individual wind generators The wind fluctuations have little or no impact on the

    power output of the wind farm

    Since power output of wind farm is constant, this

    cause little or no fluctuations in the system frequencyand voltage

    Care shall be taken of the reactive power consumptionof the wind farm

    Maximum penetration level of wind generation is 12%

  • 7/31/2019 Aqualectra Presentation

    16/24

    Second wind farm owned by IPP

    Wind farm consisting of 18 x 500 kW wind generators

    (Manufactory Nedwind) was installed at Playa Kanoa

    Type fixed speed with active stall optimized for windspeeds between 9 and 12 m/s

    Shaft height 47.2 m

    Rotor diameter 46.1 m Became operational in 2000

    Average wind speed 9.2 m/s

    Capacity factor 58.3% Availability 96%

  • 7/31/2019 Aqualectra Presentation

    17/24

    Experiences second wind farm

    Relatively high consumption of reactive power

    In beginning trip on frequency deviations

    In beginning trip on voltage fluctuations

    In beginning trip on all faults in the electrical system

    After fine tuning these problems were solved and windgenerators only trip when the deviations exceed the set

    values, which is hardly never.

    The wind farm even withstand most of the faults in theelectrical system.

  • 7/31/2019 Aqualectra Presentation

    18/24

    Dilemma

    According to our utility plan the idea is to reach

    approximately 50% penetration level with wind energy

    by the year 2020. Study implemented in 1995 shows maximum

    penetration level of 12% due to reactive power

    consumption of induction type wind generators with

    stall or active stall.

    First wind farm is reaching 15 years which was its

    technical lifetime ( ROI reached after 9 years)

    Increasing fuel prices make wind energy veryattractive option to stabilize costs.

  • 7/31/2019 Aqualectra Presentation

    19/24

    How to proceed?

    Aqualectra is preparing a grid connection standard for

    Independent Power producers including Wind farms.

    Standard shall at least include:

    Voltage ride through requirements;

    Voltage control and reactive power capabilities; Off nominal frequency operating requirements;

    Power quality, harmonic and resonance issues;

    Monitoring requirements; Commissioning tests.

  • 7/31/2019 Aqualectra Presentation

    20/24

    Expectations wind energy

    New wind generator designs like: Doubly fed

    induction generators or Full converter types are

    promising. They seem able to fulfill the requirements of the grid

    connection standard we are preparing.

    This is being investigated and we expect the results by

    mid 2007.

    This study shall also comment on the impact of the

    new generation of wind farms on the maximum

    penetration level of wind power in the Aqualectrasystem.

  • 7/31/2019 Aqualectra Presentation

    21/24

    Continued

    If the results of the studies are positive the first wind

    farm of Aqualectra will be replaced by a new one

    before 2010. Probably 12 x 1 MW generators instead of 12 x 0.25

    MW.

    The site has space for approximately 25 wind

    generators.

    The experience with this new wind farm will show if it

    is feasible to upgrade the Playa Kanoa wind farm from

    18 x 0.5 MW to 18 x 1 MW units or bigger.

  • 7/31/2019 Aqualectra Presentation

    22/24

    Conclusions

    Wind power is very attractive option for Aqualectra

    Grid connection standards must be in place to prevent

    future problems with reactive power consumption andfrequency fluctuations.

    With stall and active stall induction generators thepenetration level for wind power in Curacao is limited

    to 12% which was already reached in 2000. Doubly fed induction generators and Full converter

    wind generators promise to solve actual problemsAqualectra encountered with wind power

    Hopefully this can increase the maximum penetrationlevel of wind power in Curacao up to at least 50%

  • 7/31/2019 Aqualectra Presentation

    23/24

    Questions?

  • 7/31/2019 Aqualectra Presentation

    24/24

    Thank you very much