21 years of Wind generationExperience
Curacao Netherlands Antilles.
Presented byMr. ir. Irvin Hanst
Manager Corporate Affairs
-
7/31/2019 Aqualectra Presentation
2/24
-
7/31/2019 Aqualectra Presentation
3/24
Legal structure of the corporation
roductionroduction
StIP/EGC
Holder of 100%
Common stock
Mirant
Holder of 100%
Preferred stock
100%
mmon
Stock
100%
Common
Stock
100%
Common
Stock
49%
Common
Stock
DistributionDistribution Multi UtilityMulti Utility
CUCCUCHoldingsHoldings
B.O.OB.O.O
-
7/31/2019 Aqualectra Presentation
4/24
100% water production
100% water distribution 90% electric power generation
100% electric power distribution
Responsibilities Aqualectra
-
7/31/2019 Aqualectra Presentation
5/24
Characteristics electrical system
66 kV transmission system (100% underground cables)
30 kV sub-transmission system (100% underground cables)
12 kV distribution system (75% underground cables)
220/127V, 50 Hz and 380/220V, 50Hz LV system (50%
underground cables)
Peak electric load Curacao is 105 MW Total generation capacity Aqualectra is 165 MW
75 MW steam units and 90 MW diesel units
10 years ago 100 MW steam units and 35 MW diesel units
-
7/31/2019 Aqualectra Presentation
6/24
Characteristics continued
All power generation on transmission & sub
transmission level
Less then 1% of energy losses in transmission & subtransmission level
Less then 2% of energy losses in distribution system
Almost 9% of energy losses in LV system
-
7/31/2019 Aqualectra Presentation
7/24
History wind generation Curacao
Renewable energy is part of our business plansince the 1970s
Resulted in contract agreement in 1984 for thefirst wind generator for Curacao at Tera Kora.
Wind generator was a 300 kW NEWECS-25
of manufactory FDO-Stork Type was fixed speed induction generator with
stall
This first wind generator became operationalin October 1985
-
7/31/2019 Aqualectra Presentation
8/24
Experience first wind generator
First wind generator tripped frequently on over
speed
Brakes suffered excessive wearing
Major breakdown due to braking system of
wind generator
Extensive wind measurement and wind study
-
7/31/2019 Aqualectra Presentation
9/24
Results study
Wind in Curacao comes 95% of the time from thesame direction between NE and SE
Wind speed is almost constant year around Average wind speed at 30 m is 8 - 9 m/s
Weibull shape factor between 4 and 5
Best sites Tera Cora and Playa Kanoa
First wind generator was designed taking into accounta wind speed of 6.5 m/s measured at 10 m, based on
30 years wind measurement done by the metrologicalservice of Curacao
-
7/31/2019 Aqualectra Presentation
10/24
-
7/31/2019 Aqualectra Presentation
11/24
First wind park on Curacao
New wind farm consisting of 12 x 250 kW wind
generators (Manufactory Nedwind) was installed at
Tera Kora Type fixed speed with stall optimized for wind of 8.5
m/s
Shaft height 30 m Rotor diameter 25 m
Became operational in 1993
Capacity factor 34%
Availability 90%
-
7/31/2019 Aqualectra Presentation
12/24
Tera Kora wind farm
-
7/31/2019 Aqualectra Presentation
13/24
Continued
-
7/31/2019 Aqualectra Presentation
14/24
Additional studies in 1995
Additional wind measurements and study for 50m
height
Study to determine fluctuations in power output offirst wind farm
Grid study to determine influence of first wind farm
on the system frequency and voltage Grid study to determine maximum penetration level of
wind generation for the Aqualectra system
-
7/31/2019 Aqualectra Presentation
15/24
Results additional studies
Average wind speed at 50 m is 9.5 m/s
Wind fluctuations impact power output of the
individual wind generators The wind fluctuations have little or no impact on the
power output of the wind farm
Since power output of wind farm is constant, this
cause little or no fluctuations in the system frequencyand voltage
Care shall be taken of the reactive power consumptionof the wind farm
Maximum penetration level of wind generation is 12%
-
7/31/2019 Aqualectra Presentation
16/24
Second wind farm owned by IPP
Wind farm consisting of 18 x 500 kW wind generators
(Manufactory Nedwind) was installed at Playa Kanoa
Type fixed speed with active stall optimized for windspeeds between 9 and 12 m/s
Shaft height 47.2 m
Rotor diameter 46.1 m Became operational in 2000
Average wind speed 9.2 m/s
Capacity factor 58.3% Availability 96%
-
7/31/2019 Aqualectra Presentation
17/24
Experiences second wind farm
Relatively high consumption of reactive power
In beginning trip on frequency deviations
In beginning trip on voltage fluctuations
In beginning trip on all faults in the electrical system
After fine tuning these problems were solved and windgenerators only trip when the deviations exceed the set
values, which is hardly never.
The wind farm even withstand most of the faults in theelectrical system.
-
7/31/2019 Aqualectra Presentation
18/24
Dilemma
According to our utility plan the idea is to reach
approximately 50% penetration level with wind energy
by the year 2020. Study implemented in 1995 shows maximum
penetration level of 12% due to reactive power
consumption of induction type wind generators with
stall or active stall.
First wind farm is reaching 15 years which was its
technical lifetime ( ROI reached after 9 years)
Increasing fuel prices make wind energy veryattractive option to stabilize costs.
-
7/31/2019 Aqualectra Presentation
19/24
How to proceed?
Aqualectra is preparing a grid connection standard for
Independent Power producers including Wind farms.
Standard shall at least include:
Voltage ride through requirements;
Voltage control and reactive power capabilities; Off nominal frequency operating requirements;
Power quality, harmonic and resonance issues;
Monitoring requirements; Commissioning tests.
-
7/31/2019 Aqualectra Presentation
20/24
Expectations wind energy
New wind generator designs like: Doubly fed
induction generators or Full converter types are
promising. They seem able to fulfill the requirements of the grid
connection standard we are preparing.
This is being investigated and we expect the results by
mid 2007.
This study shall also comment on the impact of the
new generation of wind farms on the maximum
penetration level of wind power in the Aqualectrasystem.
-
7/31/2019 Aqualectra Presentation
21/24
Continued
If the results of the studies are positive the first wind
farm of Aqualectra will be replaced by a new one
before 2010. Probably 12 x 1 MW generators instead of 12 x 0.25
MW.
The site has space for approximately 25 wind
generators.
The experience with this new wind farm will show if it
is feasible to upgrade the Playa Kanoa wind farm from
18 x 0.5 MW to 18 x 1 MW units or bigger.
-
7/31/2019 Aqualectra Presentation
22/24
Conclusions
Wind power is very attractive option for Aqualectra
Grid connection standards must be in place to prevent
future problems with reactive power consumption andfrequency fluctuations.
With stall and active stall induction generators thepenetration level for wind power in Curacao is limited
to 12% which was already reached in 2000. Doubly fed induction generators and Full converter
wind generators promise to solve actual problemsAqualectra encountered with wind power
Hopefully this can increase the maximum penetrationlevel of wind power in Curacao up to at least 50%
-
7/31/2019 Aqualectra Presentation
23/24
Questions?
-
7/31/2019 Aqualectra Presentation
24/24