Nombre Vr.Unitario Vr.TotalU.M. CantidadTipoCodigo
4,704 DUCTOS DE 12X4 TDP PAVIMENTO FLEXIBLE ETB 703,853.33m
13,586 ARENA DE REVOQUE (AMARILLA) Ins m 20,000.00 5,000.00 0.2500
15,325 BASE ASFLTICA MDC-1 EN OBRA Ins m 348,356.00 41,802.72 0.1200
15,326 BASE GRANULAR # 2, BG-2 Ins m 65,000.00 7,800.00 0.1200
15,315 CINTA DE MARCACIN PLASTICA Ins m 32,670.00 1,176.12 0.0360
2,839 CUADRILLA CONSTRUCCIN CMARAS Ana hc 26,570.99 1,859.97 0.0700
2,842 CUADRILLA DE EXCAVACIN Ana hc 20,966.57 62,899.71 3.0000
3,221 DUCTO TDP 4 Ins m 33,600.00 404,880.00 12.0500
13,598 HERRAMIENTA MENOR Esp % 639,866.66 63,986.67 10.0000
4,299 ROTURA DE PAVIMENTO Ana m 66,368.20 79,641.84 1.2000
14,723 VIBRO COMPACTADOR CANGURO Ins d 69,900.00 23,556.30 0.3370
3,161 VOLQUETA M3 Ins vj 45,000.00 11,250.00 0.2500
4,099 ACARREO A DISTANCIA MAYOR A 2 KM 30,398.84un
14,925 BUJE PARA ROCIADOR UL/FM CIM ESPXROS 1X1/2 Ins un 3,200.00 3,200.00 1.0000
13,598 HERRAMIENTA MENOR Esp % 29,949.60 449.24 1.5000
14,981 SELLANTE CPVC Ins lb 10,680.00 213.60 0.0200
14,980 TAPN SOLDADO CPVC UL/FM 1 Ins un 2,635.00 2,635.00 1.0000
8,172 TRANSPORTE TUBERA Ins kg 70.00 21.00 0.3000
14,927 TUBERA CPVC UL/FM RDE 13,5 EP X ESP 1 Ins un 19,900.00 23,880.00 1.2000
4,570 ACCESORIO ACERO CARBN ROSCADO 1 17,980.53un
14,996 CEMENTO SOLVENTE BM 1/4 GL Ins un 95,120.00 4,756.00 0.0500
14,945 CODO ACERO NEGRO ROSCADO X150 S.C.I. 1 Ins un 8,500.00 3,400.00 0.4000
4,515 MANO DE OBRA BB Ins hc 18,139.00 4,534.75 0.2500
15,007 TEE REDUCIDA BM CAMPXCAMP 1X1X3/4 Ins un 11,000.00 4,400.00 0.4000
15,086 TRANSPORTE Esp % 17,926.75 53.78 0.3000
15,008 UNIN ACERO NEGRO X150 S.C.I. 1 Ins un 4,180.00 836.00 0.2000
4,568 ACCESORIO ACERO CARBN ROSCADO 1/2 23,043.67un
14,943 CODO ACERO NEGRO ROSCADO X150 S.C.I. 1/2 Ins un 6,200.00 2,480.00 0.4000
4,515 MANO DE OBRA BB Ins hc 18,139.00 4,534.75 0.2500
15,003 TEE REDUCIDA BM CAMPXCAMP 2X2X3/4 Ins un 37,950.00 15,180.00 0.4000
15,086 TRANSPORTE Esp % 22,974.75 68.92 0.3000
15,004 UNIN ACERO NEGRO X150 S.C.I. 1/2 Ins un 3,900.00 780.00 0.2000
4,569 ACCESORIO ACERO CARBN ROSCADO 3/4 31,476.90un
14,944 CODO ACERO NEGRO ROSCADO X150 S.C.I. 3/4 Ins un 5,300.00 2,120.00 0.4000
4,515 MANO DE OBRA BB Ins hc 18,139.00 4,534.75 0.2500
15,005 TEE REDUCIDA BM CAMPXCAMP 3X3X1/2 Ins un 59,950.00 23,980.00 0.4000
15,086 TRANSPORTE Esp % 31,382.75 94.15 0.3000
15,006 UNIN ACERO NEGRO X150 S.C.I. 3/4 Ins un 3,740.00 748.00 0.2000
1,826 ACCESORIO COBRE 1/2 3,795.12un
3,383 CODO 90 COBRE 1/2 Ins un 753.00 301.20 0.4000
-
Titulo Base de Datos
Fecha : 02/06/10
2Pgina :
ANALISIS DETALLADOS ALFABETICOS
Nombre Vr.Unitario Vr.TotalU.M. CantidadTipoCodigo
15,151 LIMPIADOR FUNDENTE COBRE Ins lb 18,620.00 744.80 0.0400
4,515 MANO DE OBRA BB Ins hc 18,139.00 1,451.12 0.0800
2,940 SOLDADURA ESTAO DE PLATA 95,5 Ins lb 32,800.00 656.00 0.0200
3,395 TEE COBRE 1/2 Ins un 1,325.00 530.00 0.4000
15,133 UNIN COBRE 1/2 Ins un 560.00 112.00 0.2000
1,896 ACCESORIO COBRE 1 8,652.72un
3,384 CODO 90 COBRE 1 Ins un 4,452.00 1,780.80 0.4000
15,151 LIMPIADOR FUNDENTE COBRE Ins lb 18,620.00 744.80 0.0400
4,515 MANO DE OBRA BB Ins hc 18,139.00 1,451.12 0.0800
2,940 SOLDADURA ESTAO DE PLATA 95,5 Ins lb 32,800.00 656.00 0.0200
3,397 TEE COBRE 1 Ins un 8,900.00 3,560.00 0.4000
15,134 UNIN COBRE 1 Ins un 2,300.00 460.00 0.2000
4,660 ACCESORIO COBRE 1 1/2 14,303.65un
3,383 CODO 90 COBRE 1/2 Ins un 753.00 301.20 0.4000
15,151 LIMPIADOR FUNDENTE COBRE Ins lb 18,620.00 1,489.60 0.0800
4,515 MANO DE OBRA BB Ins hc 18,139.00 2,720.85 0.1500
2,940 SOLDADURA ESTAO DE PLATA 95,5 Ins lb 32,800.00 1,312.00 0.0400
15,135 TEE COBRE 1 1/2 Ins un 19,700.00 7,880.00 0.4000
15,138 UNIN GALVANIZADA 1 1/2 Ins un 3,000.00 600.00 0.2000
1,884 ACCESORIO GALVANIZADO 1 8,492.52un
3,301 CODO GALVANIZADO 1 Ins un 1,318.00 527.20 0.4000
4,515 MANO DE OBRA BB Ins hc 18,139.00 1,451.12 0.0800
15,152 SELLANTE ACERO TRABA QUIMICA ANAEROBICA
.55 GR
Ins un 64,230.00 5,138.40 0.0800
3,494 TEE GALVANIZADA 1 Ins un 2,668.00 1,067.20 0.4000
3,497 UNIN GALVANIZADA 1 Ins un 1,543.00 308.60 0.2000
1,806 ACCESORIO GALVANIZADO 1/2 5,857.27un
3,299 CODO GALVANIZADO 1/2 Ins un 910.00 364.00 0.4000
4,515 MANO DE OBRA BB Ins hc 18,139.00 2,358.07 0.1300
15,152 SELLANTE ACERO TRABA QUIMICA ANAEROBICA
.55 GR
Ins un 64,230.00 2,569.20 0.0400
3,492 TEE GALVANIZADA 1/2 Ins un 1,090.00 436.00 0.4000
3,495 UNIN GALVANIZADA 1/2 Ins un 650.00 130.00 0.2000
4,571 ACCESORIO HIERRO DCTIL RANURADO 2 14,065.97un
14,946 CODO 90 RANURADO HIERRO DUCTIL 2 Ins un 7,511.00 3,004.40 0.4000
4,515 MANO DE OBRA BB Ins hc 18,139.00 5,441.70 0.3000
15,009 TEE RANURADA HIERRO DUCTIL 2 Ins un 10,382.00 4,152.80 0.4000
15,086 TRANSPORTE Esp % 14,023.90 42.07 0.3000
15,010 UNIN FLEXIBLE RANURADA HIERRO DUCTIL 2 Ins un 7,125.00 1,425.00 0.2000
4,572 ACCESORIO HIERRO DCTIL RANURADO 3 22,223.97un
14,947 CODO 90 RANURADO HIERRO DUCTIL 3 Ins un 14,500.00 5,800.00 0.4000
-
Titulo Base de Datos
Fecha : 02/06/10
3Pgina :
ANALISIS DETALLADOS ALFABETICOS
Nombre Vr.Unitario Vr.TotalU.M. CantidadTipoCodigo
4,515 MANO DE OBRA BB Ins hc 18,139.00 5,441.70 0.3000
15,011 TEE RANURADA HIERRO DUCTIL 3 Ins un 21,552.00 8,620.80 0.4000
15,086 TRANSPORTE Esp % 22,157.50 66.47 0.3000
15,012 UNIN FLEXIBLE RANURADA HIERRO DUCTIL 3 Ins un 11,475.00 2,295.00 0.2000
4,573 ACCESORIO HIERRO DCTIL RANURADO 4 27,314.60un
14,948 CODO 90 RANURADO HIERRO DUCTIL 4 Ins un 20,258.00 8,103.20 0.4000
4,515 MANO DE OBRA BB Ins hc 18,139.00 5,441.70 0.3000
15,013 TEE RANURADA HIERRO DUCTIL 4 Ins un 26,170.00 10,468.00 0.4000
15,086 TRANSPORTE Esp % 27,232.90 81.70 0.3000
15,014 UNIN FLEXIBLE RANURADA HIERRO DUCTIL 4 Ins un 16,100.00 3,220.00 0.2000
4,845 ACCESORIO PARA SPT, LA-402 CODENSA 242,034.00un
15,520 ALAMBRE COBRE DESNUDO AWG 4 Ins m 4,770.00 76,320.00 16.0000
15,389 CINTA ACERO INOXIDABLE 1/2 Ins m 2,420.00 4,840.00 2.0000
15,458 CONECTOR VARILLA PUESTA A TIERRA 5/8 Ins un 12,786.00 12,786.00 1.0000
1,767 HEBILLA 1/2 Ins un 429.00 858.00 2.0000
14,325 TUBO IMC GALVANIZADO 1 1/2 ESP. 098 Ins m 16,920.00 50,760.00 3.0000
15,462 VARILLA DE COBRE 5/8X2.4MTS Ins un 96,470.00 96,470.00 1.0000
4,846 ACCESORIO PARA SPT, LA-402
CODENSA+INSTAL.
265,136.15un
15,520 ALAMBRE COBRE DESNUDO AWG 4 Ins m 4,770.00 76,320.00 16.0000
15,389 CINTA ACERO INOXIDABLE 1/2 Ins m 2,420.00 4,840.00 2.0000
15,458 CONECTOR VARILLA PUESTA A TIERRA 5/8 Ins un 12,786.00 12,786.00 1.0000
2,851 CUADRILLA VESTIDA POSTES Ana hc 20,477.04 20,477.04 1.0000
1,767 HEBILLA 1/2 Ins un 429.00 858.00 2.0000
13,598 HERRAMIENTA MENOR Esp % 262,511.04 2,625.11 1.0000
14,325 TUBO IMC GALVANIZADO 1 1/2 ESP. 098 Ins m 16,920.00 50,760.00 3.0000
15,462 VARILLA DE COBRE 5/8X2.4MTS Ins un 96,470.00 96,470.00 1.0000
4,650 ACCESORIO PVCS 2 7,330.13un
3,608 CODO 90 SANITARIA 2 Ins un 2,169.00 889.29 0.4100
8,134 CUADRILLA INSTALACIONES OF + AYUDANTE Ins hc 18,118.00 1,449.44 0.0800
2,927 SOLDADURA PVC LIQUIDA 1/4 Ins un 58,310.00 1,749.30 0.0300
3,635 UNIN SANITARIA 2 Ins un 1,563.00 328.23 0.2100
3,641 YEE SANITARIA 2 Ins un 7,107.00 2,913.87 0.4100
4,652 ACCESORIO PVCS 4 11,848.82un
13,380 CODO 45 PVC SANITARIO CXC 4 Ins un 8,696.00 3,565.36 0.4100
15,158 CODO 90 SANITARIA 4 Ins un 9,531.00 3,907.71 0.4100
8,153 CUADRILLA OFICIAL+2 AYUDANTES Ins hc 22,559.00 1,804.72 0.0800
2,927 SOLDADURA PVC LIQUIDA 1/4 Ins un 58,310.00 1,749.30 0.0300
15,205 UNIN SANITARIA 4 Ins un 3,913.00 821.73 0.2100
4,556 ACCESORIO SOLDADO CPVC UL/FM 1 12,190.01un
-
Titulo Base de Datos
Fecha : 02/06/10
4Pgina :
ANALISIS DETALLADOS ALFABETICOS
Nombre Vr.Unitario Vr.TotalU.M. CantidadTipoCodigo
14,931 CODO 45 CPVC UL/FM SOLXSOL 1 Ins un 7,772.00 3,108.80 0.4000
4,515 MANO DE OBRA BB Ins hc 18,139.00 4,534.75 0.2500
14,981 SELLANTE CPVC Ins lb 10,680.00 213.60 0.0200
14,989 TEE SENCILLA CPVC UL/FM SOLXSOL 1 Ins un 8,991.00 3,596.40 0.4000
15,086 TRANSPORTE Esp % 12,153.55 36.46 0.3000
14,990 UNIN SENCILLA CPVC UL/FM SOLXSOL 1 Ins un 3,500.00 700.00 0.2000
4,557 ACCESORIO SOLDADO CPVC UL/FM 2 33,477.28un
14,932 CODO 45 CPVC UL/FM SOLXSOL 2 Ins un 19,720.00 7,888.00 0.4000
4,515 MANO DE OBRA BB Ins hc 18,139.00 4,534.75 0.2500
14,981 SELLANTE CPVC Ins lb 10,680.00 213.60 0.0200
14,991 TEE SENCILLA CPVC UL/FM SOLXSOL 2 Ins un 43,152.00 17,260.80 0.4000
15,086 TRANSPORTE Esp % 33,377.15 100.13 0.3000
14,992 UNIN SENCILLA CPVC UL/FM SOLXSOL 2 Ins un 17,400.00 3,480.00 0.2000
4,558 ACCESORIO SOLDADO CPVC UL/FM 3 89,929.33un
14,933 CODO 45 CPVC UL/FM SOLXSOL 3 Ins un 69,600.00 27,840.00 0.4000
4,515 MANO DE OBRA BB Ins hc 18,139.00 4,534.75 0.2500
14,981 SELLANTE CPVC Ins lb 10,680.00 213.60 0.0200
14,993 TEE SENCILLA CPVC UL/FM SOLXSOL 3 Ins un 125,280.00 50,112.00 0.4000
15,086 TRANSPORTE Esp % 89,660.35 268.98 0.3000
14,994 UNIN SENCILLA CPVC UL/FM SOLXSOL 3 Ins un 34,800.00 6,960.00 0.2000
4,555 ACCESORIO SOLDADO CPVC UL/FM 3/4 8,832.57un
14,930 CODO 45 CPVC UL/FM SOLXSOL 3/4 Ins un 3,038.00 1,215.20 0.4000
4,515 MANO DE OBRA BB Ins hc 18,139.00 4,534.75 0.2500
14,981 SELLANTE CPVC Ins lb 10,680.00 213.60 0.0200
14,987 TEE SENCILLA CPVC UL/FM SOLXSOL 3/4 Ins un 5,568.00 2,227.20 0.4000
15,086 TRANSPORTE Esp % 8,806.15 26.42 0.3000
14,988 UNIN SENCILLA CPVC UL/FM SOLXSOL 3/4 Ins un 3,077.00 615.40 0.2000
131 ACCESORIOS PARA DRENAJE 4 26,738.98un
3,684 AGUA Ins lt 20.00 15.20 0.7600
13,586 ARENA DE REVOQUE (AMARILLA) Ins m 20,000.00 200.00 0.0100
804 CEMENTO GRIS Ins kg 520.00 473.20 0.9100
4,489 MANO DE OBRA AA Ins hc 16,490.00 9,894.00 0.6000
12,114 SIFN PVC 135 4 Ins un 15,686.00 16,156.58 1.0300
132 ACCESORIOS PARA DRENAJE 6 121,515.25un
13,586 ARENA DE REVOQUE (AMARILLA) Ins m 20,000.00 200.00 0.0100
804 CEMENTO GRIS Ins kg 520.00 972.40 1.8700
3,609 CODO 90 1/4 CXC SANITARIO 6 Ins un 57,415.00 91,289.85 1.5900
4,489 MANO DE OBRA AA Ins hc 16,490.00 11,543.00 0.7000
3,464 SIFN DE GRES 6 Ins un 17,000.00 17,510.00 1.0300
238 ACERO TRANSFERENCIA 3,137.70kg
-
Titulo Base de Datos
Fecha : 02/06/10
5Pgina :
ANALISIS DETALLADOS ALFABETICOS
Nombre Vr.Unitario Vr.TotalU.M. CantidadTipoCodigo
1,903 HIERRO FIG G-60 1/2 Ins kg 2,320.00 2,436.00 1.0500
4,489 MANO DE OBRA AA Ins hc 16,490.00 494.70 0.0300
1,850 SEGUETA NICHOLSON Ins un 6,900.00 207.00 0.0300
4,745 ACOM. AREA BT, CABLE ANTIFRAUDE. LA 361
CODENSA O NCA-351 IPSE
348,862.65un
15,394 ACOMETIDA CONC. CU 1X8+8 AWG 600V XLPE Ins m 10,160.00 101,600.00 10.0000
15,393 ACOMETIDA CONC.CU 3X8+1X10,600V XLPE Ins m 16,840.00 168,400.00 10.0000
15,398 CONECTOR DENTADO CON PORTAFUSIBLE Ins un 6,865.00 6,865.00 1.0000
15,457 CONECTOR TIPO CUA PARA ACOMETIDA BT Ins un 528.00 1,056.00 2.0000
15,392 CONECTOR TORNILLO CHAQUETA AISLANTE TIPO 2 Ins un 6,234.00 31,170.00 5.0000
2,851 CUADRILLA VESTIDA POSTES Ana hc 20,477.04 30,715.56 1.5000
13,598 HERRAMIENTA MENOR Esp % 345,408.56 3,454.09 1.0000
15,395 PERCHA PORTA AISLADOR 1 PUESTO Ins un 5,452.00 5,452.00 1.0000
14,891 TENSORES DE ALINEACIN Ins un 150.00 150.00 1.0000
4,747 ACOM. AREA LA-363-1 CODENSA O NCA-354
IPSE
566,476.46un
15,394 ACOMETIDA CONC. CU 1X8+8 AWG 600V XLPE Ins m 10,160.00 101,600.00 10.0000
15,396 ADAPTADOR TERMINAL PVC 1/2 Ins un 130.00 130.00 1.0000
13,559 ALAMBRE COBRE THW 8 AWG Ins m 2,590.00 5,180.00 2.0000
15,397 BOQUILLA GALVANIZADA 1 Ins un 995.00 995.00 1.0000
3,226 CAPACETE 1 Ins un 1,760.00 1,760.00 1.0000
15,458 CONECTOR VARILLA PUESTA A TIERRA 5/8 Ins un 12,786.00 12,786.00 1.0000
2,851 CUADRILLA VESTIDA POSTES Ana hc 20,477.04 51,192.60 2.5000
15,463 GRAPA P/SUJ ACOMETIDA Ins un 4,700.00 4,700.00 1.0000
13,598 HERRAMIENTA MENOR Esp % 514,978.60 51,497.86 10.0000
314 INTER. BIPOLAR SAFIC ATORNILLABLE IN 40A Ins un 48,720.00 48,720.00 1.0000
15,460 MEDIDOR DE ENERGIA ACTIVA 15 (60) A 120V Ins un 170,520.00 170,520.00 1.0000
14,891 TENSORES DE ALINEACIN Ins un 150.00 300.00 2.0000
3,598 TUBO CONDUIT PVC 1/2 Ins m 4,650.00 4,650.00 1.0000
14,323 TUBO IMC GALVANIZADO 1 ESP. 090 Ins m 10,650.00 15,975.00 1.5000
15,462 VARILLA DE COBRE 5/8X2.4MTS Ins un 96,470.00 96,470.00 1.0000
4,749 ACOM. AREA. L.A-363-3 CODENSA O NCA-356
IPSE
638,503.93un
15,466 ABRAZADERA PARA TUBO DE METAL GALV. 1/2 Ins un 620.00 1,860.00 3.0000
15,394 ACOMETIDA CONC. CU 1X8+8 AWG 600V XLPE Ins m 10,160.00 101,600.00 10.0000
15,396 ADAPTADOR TERMINAL PVC 1/2 Ins un 130.00 130.00 1.0000
866 ALAMBRE COBRE THW 8 AWG THHN/NN Ins m 3,768.00 7,536.00 2.0000
15,465 ARMELLA PAR ANCALJE Ins un 580.00 580.00 1.0000
15,397 BOQUILLA GALVANIZADA 1 Ins un 995.00 995.00 1.0000
2,834 CAJA CONTADOR 28X32 MONO Ins un 42,920.00 42,920.00 1.0000
3,226 CAPACETE 1 Ins un 1,760.00 1,760.00 1.0000
15,458 CONECTOR VARILLA PUESTA A TIERRA 5/8 Ins un 12,786.00 12,786.00 1.0000
2,851 CUADRILLA VESTIDA POSTES Ana hc 20,477.04 61,431.12 3.0000
13,598 HERRAMIENTA MENOR Esp % 580,458.12 58,045.81 10.0000
314 INTER. BIPOLAR SAFIC ATORNILLABLE IN 40A Ins un 48,720.00 48,720.00 1.0000
15,460 MEDIDOR DE ENERGIA ACTIVA 15 (60) A 120V Ins un 170,520.00 170,520.00 1.0000
15,467 PERNO DE EXPANSIN 3/16 Ins un 1,650.00 9,900.00 6.0000
-
Titulo Base de Datos
Fecha : 02/06/10
6Pgina :
ANALISIS DETALLADOS ALFABETICOS
Nombre Vr.Unitario Vr.TotalU.M. CantidadTipoCodigo
14,891 TENSORES DE ALINEACIN Ins un 150.00 300.00 2.0000
3,598 TUBO CONDUIT PVC 1/2 Ins m 4,650.00 6,975.00 1.5000
14,323 TUBO IMC GALVANIZADO 1 ESP. 090 Ins m 10,650.00 15,975.00 1.5000
15,462 VARILLA DE COBRE 5/8X2.4MTS Ins un 96,470.00 96,470.00 1.0000
4,746 ACOM. AREA. LA 363 CODENSA O NCA-353 IPSE 609,866.53un
15,394 ACOMETIDA CONC. CU 1X8+8 AWG 600V XLPE Ins m 10,160.00 101,600.00 10.0000
15,396 ADAPTADOR TERMINAL PVC 1/2 Ins un 130.00 130.00 1.0000
13,559 ALAMBRE COBRE THW 8 AWG Ins m 2,590.00 5,180.00 2.0000
15,391 AMARRE PLSTICO CABLE TRENZADO Ins par 40.00 80.00 2.0000
13,577 ANGULO 1-1/4 X 1/8 A015 Ins m 5,874.00 5,874.00 1.0000
15,397 BOQUILLA GALVANIZADA 1 Ins un 995.00 995.00 1.0000
2,834 CAJA CONTADOR 28X32 MONO Ins un 42,920.00 42,920.00 1.0000
3,226 CAPACETE 1 Ins un 1,760.00 1,760.00 1.0000
15,458 CONECTOR VARILLA PUESTA A TIERRA 5/8 Ins un 12,786.00 12,786.00 1.0000
2,851 CUADRILLA VESTIDA POSTES Ana hc 20,477.04 61,431.12 3.0000
13,598 HERRAMIENTA MENOR Esp % 554,424.12 55,442.41 10.0000
1,001 INTER. MONOPOLAR SAFIC ATORNILLABLE IN 40A Ins un 27,028.00 27,028.00 1.0000
15,460 MEDIDOR DE ENERGIA ACTIVA 15 (60) A 120V Ins un 170,520.00 170,520.00 1.0000
15,461 PERNO DE EXPANSION 3/8 Ins un 2,200.00 4,400.00 2.0000
14,891 TENSORES DE ALINEACIN Ins un 150.00 300.00 2.0000
3,598 TUBO CONDUIT PVC 1/2 Ins m 4,650.00 6,975.00 1.5000
14,323 TUBO IMC GALVANIZADO 1 ESP. 090 Ins m 10,650.00 15,975.00 1.5000
15,462 VARILLA DE COBRE 5/8X2.4MTS Ins un 96,470.00 96,470.00 1.0000
4,748 ACOM. AREA. LA-363-2 CODENSA O NCA-355
IPSE
640,677.53un
15,464 ABRAZADERA P/TUBO METALICO GALV. 1 Ins un 400.00 1,200.00 3.0000
15,394 ACOMETIDA CONC. CU 1X8+8 AWG 600V XLPE Ins m 10,160.00 101,600.00 10.0000
15,396 ADAPTADOR TERMINAL PVC 1/2 Ins un 130.00 130.00 1.0000
866 ALAMBRE COBRE THW 8 AWG THHN/NN Ins m 3,768.00 7,536.00 2.0000
15,465 ARMELLA PAR ANCALJE Ins un 580.00 580.00 1.0000
15,397 BOQUILLA GALVANIZADA 1 Ins un 995.00 995.00 1.0000
2,834 CAJA CONTADOR 28X32 MONO Ins un 42,920.00 42,920.00 1.0000
3,226 CAPACETE 1 Ins un 1,760.00 1,760.00 1.0000
3,301 CODO GALVANIZADO 1 Ins un 1,318.00 2,636.00 2.0000
15,458 CONECTOR VARILLA PUESTA A TIERRA 5/8 Ins un 12,786.00 12,786.00 1.0000
2,851 CUADRILLA VESTIDA POSTES Ana hc 20,477.04 61,431.12 3.0000
13,598 HERRAMIENTA MENOR Esp % 582,434.12 58,243.41 10.0000
314 INTER. BIPOLAR SAFIC ATORNILLABLE IN 40A Ins un 48,720.00 48,720.00 1.0000
15,460 MEDIDOR DE ENERGIA ACTIVA 15 (60) A 120V Ins un 170,520.00 170,520.00 1.0000
15,467 PERNO DE EXPANSIN 3/16 Ins un 1,650.00 9,900.00 6.0000
14,891 TENSORES DE ALINEACIN Ins un 150.00 300.00 2.0000
3,598 TUBO CONDUIT PVC 1/2 Ins m 4,650.00 6,975.00 1.5000
14,323 TUBO IMC GALVANIZADO 1 ESP. 090 Ins m 10,650.00 15,975.00 1.5000
15,462 VARILLA DE COBRE 5/8X2.4MTS Ins un 96,470.00 96,470.00 1.0000
4,750 ACOM. AREA. LA-363-4 CODENSA O NCA-357
IPSE
661,487.33un
15,142 ABRAZADERA ACERO 1 Ins un 2,500.00 5,000.00 2.0000
-
Titulo Base de Datos
Fecha : 02/06/10
7Pgina :
ANALISIS DETALLADOS ALFABETICOS
Nombre Vr.Unitario Vr.TotalU.M. CantidadTipoCodigo
15,149 ABRAZADERA ACERO 1/2 Ins un 560.00 1,120.00 2.0000
15,394 ACOMETIDA CONC. CU 1X8+8 AWG 600V XLPE Ins m 10,160.00 101,600.00 10.0000
866 ALAMBRE COBRE THW 8 AWG THHN/NN Ins m 3,768.00 7,536.00 2.0000
15,391 AMARRE PLSTICO CABLE TRENZADO Ins par 40.00 80.00 2.0000
13,577 ANGULO 1-1/4 X 1/8 A015 Ins m 5,874.00 5,874.00 1.0000
15,465 ARMELLA PAR ANCALJE Ins un 580.00 580.00 1.0000
15,397 BOQUILLA GALVANIZADA 1 Ins un 995.00 995.00 1.0000
15,468 BOQUILLA GALVANIZADA 1/2 Ins un 185.00 185.00 1.0000
2,834 CAJA CONTADOR 28X32 MONO Ins un 42,920.00 42,920.00 1.0000
3,226 CAPACETE 1 Ins un 1,760.00 1,760.00 1.0000
15,458 CONECTOR VARILLA PUESTA A TIERRA 5/8 Ins un 12,786.00 12,786.00 1.0000
2,851 CUADRILLA VESTIDA POSTES Ana hc 20,477.04 61,431.12 3.0000
13,598 HERRAMIENTA MENOR Esp % 601,352.12 60,135.21 10.0000
314 INTER. BIPOLAR SAFIC ATORNILLABLE IN 40A Ins un 48,720.00 48,720.00 1.0000
15,460 MEDIDOR DE ENERGIA ACTIVA 15 (60) A 120V Ins un 170,520.00 170,520.00 1.0000
15,467 PERNO DE EXPANSIN 3/16 Ins un 1,650.00 13,200.00 8.0000
15,461 PERNO DE EXPANSION 3/8 Ins un 2,200.00 4,400.00 2.0000
14,891 TENSORES DE ALINEACIN Ins un 150.00 300.00 2.0000
14,323 TUBO IMC GALVANIZADO 1 ESP. 090 Ins m 10,650.00 15,975.00 1.5000
14,321 TUBO IMC GALVANIZADO 1/2 ESP. 080 Ins m 6,600.00 9,900.00 1.5000
15,462 VARILLA DE COBRE 5/8X2.4MTS Ins un 96,470.00 96,470.00 1.0000
4,753 ACOM. CABLE CU 3X6+1X8 AWG TUBO EMT 1 55,470.90m
15,473 ADAPTADOR TERMINAL EMT 1 Ins un 1,330.00 176.89 0.1330
879 CABLE COBRE THW 6 AWG Ins m 5,247.00 15,741.00 3.0000
878 CABLE COBRE THW 8 AWG Ins m 5,247.00 5,247.00 1.0000
4,709 CUADRILLA INSTAL. INTERNAS Ana hc 20,183.45 25,229.31 1.2500
13,598 HERRAMIENTA MENOR Esp % 50,428.09 5,042.81 10.0000
14,342 TUBO EMT 1 ESP.057 Ins m 3,420.00 3,591.00 1.0500
15,366 UNIN CONDUIT GALV. EMT , 1 Ins un 1,330.00 442.89 0.3330
4,754 ACOM. CABLE CU 3X6+1X8 AWG TUBO IMC 1 63,978.42m
15,474 BOQUILLA TERMINAL IMC 1 Ins un 925.00 123.03 0.1330
879 CABLE COBRE THW 6 AWG Ins m 5,247.00 15,741.00 3.0000
878 CABLE COBRE THW 8 AWG Ins m 5,247.00 5,247.00 1.0000
4,709 CUADRILLA INSTAL. INTERNAS Ana hc 20,183.45 25,229.31 1.2500
13,598 HERRAMIENTA MENOR Esp % 58,162.20 5,816.22 10.0000
14,323 TUBO IMC GALVANIZADO 1 ESP. 090 Ins m 10,650.00 11,182.50 1.0500
15,368 UNIN CONDUIT GALV. IMC , 1 Ins un 1,920.00 639.36 0.3330
4,751 ACOM. CABLE. CU 3X2/0+1X1/0 AWG PVC 2 228,261.70m
15,469 ADAPTADOR TERMINAL PVC 2 Ins un 290.00 38.57 0.1330
15,471 BORNA TERMINAL 2/0 AWG Ins un 14,900.00 5,960.00 0.4000
15,470 BORNA TERMINAL1/0AWG Ins un 15,476.00 2,166.64 0.1400
846 CABLE COBRE DESNUDO AWG NO. 4 Ins m 9,540.00 9,540.00 1.0000
882 CABLE COBRE THW 1/0 AWG Ins m 24,600.00 25,830.00 1.0500
883 CABLE COBRE THW 2/0 AWG Ins m 32,485.00 97,455.00 3.0000
4,709 CUADRILLA INSTAL. INTERNAS Ana hc 20,183.45 40,366.90 2.0000
13,598 HERRAMIENTA MENOR Esp % 207,510.64 20,751.06 10.0000
-
Titulo Base de Datos
Fecha : 02/06/10
8Pgina :
ANALISIS DETALLADOS ALFABETICOS
Nombre Vr.Unitario Vr.TotalU.M. CantidadTipoCodigo
2,942 LIMPIADOR REM.PVC 760 GR. Ins un 20,580.00 411.60 0.0200
2,927 SOLDADURA PVC LIQUIDA 1/4 Ins un 58,310.00 174.93 0.0030
3,595 TUBO CONDUIT PVC 2 Ins m 25,567.00 25,567.00 1.0000
2,319 ACOM. TELFONOS INCRUSTADA 3 TUBO PVC 60,653.67m
15,515 ADAPTADOR TERMINAL PVC 3 Ins un 7,564.00 1,891.00 0.2500
4,709 CUADRILLA INSTAL. INTERNAS Ana hc 20,183.45 16,146.76 0.8000
13,598 HERRAMIENTA MENOR Esp % 40,982.21 4,098.22 10.0000
2,942 LIMPIADOR REM.PVC 760 GR. Ins un 20,580.00 102.90 0.0050
2,927 SOLDADURA PVC LIQUIDA 1/4 Ins un 58,310.00 291.55 0.0050
13,605 SUB-CONTRATO ELCTRICO Esp % 40,982.21 15,573.24 38.0000
3,600 TUBO CONDUIT PVC 3 Ins m 22,550.00 22,550.00 1.0000
4,752 ACOM.CABLE CU 3X2+1X4 AWG PVC 11/4 99,652.74m
15,472 ADAPTADOR TERMINAL PVC 11/4 Ins un 780.00 103.74 0.1330
865 ALAMBRE COBRE DESNUDO AWG 8 Ins m 3,600.00 3,600.00 1.0000
15,475 BORNA TERMINAL 2 AWG Ins un 2,245.00 942.90 0.4200
15,476 BORNA TERMINAL 4 AWG Ins un 5,240.00 733.60 0.1400
881 CABLE COBRE THW 2 AWG Ins m 14,600.00 43,800.00 3.0000
880 CABLE COBRE THW 4 AWG Ins m 10,245.00 10,757.25 1.0500
4,709 CUADRILLA INSTAL. INTERNAS Ana hc 20,183.45 30,275.18 1.5000
13,598 HERRAMIENTA MENOR Esp % 90,593.40 9,059.34 10.0000
2,942 LIMPIADOR REM.PVC 760 GR. Ins un 20,580.00 205.80 0.0100
2,944 SOLDADURA PVC 1/4 Ins un 58,310.00 174.93 0.0030
145 ACOMETIDA 1 3 NO. 10+12 101,548.68m
877 CABLE COBRE THW 10 AWG Ins m 2,840.00 8,520.00 3.0000
876 CABLE COBRE THW 12 AWG Ins m 2,210.00 2,210.00 1.0000
4,515 MANO DE OBRA BB Ins hc 18,139.00 54,417.00 3.0000
13,605 SUB-CONTRATO ELCTRICO Esp % 73,586.00 27,962.68 38.0000
12,066 TUBO CONDUIT PVC 1 Ins m 8,439.00 8,439.00 1.0000
146 ACOMETIDA 11/2 3 NO. 12+10 95,050.26m
876 CABLE COBRE THW 12 AWG Ins m 2,210.00 8,840.00 4.0000
4,515 MANO DE OBRA BB Ins hc 18,139.00 54,417.00 3.0000
13,605 SUB-CONTRATO ELCTRICO Esp % 68,877.00 26,173.26 38.0000
3,202 TUBO CONDUIT 1 1/2 Ins m 5,620.00 5,620.00 1.0000
116 ACOMETIDA 11/2 3 NO. 8+10 108,492.84m
877 CABLE COBRE THW 10 AWG Ins m 2,840.00 2,840.00 1.0000
878 CABLE COBRE THW 8 AWG Ins m 5,247.00 15,741.00 3.0000
4,515 MANO DE OBRA BB Ins hc 18,139.00 54,417.00 3.0000
13,605 SUB-CONTRATO ELCTRICO Esp % 78,618.00 29,874.84 38.0000
3,202 TUBO CONDUIT 1 1/2 Ins m 5,620.00 5,620.00 1.0000
130 ACOMETIDA 2 3 NO. 2+1 182,761.68m
-
Titulo Base de Datos
Fecha : 02/06/10
9Pgina :
ANALISIS DETALLADOS ALFABETICOS
Nombre Vr.Unitario Vr.TotalU.M. CantidadTipoCodigo
933 CABLE ALUMINIO AISLADO PVC 1 AWG Ins m 8,652.00 8,652.00 1.0000
881 CABLE COBRE THW 2 AWG Ins m 14,600.00 43,800.00 3.0000
4,515 MANO DE OBRA BB Ins hc 18,139.00 54,417.00 3.0000
13,605 SUB-CONTRATO ELCTRICO Esp % 132,436.00 50,325.68 38.0000
3,595 TUBO CONDUIT PVC 2 Ins m 25,567.00 25,567.00 1.0000
115 ACOMETIDA 3/4 3 NO.10+12 97,399.02m
877 CABLE COBRE THW 10 AWG Ins m 2,840.00 8,520.00 3.0000
876 CABLE COBRE THW 12 AWG Ins m 2,210.00 2,210.00 1.0000
4,515 MANO DE OBRA BB Ins hc 18,139.00 54,417.00 3.0000
13,605 SUB-CONTRATO ELCTRICO Esp % 70,579.00 26,820.02 38.0000
3,534 TUBO CONDUIT PVC 3/4 Ins m 5,432.00 5,432.00 1.0000
848 ACOMETIDA AREA 10 M/PVC 451,202.03un
3,583 ADAPTADOR TERMINAL CONDUIT 1 Ins un 740.00 2,220.00 3.0000
12,061 ADAPTADOR TERMINAL CONDUIT 1/2 Ins un 246.00 984.00 4.0000
867 ALAMBRE COBRE THW 10 AWG THHN/NN Ins m 2,840.00 53,676.00 18.9000
868 ALAMBRE COBRE THW 12 AWG THHN/NN Ins m 1,420.00 35,216.00 24.8000
13,461 CAJA 60 X 60 X 14CM Ins un 77,850.00 77,850.00 1.0000
4,515 MANO DE OBRA BB Ins hc 18,139.00 74,551.29 4.1100
13,605 SUB-CONTRATO ELCTRICO Esp % 326,957.99 124,244.04 38.0000
12,066 TUBO CONDUIT PVC 1 Ins m 8,439.00 53,165.70 6.3000
3,598 TUBO CONDUIT PVC 1/2 Ins m 4,650.00 29,295.00 6.3000
4,717 ACOMETIDA ALAMBRE CU 3X10+1X12 AWG,PVC
3/4
42,543.31m
12,062 ADAPTADOR TERMINAL CONDUIT 3/4 Ins un 327.00 43.49 0.1330
13,556 ALAMBRE COBRE 10 AWG THW/THWN Ins m 2,620.00 7,991.00 3.0500
7,186 ALAMBRE COBRE DESNUDO AWG 10 Ins m 2,320.00 2,320.00 1.0000
13,557 ALAMBRE COBRE THW 12 AWG Ins m 2,500.00 2,500.00 1.0000
4,709 CUADRILLA INSTAL. INTERNAS Ana hc 20,183.45 20,183.45 1.0000
13,598 HERRAMIENTA MENOR Esp % 38,675.74 3,867.57 10.0000
2,942 LIMPIADOR REM.PVC 760 GR. Ins un 20,580.00 205.80 0.0100
3,534 TUBO CONDUIT PVC 3/4 Ins m 5,432.00 5,432.00 1.0000
4,825 ACOMETIDA ANTENA TV, TUBO EMT 1 48,853.14un
15,473 ADAPTADOR TERMINAL EMT 1 Ins un 1,330.00 332.50 0.2500
955 CABLE BLINDADO RG-59U TV Ins m 1,452.00 1,452.00 1.0000
4,709 CUADRILLA INSTAL. INTERNAS Ana hc 20,183.45 8,073.38 0.4000
13,598 HERRAMIENTA MENOR Esp % 33,008.88 3,300.89 10.0000
13,605 SUB-CONTRATO ELCTRICO Esp % 33,008.88 12,543.37 38.0000
15,512 TUBO CONDUIT GALV. EMT 1 Ins un 22,950.00 22,950.00 1.0000
15,500 UNIN CONDUIT GALV. EMT , 3/4 Ins un 670.00 201.00 0.3000
2,308 ACOMETIDA ANTENA TV, TUBO PVC 1 26,822.44m
15,514 ADAPTADOR TERMINAL PVC 1 Ins un 320.00 80.00 0.2500
955 CABLE BLINDADO RG-59U TV Ins m 1,452.00 1,452.00 1.0000
-
Titulo Base de Datos
Fecha : 02/06/10
10Pgina :
ANALISIS DETALLADOS ALFABETICOS
Nombre Vr.Unitario Vr.TotalU.M. CantidadTipoCodigo
4,709 CUADRILLA INSTAL. INTERNAS Ana hc 20,183.45 8,073.38 0.4000
13,598 HERRAMIENTA MENOR Esp % 18,123.27 1,812.33 10.0000
2,942 LIMPIADOR REM.PVC 760 GR. Ins un 20,580.00 20.58 0.0010
2,927 SOLDADURA PVC LIQUIDA 1/4 Ins un 58,310.00 58.31 0.0010
13,605 SUB-CONTRATO ELCTRICO Esp % 18,123.27 6,886.84 38.0000
12,066 TUBO CONDUIT PVC 1 Ins m 8,439.00 8,439.00 1.0000
2,310 ACOMETIDA CN 1 ANTENA TV 21,583.20m
3,583 ADAPTADOR TERMINAL CONDUIT 1 Ins un 740.00 244.20 0.3300
5,107 HR. CUADRILLA OF+AY. ELCTRICO Ins hc 18,139.00 18,139.00 1.0000
3,205 TUBO CONDUIT GRIS 1 Ins m 3,200.00 3,200.00 1.0000
792 ACOMETIDA GALVANIZADA 1/2 5 M 428,118.44un
15,190 BUSHING GALVANIZADO 1 1/2X1/2 Ins un 11,000.00 11,000.00 1.0000
3,675 CHEQUE RED WHITE 1-1/2 Ins un 170,000.00 178,500.00 1.0500
3,299 CODO GALVANIZADO 1/2 Ins un 910.00 1,865.50 2.0500
4,515 MANO DE OBRA BB Ins hc 18,139.00 72,556.00 4.0000
3,674 REGISTRO RED WHITE TOYO 1/2 Ins un 21,900.00 22,995.00 1.0500
15,219 ROSCA PARA TUERCA 1/2 Ins un 1,200.00 4,800.00 4.0000
13,608 SUB-CONTRATO HIDRULICO Y SANITARIO Esp % 310,230.75 117,887.69 38.0000
3,293 TUBO GALVANIZADO 1/2 Ins m 3,595.00 18,514.25 5.1500
1,851 ACOMETIDA GAS UNIFAMILIAR 275,854.14un
3,501 CODO CALLE GALVANIZADO 1/2 Ins un 3,140.00 3,140.00 1.0000
8,134 CUADRILLA INSTALACIONES OF + AYUDANTE Ins hc 18,118.00 11,776.70 0.6500
1,021 ELEVADOR PARA GAS 1/2 Ins un 23,050.00 23,050.00 1.0000
2,839 MEDIDOR DE GAS 2.5 M3 Ins un 122,000.00 122,000.00 1.0000
987 REGULADOR GAS R-4E 4 M3 Ins un 35,000.00 35,000.00 1.0000
2,940 SOLDADURA ESTAO DE PLATA 95,5 Ins lb 32,800.00 1,968.00 0.0600
3,528 TEE REDUCIDA POLIETILENO 1X1/2 Ins un 27,700.00 27,700.00 1.0000
15,145 TUBERA GALVANIZADA SCH 40 1 1/2 Ins ml 28,033.00 28,033.00 1.0000
1,848 TUBERA POLIETILENO 1/2 Ana m 4,282.44 4,282.44 1.0000
3,304 UNIVERSAL GALVANIZADA 1/2 Ins un 5,100.00 5,100.00 1.0000
991 VLVULA DE BOLA PARA MEDIDOR 1/2 Ins un 13,804.00 13,804.00 1.0000
846 ACOMETIDA GRAL. 3 X 2 X 0 109,705.86m
919 CABLE ALUMINIO DESNUDO.AM 2/0 Ins m 8,360.00 25,080.00 3.0000
4,515 MANO DE OBRA BB Ins hc 18,139.00 54,417.00 3.0000
13,605 SUB-CONTRATO ELCTRICO Esp % 79,497.00 30,208.86 38.0000
770 ACOMETIDA PVC 1/2 5 M 378,137.18un
15,162 BUJE ROSCADO PVCP 1 1/2X1/2 Ins un 2,961.00 2,961.00 1.0000
3,675 CHEQUE RED WHITE 1-1/2 Ins un 170,000.00 178,500.00 1.0500
3,929 CODO 90 PRESIN PVC 1/2 Ins un 421.00 863.05 2.0500
4,515 MANO DE OBRA BB Ins hc 18,139.00 54,417.00 3.0000
3,674 REGISTRO RED WHITE TOYO 1/2 Ins un 21,900.00 22,995.00 1.0500
2,927 SOLDADURA PVC LIQUIDA 1/4 Ins un 58,310.00 2,915.50 0.0500
-
Titulo Base de Datos
Fecha : 02/06/10
11Pgina :
ANALISIS DETALLADOS ALFABETICOS
Nombre Vr.Unitario Vr.TotalU.M. CantidadTipoCodigo
13,608 SUB-CONTRATO HIDRULICO Y SANITARIO Esp % 274,012.45 104,124.73 38.0000
3,928 TUBO PRESIN RDE 9 PVC 1/2 Ins m 2,206.00 11,360.90 5.1500
771 ACOMETIDA PVC 3/4 5 M 417,801.14un
3,675 CHEQUE RED WHITE 1-1/2 Ins un 170,000.00 178,500.00 1.0500
3,392 CODO 45 COBRE CXC 1/2 Ins un 1,450.00 2,972.50 2.0500
3,931 CODO 90 PRESIN PVC 3/4 Ins un 602.00 1,234.10 2.0500
4,515 MANO DE OBRA BB Ins hc 18,139.00 54,417.00 3.0000
3,676 REGISTRO RED WHITE TOYO 3/4 Ins un 44,892.00 47,136.60 1.0500
2,927 SOLDADURA PVC LIQUIDA 1/4 Ins un 58,310.00 2,915.50 0.0500
13,608 SUB-CONTRATO HIDRULICO Y SANITARIO Esp % 302,754.45 115,046.69 38.0000
3,930 TUBO PRESIN RDE 11 PVC 3/4 Ins m 3,025.00 15,578.75 5.1500
2,318 ACOMETIDA TELFONOS SUSPENDIDA 3 TUBO
PVC
74,457.50m
15,515 ADAPTADOR TERMINAL PVC 3 Ins un 7,564.00 1,891.00 0.2500
2,477 NGULO HIERRO 1-1/2 X 1/4 Ins m 18,456.00 9,228.00 0.5000
1,632 ARANDELA GALVANIZADA 1/2 Ins un 113.00 113.00 1.0000
1,900 BARRA G-60 1/2 6M Ins kg 13,000.00 7,800.00 0.6000
4,709 CUADRILLA INSTAL. INTERNAS Ana hc 20,183.45 10,091.73 0.5000
13,598 HERRAMIENTA MENOR Esp % 52,068.18 2,603.41 5.0000
2,942 LIMPIADOR REM.PVC 760 GR. Ins un 20,580.00 102.90 0.0050
2,927 SOLDADURA PVC LIQUIDA 1/4 Ins un 58,310.00 291.55 0.0050
13,605 SUB-CONTRATO ELCTRICO Esp % 52,068.18 19,785.91 38.0000
3,600 TUBO CONDUIT PVC 3 Ins m 22,550.00 22,550.00 1.0000
4,827 ACONDICIONAMIENTO SUBESTACIN DE LOCAL 3,593,023.41un
1,711 AISLADOR DE PIN 15 KV Ins un 16,670.00 150,030.00 9.0000
883 CABLE COBRE THW 2/0 AWG Ins m 32,485.00 194,910.00 6.0000
15,517 CONECTOR VARILLA CW 3/4 Ins un 6,926.00 20,778.00 3.0000
4,710 CUADRILLA MONTAJE EQUIPOS Ana hc 46,812.91 561,754.92 12.0000
2,040 CUCHILLA MONOPOLAR 400 A 15K Ins un 665,730.00 1,997,190.00 3.0000
13,598 HERRAMIENTA MENOR Esp % 3,266,384.92 326,638.49 10.0000
15,518 INTERRUPTOR AUT.TRIP. ATORN. 60A Ins un 54,980.00 164,940.00 3.0000
1,633 PERNO 5/8 X 14 Ins un 5,090.00 40,720.00 8.0000
2,457 PLATINA HIERRO 2 X 1/4 6M Ins m 4,600.00 13,800.00 3.0000
1,732 PORTA AISLADOR 1 PUESTO Ins un 5,258.00 47,322.00 9.0000
1,763 VARILLA CW 5/8 X 2.40 Ins un 24,980.00 74,940.00 3.0000
610 ACUARELA 20X20 50,705.00m
3,684 AGUA Ins lt 20.00 57.00 2.8500
13,591 ARENA LAVADA (ARROYO DE PIEDRA) Ins m 39,420.00 788.40 0.0200
829 CEMENTO BLANCO Ins kg 1,300.00 663.00 0.5100
804 CEMENTO GRIS Ins kg 520.00 3,260.40 6.2700
1,407 CERMICA PARED LOFT BLANCO Ins un 30,990.00 31,919.70 1.0300
4,489 MANO DE OBRA AA Ins hc 16,490.00 14,016.50 0.8500
4,654 ADAPTADOR MACHO COBRE 1 8,650.24un
-
Titulo Base de Datos
Fecha : 02/06/10
12Pgina :
ANALISIS DETALLADOS ALFABETICOS
Nombre Vr.Unitario Vr.TotalU.M. CantidadTipoCodigo
3,386 ADAPTADOR MACHO COBRE 1 Ins un 5,800.00 5,800.00 1.0000
8,134 CUADRILLA INSTALACIONES OF + AYUDANTE Ins hc 18,118.00 1,449.44 0.0800
15,151 LIMPIADOR FUNDENTE COBRE Ins lb 18,620.00 744.80 0.0400
2,940 SOLDADURA ESTAO DE PLATA 95,5 Ins lb 32,800.00 656.00 0.0200
4,655 ADAPTADOR MACHO COBRE 1 1/2 6,359.30un
15,129 ADAPTADOR MACHO COBRE 1 1/2 Ins un 840.00 840.00 1.0000
8,134 CUADRILLA INSTALACIONES OF + AYUDANTE Ins hc 18,118.00 2,717.70 0.1500
15,151 LIMPIADOR FUNDENTE COBRE Ins lb 18,620.00 1,489.60 0.0800
2,940 SOLDADURA ESTAO DE PLATA 95,5 Ins lb 32,800.00 1,312.00 0.0400
1,831 ADAPTADOR MACHO COBRE 1/2 4,487.94un
3,398 ADAPTADOR MACHO COBRE 1/2 Ins un 1,590.00 1,637.70 1.0300
8,134 CUADRILLA INSTALACIONES OF + AYUDANTE Ins hc 18,118.00 1,449.44 0.0800
15,151 LIMPIADOR FUNDENTE COBRE Ins lb 18,620.00 744.80 0.0400
2,940 SOLDADURA ESTAO DE PLATA 95,5 Ins lb 32,800.00 656.00 0.0200
4,656 ADAPTADOR MACHO GALVANIZADO 1/2 4,627.64un
15,132 ADAPTADOR MACHO GALVANIZADO 1/2 Ins un 609.00 609.00 1.0000
8,134 CUADRILLA INSTALACIONES OF + AYUDANTE Ins hc 18,118.00 1,449.44 0.0800
15,152 SELLANTE ACERO TRABA QUIMICA ANAEROBICA
.55 GR
Ins un 64,230.00 2,569.20 0.0400
589 ADOQUN CONCRETO 6 CM 37,135.40m
2,899 ADOQUN CONCRETO 10X6X20 Ins un 396.00 19,800.00 50.0000
3,684 AGUA Ins lt 20.00 57.00 2.8500
13,591 ARENA LAVADA (ARROYO DE PIEDRA) Ins m 39,420.00 788.40 0.0200
4,489 MANO DE OBRA AA Ins hc 16,490.00 16,490.00 1.0000
591 ADOQUN CONCRETO 8 CM 41,085.40m
2,900 ADOQUN CONCRETO 10X8X20 Ins un 475.00 23,750.00 50.0000
3,684 AGUA Ins lt 20.00 57.00 2.8500
13,591 ARENA LAVADA (ARROYO DE PIEDRA) Ins m 39,420.00 788.40 0.0200
4,489 MANO DE OBRA AA Ins hc 16,490.00 16,490.00 1.0000
3,945 ADOQUN DE GRES 39,268.30m
2,905 ADOQUN ESPAOL 20X10 SANTAF Ins un 535.00 27,820.00 52.0000
13,586 ARENA DE REVOQUE (AMARILLA) Ins m 20,000.00 400.00 0.0200
8,132 CUADRILLA ALBAILERA OF + AYUDANTE Ins hc 16,490.00 11,048.30 0.6700
593 ADOQUN GRES PEATONAL 43,188.90m
3,684 AGUA Ins lt 20.00 57.00 2.8500
13,591 ARENA LAVADA (ARROYO DE PIEDRA) Ins m 39,420.00 788.40 0.0200
13,381 COLOR MINERAL Ins kg 9,700.00 9,991.00 1.0300
-
Titulo Base de Datos
Fecha : 02/06/10
13Pgina :
ANALISIS DETALLADOS ALFABETICOS
Nombre Vr.Unitario Vr.TotalU.M. CantidadTipoCodigo
2,902 LADRILLO10X20X3.5 TONO NATURAL Ins m 14,600.00 15,038.00 1.0300
4,489 MANO DE OBRA AA Ins hc 16,490.00 17,314.50 1.0500
594 ADOQUN GRES VEHICULAR 43,616.70m
3,684 AGUA Ins lt 20.00 90.60 4.5300
13,591 ARENA LAVADA (ARROYO DE PIEDRA) Ins m 39,420.00 1,182.60 0.0300
13,381 COLOR MINERAL Ins kg 9,700.00 9,991.00 1.0300
2,902 LADRILLO10X20X3.5 TONO NATURAL Ins m 14,600.00 15,038.00 1.0300
4,489 MANO DE OBRA AA Ins hc 16,490.00 17,314.50 1.0500
443 AFINADO CUBIERTAS PLANAS (E=0.03) 21,675.64m
4,489 MANO DE OBRA AA Ins hc 16,490.00 11,543.00 0.7000
1,540 MORTERO 1:4 Ana m 253,316.00 10,132.64 0.0400
2,524 AISLADOR DE PIN ANSI 52-1 25,691.63un
1,727 AISLADOR DE PIN ANSI 52-1 Ins un 17,350.00 17,350.00 1.0000
5,107 HR. CUADRILLA OF+AY. ELCTRICO Ins hc 18,139.00 3,083.63 0.1700
1,732 PORTA AISLADOR 1 PUESTO Ins un 5,258.00 5,258.00 1.0000
2,522 AISLADOR DE PIN ANSI 55-1 12,119.41jgo
1,750 AISLADOR DE PIN ANSI 55-2 Ins un 3,415.00 3,415.00 1.0000
5,107 HR. CUADRILLA OF+AY. ELCTRICO Ins hc 18,139.00 3,446.41 0.1900
1,732 PORTA AISLADOR 1 PUESTO Ins un 5,258.00 5,258.00 1.0000
2,523 AISLADOR SUSP.ANSI 52-1 23,156.63un
1,720 AISLADOR SUSPENSIN ANSI 52-1 Ins un 20,073.00 20,073.00 1.0000
5,107 HR. CUADRILLA OF+AY. ELCTRICO Ins hc 18,139.00 3,083.63 0.1700
2,184 ALAMBRE CU DESNUDO NO. 8 AWG 6,822.21m
865 ALAMBRE COBRE DESNUDO AWG 8 Ins m 3,600.00 3,780.00 1.0500
4,709 CUADRILLA INSTAL. INTERNAS Ana hc 20,183.45 2,422.01 0.1200
13,598 HERRAMIENTA MENOR Esp % 6,202.01 620.20 10.0000
2,183 ALAMBRE CU DESNUDO NO.10 AWG 5,056.35m
867 ALAMBRE COBRE THW 10 AWG THHN/NN Ins m 2,840.00 2,982.00 1.0500
4,709 CUADRILLA INSTAL. INTERNAS Ana hc 20,183.45 1,614.68 0.0800
13,598 HERRAMIENTA MENOR Esp % 4,596.68 459.67 10.0000
2,186 ALAMBRE CU DESNUDO NO.12 AWG 3,543.30m
13,555 ALAMBRE COBRE DESNUDO AWG 12 Ins m 1,530.00 1,606.50 1.0500
4,709 CUADRILLA INSTAL. INTERNAS Ana hc 20,183.45 1,614.68 0.0800
13,598 HERRAMIENTA MENOR Esp % 3,221.18 322.12 10.0000
213 ALFAJA LADRILLO ESTRUCTURAL 31,378.54m
-
Titulo Base de Datos
Fecha : 02/06/10
14Pgina :
ANALISIS DETALLADOS ALFABETICOS
Nombre Vr.Unitario Vr.TotalU.M. CantidadTipoCodigo
3,684 AGUA Ins lt 20.00 30.00 1.5000
804 CEMENTO GRIS Ins kg 520.00 1,461.20 2.8100
13,738 LADRILLO PORTANTE PRENSADO Ins un 1,450.00 16,240.00 11.2000
4,489 MANO DE OBRA AA Ins hc 16,490.00 12,697.30 0.7700
12,116 SIKA-2 (5.5 KG) Ins kg 10,556.00 950.04 0.0900
223 ALFAJAS CONCRETO .15 22,500.42m
1,870 ALAMBRE NEGRO NO.18 (RECOCIDO) Ins kg 3,016.00 60.32 0.0200
13,586 ARENA DE REVOQUE (AMARILLA) Ins m 20,000.00 200.00 0.0100
804 CEMENTO GRIS Ins kg 520.00 369.20 0.7100
769 CONCRETO CORRIENTE GRAVA COMN 2500 PSI Ins m 275,000.00 5,500.00 0.0200
13,786 DURMIENTE 3 M Ins m 3,800.00 1,368.00 0.3600
1,903 HIERRO FIG G-60 1/2 Ins kg 2,320.00 1,693.60 0.7300
4,489 MANO DE OBRA AA Ins hc 16,490.00 12,697.30 0.7700
2,241 TABLN CATIVO 2X2X15 Ins m 3,400.00 612.00 0.1800
224 ALFAJAS CONCRETO .25 36,928.38m
1,870 ALAMBRE NEGRO NO.18 (RECOCIDO) Ins kg 3,016.00 90.48 0.0300
13,586 ARENA DE REVOQUE (AMARILLA) Ins m 20,000.00 200.00 0.0100
804 CEMENTO GRIS Ins kg 520.00 618.80 1.1900
769 CONCRETO CORRIENTE GRAVA COMN 2500 PSI Ins m 275,000.00 5,500.00 0.0200
13,786 DURMIENTE 3 M Ins m 3,800.00 1,368.00 0.3600
1,903 HIERRO FIG G-60 1/2 Ins kg 2,320.00 2,320.00 1.0000
4,489 MANO DE OBRA AA Ins hc 16,490.00 26,219.10 1.5900
2,241 TABLN CATIVO 2X2X15 Ins m 3,400.00 612.00 0.1800
222 ALFAJAS EN TABLN 21,086.30m
3,684 AGUA Ins lt 20.00 12.00 0.6000
13,994 ALFAJA TOLETE -6 NATURAL Ins m 12,090.00 3,143.40 0.2600
13,586 ARENA DE REVOQUE (AMARILLA) Ins m 20,000.00 200.00 0.0100
804 CEMENTO GRIS Ins kg 520.00 483.60 0.9300
4,489 MANO DE OBRA AA Ins hc 16,490.00 12,697.30 0.7700
2,601 TABLN TONO NATURAL Ins m 17,500.00 4,550.00 0.2600
225 ALFAJAS LADRILLO PRENSADO 23,052.85m
3,684 AGUA Ins lt 20.00 28.40 1.4200
13,586 ARENA DE REVOQUE (AMARILLA) Ins m 20,000.00 200.00 0.0100
804 CEMENTO GRIS Ins kg 520.00 1,242.80 2.3900
4,489 MANO DE OBRA AA Ins hc 16,490.00 14,181.40 0.8600
2,130 TOLETE ESTRUCTURAL Ins un 575.00 7,400.25 12.8700
1,104 ALFOMBRA ALLEGRO 46,350.00m
13,571 ALFOMBRA ALFA TIPO BERBER Ins m 45,000.00 46,350.00 1.0300
1,105 ALFOMBRA KASMIR 37,080.00m
-
Titulo Base de Datos
Fecha : 02/06/10
15Pgina :
ANALISIS DETALLADOS ALFABETICOS
Nombre Vr.Unitario Vr.TotalU.M. CantidadTipoCodigo
13,569 ALFOMBRA ALFA POLIPROP AR Ins m 36,000.00 37,080.00 1.0300
1,108 ALFOMBRA MALAGA RESID. 21,650.00m
126 ALFOMBRA GUERRERO Ins m 21,650.00 21,650.00 1.0000
1,106 ALFOMBRA OLIMPIA 46,350.00m
13,571 ALFOMBRA ALFA TIPO BERBER Ins m 45,000.00 46,350.00 1.0300
4,468 ALFOMBRA SINFONA RESIDENCIAL 23,650.00m
113 ALFOMBRA DELTA-TAPISOL Ins m 23,650.00 23,650.00 1.0000
1,107 ALFOMBRA SPLENDOR 43,260.00m
118 ALFOMBRA ALFA NYLON Ins m 42,000.00 43,260.00 1.0300
1,100 ALFOMBRA TIPO ECONMICO 45,300.00m
113 ALFOMBRA DELTA-TAPISOL Ins m 23,650.00 23,650.00 1.0000
126 ALFOMBRA GUERRERO Ins m 21,650.00 21,650.00 1.0000
548 ALISTADO ENDURECIDO 29,278.00m
3,684 AGUA Ins lt 20.00 200.00 10.0000
13,591 ARENA LAVADA (ARROYO DE PIEDRA) Ins m 39,420.00 1,971.00 0.0500
804 CEMENTO GRIS Ins kg 520.00 9,880.00 19.0000
4,489 MANO DE OBRA AA Ins hc 16,490.00 11,543.00 0.7000
3,174 ROCKTOP ROJO Ins kg 1,624.00 5,684.00 3.5000
552 ALISTADO IMPERMEABILIZADO PISOS 0.04 31,927.58m
3,684 AGUA Ins lt 20.00 200.00 10.0000
13,591 ARENA LAVADA (ARROYO DE PIEDRA) Ins m 39,420.00 1,971.00 0.0500
804 CEMENTO GRIS Ins kg 520.00 9,880.00 19.0000
4,489 MANO DE OBRA AA Ins hc 16,490.00 7,420.50 0.4500
12,116 SIKA-2 (5.5 KG) Ins kg 10,556.00 12,456.08 1.1800
553 ALISTADO PARA LISTN 13,415.60m
3,684 AGUA Ins lt 20.00 11.00 0.5500
13,591 ARENA LAVADA (ARROYO DE PIEDRA) Ins m 39,420.00 394.20 0.0100
804 CEMENTO GRIS Ins kg 520.00 634.40 1.2200
13,234 LISTON MONTERREY Ins m 1,500.00 4,500.00 3.0000
13,215 MALLA CON VENA 0.53X2.40 Ins un 6,400.00 1,280.00 0.2000
4,489 MANO DE OBRA AA Ins hc 16,490.00 6,596.00 0.4000
550 ALISTADO PISOS 0.04 18,647.00m
3,684 AGUA Ins lt 20.00 200.00 10.0000
13,591 ARENA LAVADA (ARROYO DE PIEDRA) Ins m 39,420.00 1,971.00 0.0500
-
Titulo Base de Datos
Fecha : 02/06/10
16Pgina :
ANALISIS DETALLADOS ALFABETICOS
Nombre Vr.Unitario Vr.TotalU.M. CantidadTipoCodigo
804 CEMENTO GRIS Ins kg 520.00 9,880.00 19.0000
4,489 MANO DE OBRA AA Ins hc 16,490.00 6,596.00 0.4000
554 ALISTADO TERRAZAS 0.08 50,715.64m
3,684 AGUA Ins lt 20.00 296.60 14.8300
13,591 ARENA LAVADA (ARROYO DE PIEDRA) Ins m 39,420.00 3,942.00 0.1000
804 CEMENTO GRIS Ins kg 520.00 12,937.60 24.8800
4,489 MANO DE OBRA AA Ins hc 16,490.00 9,894.00 0.6000
12,116 SIKA-2 (5.5 KG) Ins kg 10,556.00 23,645.44 2.2400
2,703 ALMACENISTA 1,820,002.00ms
6,937 ALMACENISTA CON PRESTACIONES (1.8) Ins ms 1,820,002.00 1,820,002.00 1.0000
2,751 ANDAMIO TUBULAR SECCIN 11,800.00sm
4,008 ANDAMIO MET. TUB. CAL 116 11/4 SECC. 1.50X1.50 Ins sm 11,800.00 11,800.00 1.0000
2,750 ANDAMIOS COLGANTES 60,320.00ms
4,016 ANDAMIO COLGANTE Ins ms 60,320.00 60,320.00 1.0000
4,144 ANDN ADOQUN DE GRES 58,057.93m
4,099 ACARREO A DISTANCIA MAYOR A 2 KM Ana un 30,398.84 5,167.80 0.1700
3,945 ADOQUN DE GRES Ana m 39,268.30 39,268.30 1.0000
3,210 BORDILLO PREFABRICADO A-80 Ana m 30,295.20 6,059.04 0.2000
1 DESCAPOTE Ana m 21,908.44 4,381.69 0.2000
4,101 EXCAVACIN MECNICA P/SUBRASANTE Ana m 12,396.69 2,603.30 0.2100
3,007 REPLANTEO GENERAL Ana m 577.80 577.80 1.0000
4,452 ANDN CONCRETO 2500 EN SITIO 0.08 79,663.91m
4,099 ACARREO A DISTANCIA MAYOR A 2 KM Ana un 30,398.84 8,207.69 0.2700
3,210 BORDILLO PREFABRICADO A-80 Ana m 30,295.20 14,541.70 0.4800
3,817 CONCRETO 1:2:3 ELABORADO EN OBRA Ana m 265,664.20 23,909.78 0.0900
8,132 CUADRILLA ALBAILERA OF + AYUDANTE Ins hc 16,490.00 7,915.20 0.4800
1 DESCAPOTE Ana m 21,908.44 21,908.44 1.0000
4,101 EXCAVACIN MECNICA P/SUBRASANTE Ana m 12,396.69 2,603.30 0.2100
3,007 REPLANTEO GENERAL Ana m 577.80 577.80 1.0000
4,298 ANDN CONCRETO 2500 PSI SITIO 79,663.91m
4,099 ACARREO A DISTANCIA MAYOR A 2 KM Ana un 30,398.84 8,207.69 0.2700
3,210 BORDILLO PREFABRICADO A-80 Ana m 30,295.20 14,541.70 0.4800
3,817 CONCRETO 1:2:3 ELABORADO EN OBRA Ana m 265,664.20 23,909.78 0.0900
8,132 CUADRILLA ALBAILERA OF + AYUDANTE Ins hc 16,490.00 7,915.20 0.4800
1 DESCAPOTE Ana m 21,908.44 21,908.44 1.0000
4,101 EXCAVACIN MECNICA P/SUBRASANTE Ana m 12,396.69 2,603.30 0.2100
3,007 REPLANTEO GENERAL Ana m 577.80 577.80 1.0000
-
Titulo Base de Datos
Fecha : 02/06/10
17Pgina :
ANALISIS DETALLADOS ALFABETICOS
Nombre Vr.Unitario Vr.TotalU.M. CantidadTipoCodigo
4,145 ANDN CONCRETO 3500 PSI EN SITIO 80,664.71m
4,099 ACARREO A DISTANCIA MAYOR A 2 KM Ana un 30,398.84 8,207.69 0.2700
3,210 BORDILLO PREFABRICADO A-80 Ana m 30,295.20 14,541.70 0.4800
3,139 CONCRETO 1:2:2,5 ELABORADO EN OBRA Ana m 276,784.20 24,910.58 0.0900
8,132 CUADRILLA ALBAILERA OF + AYUDANTE Ins hc 16,490.00 7,915.20 0.4800
1 DESCAPOTE Ana m 21,908.44 21,908.44 1.0000
4,101 EXCAVACIN MECNICA P/SUBRASANTE Ana m 12,396.69 2,603.30 0.2100
3,007 REPLANTEO GENERAL Ana m 577.80 577.80 1.0000
4,303 ANDN CONCRETO 3500 PSI EN SITIO 0.08 80,664.71m
4,099 ACARREO A DISTANCIA MAYOR A 2 KM Ana un 30,398.84 8,207.69 0.2700
3,210 BORDILLO PREFABRICADO A-80 Ana m 30,295.20 14,541.70 0.4800
3,139 CONCRETO 1:2:2,5 ELABORADO EN OBRA Ana m 276,784.20 24,910.58 0.0900
8,132 CUADRILLA ALBAILERA OF + AYUDANTE Ins hc 16,490.00 7,915.20 0.4800
1 DESCAPOTE Ana m 21,908.44 21,908.44 1.0000
4,101 EXCAVACIN MECNICA P/SUBRASANTE Ana m 12,396.69 2,603.30 0.2100
3,007 REPLANTEO GENERAL Ana m 577.80 577.80 1.0000
2,266 ANDN CONCRETO E/ 0.10 38,495.00m
769 CONCRETO CORRIENTE GRAVA COMN 2500 PSI Ins m 275,000.00 30,250.00 0.1100
4,489 MANO DE OBRA AA Ins hc 16,490.00 8,245.00 0.5000
2,425 ANDN CONCRETO E/0.08 165,216.29m
769 CONCRETO CORRIENTE GRAVA COMN 2500 PSI Ins m 275,000.00 38,500.00 0.1400
2,857 CUADRILLA REPAVIMENTACIN Ana d 335,425.31 111,696.63 0.3330
13,598 HERRAMIENTA MENOR Esp % 150,196.63 15,019.66 10.0000
2,426 ANDN CONCRETO E/0.10 195,987.13m
769 CONCRETO CORRIENTE GRAVA COMN 2500 PSI Ins m 275,000.00 44,000.00 0.1600
2,857 CUADRILLA REPAVIMENTACIN Ana d 335,425.31 134,170.12 0.4000
13,598 HERRAMIENTA MENOR Esp % 178,170.12 17,817.01 10.0000
241 ANDN EN CONCRETO(H/0.10) 59,968.50m
13,544 BASE GRANULAR B/QUILLA. Ins m 65,000.00 19,500.00 0.3000
769 CONCRETO CORRIENTE GRAVA COMN 2500 PSI Ins m 275,000.00 27,500.00 0.1000
69 EXCAVACIN MANUAL Ana m 32,009.00 12,803.60 0.4000
4,489 MANO DE OBRA AA Ins hc 16,490.00 164.90 0.0100
1,405 ANTENA COMUNAL TV 111,900.00un
716 ANTENA EXTERNA TV 10 ELEMENTOS Ins un 111,900.00 111,900.00 1.0000
2,315 ANTENA EXTERNA TV 225,355.01un
716 ANTENA EXTERNA TV 10 ELEMENTOS Ins un 111,900.00 111,900.00 1.0000
4,709 CUADRILLA INSTAL. INTERNAS Ana hc 20,183.45 40,366.90 2.0000
-
Titulo Base de Datos
Fecha : 02/06/10
18Pgina :
ANALISIS DETALLADOS ALFABETICOS
Nombre Vr.Unitario Vr.TotalU.M. CantidadTipoCodigo
13,598 HERRAMIENTA MENOR Esp % 152,266.90 15,226.69 10.0000
13,605 SUB-CONTRATO ELCTRICO Esp % 152,266.90 57,861.42 38.0000
2,759 ANTEOJOS DE SEGURIDAD 6,420.00un
1,592 ANTEOJO DE SEGURIDAD SENCILLO Ins un 6,420.00 6,420.00 1.0000
1,050 ANTI HUMEDAD FACHADA 9,599.58m
4,489 MANO DE OBRA AA Ins hc 16,490.00 4,947.00 0.3000
2,660 SIKA TRANSPARENTE 10 (16 KG) Ins kg 11,156.00 1,673.40 0.1500
13,611 SUB-CONTRATO PINTURA Esp % 6,620.40 2,979.18 45.0000
1,057 ANTICORROSIVO SOBRE LMINA LINEAL 7,158.95m
2,502 ANTICORROSIVO ROJO CLARO Ins gl 31,724.00 317.24 0.0100
2,533 DISOLVENTE THINNER Ins gl 13,500.00 135.00 0.0100
5,066 MANO DE OBRA CC Ins hc 18,963.00 3,602.97 0.1900
1,624 PABMERIL PLIEGO 9 X 11 Ins un 1,400.00 882.00 0.6300
13,611 SUB-CONTRATO PINTURA Esp % 4,937.21 2,221.74 45.0000
1,058 ANTICORROSIVO SOBRE LMINA LLENA 12,781.04m
2,502 ANTICORROSIVO ROJO CLARO Ins gl 31,724.00 951.72 0.0300
2,533 DISOLVENTE THINNER Ins gl 13,500.00 135.00 0.0100
5,066 MANO DE OBRA CC Ins hc 18,963.00 6,257.79 0.3300
1,624 PABMERIL PLIEGO 9 X 11 Ins un 1,400.00 1,470.00 1.0500
13,611 SUB-CONTRATO PINTURA Esp % 8,814.51 3,966.53 45.0000
496 APLIQUE YESO 45,260.00m
705 APLIQUE DE LUZ Ins un 45,260.00 45,260.00 1.0000
479 ARMADURA MADERA Y MALLA 36,382.00m
13,230 LISTON ABARCO 3 M Ins m 7,200.00 15,552.00 2.1600
13,206 MALLA CON VENA 0.60X2.00 Ins un 3,500.00 2,555.00 0.7300
4,489 MANO DE OBRA AA Ins hc 16,490.00 18,139.00 1.1000
3,797 PUNTILLA CON CABEZA 2 Ins lb 3,400.00 136.00 0.0400
2,221 ARMARIO PARA 12 MEDIDORES 1,609,007.18un
2,966 ARMARIO PARA 12 MEDIDORES Ins un 1,382,000.00 1,382,000.00 1.0000
4,709 CUADRILLA INSTAL. INTERNAS Ana hc 20,183.45 80,733.80 4.0000
13,598 HERRAMIENTA MENOR Esp % 1,462,733.80 146,273.38 10.0000
2,224 ARMARIO PARA 21 MEDIDORES 3,680,234.36un
13,520 ARMARIO PARA 21 MEDIDORES Ins un 3,184,200.00 3,184,200.00 1.0000
4,709 CUADRILLA INSTAL. INTERNAS Ana hc 20,183.45 161,467.60 8.0000
13,598 HERRAMIENTA MENOR Esp % 3,345,667.60 334,566.76 10.0000
-
Titulo Base de Datos
Fecha : 02/06/10
19Pgina :
ANALISIS DETALLADOS ALFABETICOS
Nombre Vr.Unitario Vr.TotalU.M. CantidadTipoCodigo
1,399 ASCENSOR 6 PARADAS 64,645,870.00un
347 ASCENSOR TL8 5 PARADAS Ins un 64,645,870.00 64,645,870.00 1.0000
260 ASEO GENERAL 3,542.00m
5,123 ASEO GENERAL - 3 HS SAL. MNIMO Ins m 3,542.00 3,542.00 1.0000
2,706 AYUDANTES ADMINISTRACIN 1,213,335.00ms
6,940 AYUDANTE ALBAIL CON PREST (1.2) Ins ms 1,213,335.00 1,213,335.00 1.0000
782 BAJANTE AGUAS LLUVIAS PVC 3 23,193.47m
3,653 CODO 90 1/4 CXC SANITARIO 3 Ins un 3,901.00 234.06 0.0600
4,515 MANO DE OBRA BB Ins hc 18,139.00 9,069.50 0.5000
13,608 SUB-CONTRATO HIDRULICO Y SANITARIO Esp % 16,806.86 6,386.61 38.0000
3,655 TUBO PVC A.LL. 3 Ins m 7,146.00 7,503.30 1.0500
783 BAJANTE AGUAS LLUVIAS PVC 4 18,011.79m
3,654 CODO 90 1/4 CXC SANITARIO 4 Ins un 6,722.00 403.32 0.0600
4,515 MANO DE OBRA BB Ins hc 18,139.00 9,976.45 0.5500
13,608 SUB-CONTRATO HIDRULICO Y SANITARIO Esp % 13,052.02 4,959.77 38.0000
12,047 TUBO PVC A.LL. 4 Ins m 2,545.00 2,672.25 1.0500
785 BAJANTE AGUAS NEGRAS PVC 3 28,718.50m
3,653 CODO 90 1/4 CXC SANITARIO 3 Ins un 3,901.00 234.06 0.0600
4,515 MANO DE OBRA BB Ins hc 18,139.00 9,069.50 0.5000
13,608 SUB-CONTRATO HIDRULICO Y SANITARIO Esp % 20,810.51 7,907.99 38.0000
12,048 TUBO PVC SANITARIO 3 Ins m 10,959.00 11,506.95 1.0500
786 BAJANTE AGUAS NEGRAS PVC 4 36,454.66m
3,654 CODO 90 1/4 CXC SANITARIO 4 Ins un 6,722.00 403.32 0.0600
4,515 MANO DE OBRA BB Ins hc 18,139.00 9,976.45 0.5500
13,608 SUB-CONTRATO HIDRULICO Y SANITARIO Esp % 26,416.42 10,038.24 38.0000
12,049 TUBO PVC SANITARIO 4 Ins m 15,273.00 16,036.65 1.0500
787 BAJANTE AGUAS NEGRAS PVC 6 69,250.35m
3,609 CODO 90 1/4 CXC SANITARIO 6 Ins un 57,415.00 3,444.90 0.0600
4,515 MANO DE OBRA BB Ins hc 18,139.00 16,143.71 0.8900
13,608 SUB-CONTRATO HIDRULICO Y SANITARIO Esp % 50,181.41 19,068.94 38.0000
3,657 TUBO PVC SANITARIO 6 Ins m 29,136.00 30,592.80 1.0500
440 BAJANTE LATN 12 X 6 40,539.60m
2,144 LMINA GALVANIZADA .22 Ins un 47,360.00 9,472.00 0.2000
2,932 SOLDADURA ESTAO PARA COBRE Ins un 43,500.00 13,050.00 0.3000
13,604 SUB-CONTRATO DE ORNAMENTACIN Esp % 22,522.00 18,017.60 80.0000
-
Titulo Base de Datos
Fecha : 02/06/10
20Pgina :
ANALISIS DETALLADOS ALFABETICOS
Nombre Vr.Unitario Vr.TotalU.M. CantidadTipoCodigo
810 BAJANTE LATN 12X 6 40,952.32m
2,144 LMINA GALVANIZADA .22 Ins un 47,360.00 9,472.00 0.2000
2,932 SOLDADURA ESTAO PARA COBRE Ins un 43,500.00 6,525.00 0.1500
13,604 SUB-CONTRATO DE ORNAMENTACIN Esp % 15,997.00 12,797.60 80.0000
13,608 SUB-CONTRATO HIDRULICO Y SANITARIO Esp % 15,997.00 6,078.86 38.0000
13,609 SUB-CONTRATO INSTALACIN Esp % 15,997.00 6,078.86 38.0000
424 BAJANTE PAVCO 43,439.30m
14,553 BAJANTE REF. 0350001003 Ins ml 18,480.00 19,404.00 1.0500
480 CODO BAJANTE 45 BLANCO Ins un 4,425.00 265.50 0.0600
4,515 MANO DE OBRA BB Ins hc 18,139.00 14,511.20 0.8000
14,554 SOPORTE DE BAJANTE REF. 2290400211 Ins un 1,655.00 4,534.70 2.7400
3,762 TORNILLO PARA MADERA 1 NO. 6 Ins un 20.00 20.00 1.0000
14,552 UNIN DE CANAL Ins un 13,835.00 4,703.90 0.3400
864 BALA ALUMINIO NO.12 28,040.90un
4,013 BALA ALUMINIO NO.12 Ins un 15,400.00 15,400.00 1.0000
4,709 CUADRILLA INSTAL. INTERNAS Ana hc 20,183.45 10,091.73 0.5000
13,598 HERRAMIENTA MENOR Esp % 25,491.73 2,549.17 10.0000
167 BALA FLUORESCENTE 42,001.80un
4,080 BALA FLUORESCENTE D=13 CM Ins un 18,000.00 18,000.00 1.0000
4,709 CUADRILLA INSTAL. INTERNAS Ana hc 20,183.45 20,183.45 1.0000
13,598 HERRAMIENTA MENOR Esp % 38,183.45 3,818.35 10.0000
258 BALA INCANDESCENTE 100 W 42,001.80un
1,938 BALA INCANDESCENTE 2.9213D=11.5CM Ins un 18,000.00 18,000.00 1.0000
4,709 CUADRILLA INSTAL. INTERNAS Ana hc 20,183.45 20,183.45 1.0000
13,598 HERRAMIENTA MENOR Esp % 38,183.45 3,818.35 10.0000
1,824 BALA INCANDESCENTE 150W 36,451.35un
1,940 BALA INCANDESCENTE 2.9215D=13CM Ins un 18,000.00 18,000.00 1.0000
4,709 CUADRILLA INSTAL. INTERNAS Ana hc 20,183.45 15,137.59 0.7500
13,598 HERRAMIENTA MENOR Esp % 33,137.59 3,313.76 10.0000
1,823 BALA INCANDESCENTE 60 W 36,451.35un
1,939 BALA INCANDESCENTE 2.9212=D 11.5 CM Ins un 18,000.00 18,000.00 1.0000
4,709 CUADRILLA INSTAL. INTERNAS Ana hc 20,183.45 15,137.59 0.7500
13,598 HERRAMIENTA MENOR Esp % 33,137.59 3,313.76 10.0000
2,747 BALDES 5 GL 2,248.00un
1,818 BALDE PLSTICO NEGRO Ins un 2,248.00 2,248.00 1.0000
-
Titulo Base de Datos
Fecha : 02/06/10
21Pgina :
ANALISIS DETALLADOS ALFABETICOS
Nombre Vr.Unitario Vr.TotalU.M. CantidadTipoCodigo
596 BALDOSN DE GRANITO 33X33 75,257.40m
3,684 AGUA Ins lt 20.00 57.00 2.8500
13,591 ARENA LAVADA (ARROYO DE PIEDRA) Ins m 39,420.00 788.40 0.0200
2,907 BALDOSA ALFA L1 33 X 33 Ins m 52,570.00 54,147.10 1.0300
829 CEMENTO BLANCO Ins kg 1,300.00 1,339.00 1.0300
804 CEMENTO GRIS Ins kg 520.00 3,260.40 6.2700
4,489 MANO DE OBRA AA Ins hc 16,490.00 15,665.50 0.9500
597 BALDOSN GRANITO 20X20 53,472.90m
3,684 AGUA Ins lt 20.00 57.00 2.8500
13,591 ARENA LAVADA (ARROYO DE PIEDRA) Ins m 39,420.00 788.40 0.0200
829 CEMENTO BLANCO Ins kg 1,300.00 1,339.00 1.0300
804 CEMENTO GRIS Ins kg 520.00 3,260.40 6.2700
2,581 CERMICA PARED CHARLOTTE 20.5X30.5 Ins m 31,420.00 32,362.60 1.0300
4,489 MANO DE OBRA AA Ins hc 16,490.00 15,665.50 0.9500
3,138 BANCA EN CONCRETO M-40 91,731.22un
8,138 BANCA EN CONCRETO M-40 Ins un 67,000.00 67,000.00 1.0000
8,132 CUADRILLA ALBAILERA OF + AYUDANTE Ins hc 16,490.00 21,272.10 1.2900
8,137 MORTERO CONVENCIONAL 3000 PSI Ins m 345,912.00 3,459.12 0.0100
4,297 BANCA EN CONCRETO M-50 403,545.12un
8,113 BANCA EN CONCRETO M-30 Ins m 377,000.00 377,000.00 1.0000
8,132 CUADRILLA ALBAILERA OF + AYUDANTE Ins hc 16,490.00 23,086.00 1.4000
8,137 MORTERO CONVENCIONAL 3000 PSI Ins m 345,912.00 3,459.12 0.0100
361 BANDEJA TIPO ESCAL.30X80 78,596.24m
384 ACCESORIO T PARA BANDEJA T ESCALERA Ins un 38,200.00 5,730.00 0.1500
1,678 ANCLAJE AUTOPERFORANTE 1/2 Ins un 6,000.00 12,720.00 2.1200
13,540 BANDEJA PORTACABLE ESCALERA Ins un 24,520.00 32,366.40 1.3200
4,709 CUADRILLA INSTAL. INTERNAS Ana hc 20,183.45 10,697.23 0.5300
13,598 HERRAMIENTA MENOR Esp % 71,451.13 7,145.11 10.0000
391 SOPORTE PARA BANDEJA PORTACABLES Ins un 18,750.00 9,937.50 0.5300
1,241 BAERA FIBRA DE VIDRIO 781,617.00un
3,103 BAERA ESPAOLA 170X75X41 Ins un 658,192.00 658,192.00 1.0000
4,345 DESAGE AUTOMTICO PARA BAERA CR Ins un 82,200.00 82,200.00 1.0000
4,489 MANO DE OBRA AA Ins hc 16,490.00 41,225.00 2.5000
1,170 BAO NO. 2 / 4 AP. STILO 4,977,806.01un
709 CERMICA CORONA EGEO 20CM X 20CM Ana m 36,463.50 32,817.15 0.9000
576 CERRADURA SCHLAGE BAO A40S Ins un 31,204.00 31,204.00 1.0000
1,041 ESMALTE SOBRE MADERA LLENA Ana m 17,176.40 49,468.03 2.8800
3,741 ESPEJO CRISTAL BELGA 5MM Ins m 45,200.00 36,160.00 0.8000
1,033 ESTUCO Y VINILO 3 MANOS Ana m 10,275.35 36,991.26 3.6000
-
Titulo Base de Datos
Fecha : 02/06/10
22Pgina :
ANALISIS DETALLADOS ALFABETICOS
Nombre Vr.Unitario Vr.TotalU.M. CantidadTipoCodigo
1,171 INSTALACIN Y DOTACIN BAO NO.2 Ana un 2,587,015.58 2,587,015.58 1.0000
703 JUEGOS INCRUSTAR STILO Ana un 239,854.00 239,854.00 1.0000
686 OLIMPIA BRILLANTE BASE 20X20 Ana m 55,569.90 1,415,365.35 25.4700
1,119 PUERTAS DUCHAS POLIESTIR. Ana m 179,800.00 305,660.00 1.7000
915 PUERTAS MARCO Y HOJA Ana un 239,370.64 239,370.64 1.0000
2,831 REJILLA SOSCO 3X2 ACERO Ins un 3,900.00 3,900.00 1.0000
1,172 BAO NO. 3 / 3 AP. ACUACER 3,901,065.04un
709 CERMICA CORONA EGEO 20CM X 20CM Ana m 36,463.50 54,695.25 1.5000
576 CERRADURA SCHLAGE BAO A40S Ins un 31,204.00 31,204.00 1.0000
1,041 ESMALTE SOBRE MADERA LLENA Ana m 17,176.40 49,468.03 2.8800
3,741 ESPEJO CRISTAL BELGA 5MM Ins m 45,200.00 36,160.00 0.8000
1,033 ESTUCO Y VINILO 3 MANOS Ana m 10,275.35 24,660.84 2.4000
1,173 INSTALACIN Y DOTACIN BAO NO.3 Ana un 1,694,378.89 1,694,378.89 1.0000
702 JUEGOS INCRUSTAR Ana un 106,464.00 106,464.00 1.0000
686 OLIMPIA BRILLANTE BASE 20X20 Ana m 55,569.90 1,175,303.39 21.1500
1,119 PUERTAS DUCHAS POLIESTIR. Ana m 179,800.00 485,460.00 2.7000
915 PUERTAS MARCO Y HOJA Ana un 239,370.64 239,370.64 1.0000
2,831 REJILLA SOSCO 3X2 ACERO Ins un 3,900.00 3,900.00 1.0000
1,174 BAO NO. 4 / 3 AP. STILO 3,944,289.81un
709 CERMICA CORONA EGEO 20CM X 20CM Ana m 36,463.50 54,695.25 1.5000
576 CERRADURA SCHLAGE BAO A40S Ins un 31,204.00 31,204.00 1.0000
1,041 ESMALTE SOBRE MADERA LLENA Ana m 17,176.40 49,468.03 2.8800
3,741 ESPEJO CRISTAL BELGA 5MM Ins m 45,200.00 36,160.00 0.8000
1,033 ESTUCO Y VINILO 3 MANOS Ana m 10,275.35 24,660.84 2.4000
1,175 INSTALACIN Y DOTACIN BAO NO.4 Ana un 1,604,213.66 1,604,213.66 1.0000
703 JUEGOS INCRUSTAR STILO Ana un 239,854.00 239,854.00 1.0000
686 OLIMPIA BRILLANTE BASE 20X20 Ana m 55,569.90 1,175,303.39 21.1500
1,119 PUERTAS DUCHAS POLIESTIR. Ana m 179,800.00 485,460.00 2.7000
915 PUERTAS MARCO Y HOJA Ana un 239,370.64 239,370.64 1.0000
2,831 REJILLA SOSCO 3X2 ACERO Ins un 3,900.00 3,900.00 1.0000
1,176 BAO NO. 5 / 2 AP. ACUACER 3,172,304.97un
576 CERRADURA SCHLAGE BAO A40S Ins un 31,204.00 31,204.00 1.0000
1,041 ESMALTE SOBRE MADERA LLENA Ana m 17,176.40 49,468.03 2.8800
3,741 ESPEJO CRISTAL BELGA 5MM Ins m 45,200.00 36,160.00 0.8000
1,033 ESTUCO Y VINILO 3 MANOS Ana m 10,275.35 23,119.54 2.2500
1,177 INSTALACIN Y DOTACIN BAO NO.5 Ana un 1,396,952.20 1,396,952.20 1.0000
702 JUEGOS INCRUSTAR Ana un 106,464.00 106,464.00 1.0000
686 OLIMPIA BRILLANTE BASE 20X20 Ana m 55,569.90 800,206.56 14.4000
1,119 PUERTAS DUCHAS POLIESTIR. Ana m 179,800.00 485,460.00 2.7000
915 PUERTAS MARCO Y HOJA Ana un 239,370.64 239,370.64 1.0000
2,831 REJILLA SOSCO 3X2 ACERO Ins un 3,900.00 3,900.00 1.0000
1,178 BAO NO. 6 / 2 AP. STILO 3,357,904.97un
576 CERRADURA SCHLAGE BAO A40S Ins un 31,204.00 31,204.00 1.0000
1,041 ESMALTE SOBRE MADERA LLENA Ana m 17,176.40 49,468.03 2.8800
-
Titulo Base de Datos
Fecha : 02/06/10
23Pgina :
ANALISIS DETALLADOS ALFABETICOS
Nombre Vr.Unitario Vr.TotalU.M. CantidadTipoCodigo
3,741 ESPEJO CRISTAL BELGA 5MM Ins m 45,200.00 36,160.00 0.8000
1,033 ESTUCO Y VINILO 3 MANOS Ana m 10,275.35 23,119.54 2.2500
1,179 INSTALACIN Y DOTACIN BAO NO.6 Ana un 1,449,162.20 1,449,162.20 1.0000
703 JUEGOS INCRUSTAR STILO Ana un 239,854.00 239,854.00 1.0000
686 OLIMPIA BRILLANTE BASE 20X20 Ana m 55,569.90 800,206.56 14.4000
1,119 PUERTAS DUCHAS POLIESTIR. Ana m 179,800.00 485,460.00 2.7000
915 PUERTAS MARCO Y HOJA Ana un 239,370.64 239,370.64 1.0000
2,831 REJILLA SOSCO 3X2 ACERO Ins un 3,900.00 3,900.00 1.0000
164 BARANDA EN MADERA 109,037.10m
13,768 CEDRO MACHO PIEZA 3.0 Ins un 78,000.00 54,600.00 0.7000
5,064 MANO DE OBRA DD Ins hc 19,788.00 19,788.00 1.0000
12,126 PUNTILLA SIN CABEZA 1 Ins lb 2,600.00 650.00 0.2500
13,603 SUB-CONTRATO CARPINTERA Esp % 75,198.00 33,839.10 45.0000
3,789 TORNILLO PARA MADERA 2 NO.9 Ins un 80.00 160.00 2.0000
1,047 BARNIZ SOBRE MUEBLES 69,862.00m
2,531 BARNEX NOGAL Ins gl 67,600.00 7,436.00 0.1100
2,534 BARNIZ BRILLANTE EXTERIOR Ins gl 46,465.00 13,010.20 0.2800
5,066 MANO DE OBRA CC Ins hc 18,963.00 23,324.49 1.2300
1,624 PABMERIL PLIEGO 9 X 11 Ins un 1,400.00 4,410.00 3.1500
13,611 SUB-CONTRATO PINTURA Esp % 48,180.69 21,681.31 45.0000
4,790 BARRAJE PREM. 6 SALIDAS 297,241.31un
983 BARRAJE PREMOLDEADO B. T. 500 A Ins un 200,000.00 200,000.00 1.0000
4,710 CUADRILLA MONTAJE EQUIPOS Ana hc 46,812.91 70,219.37 1.5000
13,598 HERRAMIENTA MENOR Esp % 270,219.37 27,021.94 10.0000
2,743 BARRAS 50,900.00un
1,813 BARRA 16 LB Ins un 50,900.00 50,900.00 1.0000
4,227 BARRERA CICLORRUTAS A-130 139,193.76m
8,099 BARRERA CICLOR P/CONTINUA A-130 Ins m 73,660.00 73,660.00 1.0000
8,132 CUADRILLA ALBAILERA OF + AYUDANTE Ins hc 16,490.00 6,596.00 0.4000
3,140 MORTERO 1:3 Ana m 267,881.41 535.76 0.0020
3,144 MORTERO 1:6 Ana m 171,881.41 1,718.81 0.0100
4,102 SUB-BASE PARA ANDENES Ana m 91,424.50 56,683.19 0.6200
4,228 BARRERA CICLORRUTAS A-140 84,159.57m
8,100 BARRERA CICLOR P/AISLADA A-140 Ins m 73,660.00 73,660.00 1.0000
8,132 CUADRILLA ALBAILERA OF + AYUDANTE Ins hc 16,490.00 8,245.00 0.5000
3,140 MORTERO 1:3 Ana m 267,881.41 535.76 0.0020
3,144 MORTERO 1:6 Ana m 171,881.41 1,718.81 0.0100
72 BASE AGREGADO PTREO 54,183.00m
-
Titulo Base de Datos
Fecha : 02/06/10
24Pgina :
ANALISIS DETALLADOS ALFABETICOS
Nombre Vr.Unitario Vr.TotalU.M. CantidadTipoCodigo
4,489 MANO DE OBRA AA Ins hc 16,490.00 11,543.00 0.7000
540 VIBROCOMPACTADOR A GASOLINA Ins d 26,000.00 1,040.00 0.0400
70 ZAHORRA B-200 Ins m 32,000.00 41,600.00 1.3000
73 BASE ARENA CEMENTO 1:20 108,275.00m
3,684 AGUA Ins lt 20.00 4,680.00 234.0000
13,586 ARENA DE REVOQUE (AMARILLA) Ins m 20,000.00 32,200.00 1.6100
804 CEMENTO GRIS Ins kg 520.00 58,812.00 113.1000
4,489 MANO DE OBRA AA Ins hc 16,490.00 11,543.00 0.7000
540 VIBROCOMPACTADOR A GASOLINA Ins d 26,000.00 1,040.00 0.0400
3,091 BASE ASFLTICA 1,132,909.70m
8,132 CUADRILLA ALBAILERA OF + AYUDANTE Ins hc 16,490.00 6,266.20 0.3800
8,178 ECOPETROL BARRANCABERMEJA MD-12 Ins lt 590,912.00 472,729.60 0.8000
2,419 ECOPETROL BARRANCABERMEJA MDC-1 Ins m 544,923.00 653,907.60 1.2000
863 EQUIPO DE LABORATORIO DE SUELOS Ins d 630.00 6.30 0.0100
4,469 BASE ASFLTICA MDC-1 MODIF CON
POLMEROS PLANTA
425,077.21m
15,262 ARENA DE RO B/QUILLA. Ins m 20,000.00 6,000.00 0.3000
13,591 ARENA LAVADA (ARROYO DE PIEDRA) Ins m 39,420.00 11,826.00 0.3000
8,239 ASFALTO MODIFICADO CON POLMEROS TIPO 2 Ins kg 2,560.00 307,200.00 120.0000
8,237 CARGADOR 928G Ins h 100,000.00 5,000.00 0.0500
8,235 COMBUSTIBLE CRUDO Ins gl 4,151.00 24,532.41 5.9100
8,234 ENERGA Ins kw 310.00 1,388.80 4.4800
15,258 GRAVILLA DE 3/4 B/QUILLA. Ins m 65,500.00 18,340.00 0.2800
13,661 GRAVILLA FINA 1/2 B/QUILLA. Ins m 68,000.00 19,040.00 0.2800
8,238 PLANTA DE ASFALTP B.G. TM-20 Ins tf-hr 278,000.00 13,900.00 0.0500
8,236 TRANSPORTE DE PTREOS Ins m-km 600.00 17,850.00 29.7500
3,765 BASE ASFLTICA MDC-1 ASFALTO MODIF 425,077.21m
15,262 ARENA DE RO B/QUILLA. Ins m 20,000.00 6,000.00 0.3000
13,591 ARENA LAVADA (ARROYO DE PIEDRA) Ins m 39,420.00 11,826.00 0.3000
8,239 ASFALTO MODIFICADO CON POLMEROS TIPO 2 Ins kg 2,560.00 307,200.00 120.0000
8,237 CARGADOR 928G Ins h 100,000.00 5,000.00 0.0500
8,235 COMBUSTIBLE CRUDO Ins gl 4,151.00 24,532.41 5.9100
8,234 ENERGA Ins kw 310.00 1,388.80 4.4800
15,258 GRAVILLA DE 3/4 B/QUILLA. Ins m 65,500.00 18,340.00 0.2800
13,661 GRAVILLA FINA 1/2 B/QUILLA. Ins m 68,000.00 19,040.00 0.2800
8,238 PLANTA DE ASFALTP B.G. TM-20 Ins tf-hr 278,000.00 13,900.00 0.0500
8,236 TRANSPORTE DE PTREOS Ins m-km 600.00 17,850.00 29.7500
4,224 BASE ASFLTICA MDC-2 NORMALIZADO 70-90 313,097.21m
15,262 ARENA DE RO B/QUILLA. Ins m 20,000.00 6,000.00 0.3000
13,591 ARENA LAVADA (ARROYO DE PIEDRA) Ins m 39,420.00 11,826.00 0.3000
8,233 ASFALTO NORMALIZADO 60-70 Ins kg 1,436.00 193,860.00 135.0000
8,237 CARGADOR 928G Ins h 100,000.00 5,000.00 0.0500
-
Titulo Base de Datos
Fecha : 02/06/10
25Pgina :
ANALISIS DETALLADOS ALFABETICOS
Nombre Vr.Unitario Vr.TotalU.M. CantidadTipoCodigo
8,235 COMBUSTIBLE CRUDO Ins gl 4,151.00 24,532.41 5.9100
8,234 ENERGA Ins kw 310.00 1,388.80 4.4800
15,258 GRAVILLA DE 3/4 B/QUILLA. Ins m 65,500.00 18,340.00 0.2800
13,661 GRAVILLA FINA 1/2 B/QUILLA. Ins m 68,000.00 20,400.00 0.3000
8,238 PLANTA DE ASFALTP B.G. TM-20 Ins tf-hr 278,000.00 13,900.00 0.0500
8,236 TRANSPORTE DE PTREOS Ins m-km 600.00 17,850.00 29.7500
557 BASE ASFALTO 1350 34,336.20m
13,542 BASE 7 CM 1350 EN OBRA Ins m 25,500.00 1,020.00 0.0400
1,513 BENITN DE 500 P-750 Ins ms 435,464.00 21,773.20 0.0500
4,489 MANO DE OBRA AA Ins hc 16,490.00 11,543.00 0.7000
236 BASE B-200 73,053.50m
13,632 CILINDRO GALION Ins hh 69,600.00 2,088.00 0.0300
4,489 MANO DE OBRA AA Ins hc 16,490.00 19,788.00 1.2000
1,485 MOTONIVELADORA 140 K Ins hh 280,000.00 8,400.00 0.0300
1,487 TANQUE DE AGUA FORD 600 Ins hh 39,250.00 1,177.50 0.0300
70 ZAHORRA B-200 Ins m 32,000.00 41,600.00 1.3000
237 BASE B-600 71,623.50m
13,632 CILINDRO GALION Ins hh 69,600.00 2,088.00 0.0300
4,489 MANO DE OBRA AA Ins hc 16,490.00 19,788.00 1.2000
1,485 MOTONIVELADORA 140 K Ins hh 280,000.00 8,400.00 0.0300
71 RECEBO B-400 Ins m 30,900.00 40,170.00 1.3000
1,487 TANQUE DE AGUA FORD 600 Ins hh 39,250.00 1,177.50 0.0300
329 BASE CONCRETO POBRE E=.05 17,476.81m
1,549 CONCRETO 1:3:5 Ana m 228,068.50 13,684.11 0.0600
4,489 MANO DE OBRA AA Ins hc 16,490.00 3,792.70 0.2300
3,141 BASE GRANULAR B-200 65,000.00m
15,209 RECEBO B-200 B/QUILLA. Ins m 50,000.00 65,000.00 1.3000
3,142 BASE GRANULAR B-600 58,760.00m
13,974 RECEBO B-600 B/QUILLA Ins m 45,200.00 58,760.00 1.3000
3,672 BASE GRANULAR MEJORADA CON CAL 74,471.68m
2,487 CAL Ins kg 890.00 62.30 0.0700
522 CARROTANQUE Ins h 150,000.00 4,500.00 0.0300
8,227 MOTONIVELADORA CAT 120G Ins h 110,000.00 7,700.00 0.0700
8,144 OFICIAL Ins d 39,669.00 793.38 0.0200
13,974 RECEBO B-600 B/QUILLA Ins m 45,200.00 60,116.00 1.3300
540 VIBROCOMPACTADOR A GASOLINA Ins d 26,000.00 1,300.00 0.0500
-
Titulo Base de Datos
Fecha : 02/06/10
26Pgina :
ANALISIS DETALLADOS ALFABETICOS
Nombre Vr.Unitario Vr.TotalU.M. CantidadTipoCodigo
3,682 BASE GRANULAR MEJORADA CON CEMENTO AL
7%
152,128.58m
522 CARROTANQUE Ins h 150,000.00 4,500.00 0.0300
804 CEMENTO GRIS Ins kg 520.00 77,459.20 148.9600
8,227 MOTONIVELADORA CAT 120G Ins h 110,000.00 7,700.00 0.0700
8,144 OFICIAL Ins d 39,669.00 793.38 0.0200
13,974 RECEBO B-600 B/QUILLA Ins m 45,200.00 60,116.00 1.3300
540 VIBROCOMPACTADOR A GASOLINA Ins d 26,000.00 1,560.00 0.0600
3,675 BASE GRANULAR MEJORADA CON CENIZA AL 5% 74,914.38m
522 CARROTANQUE Ins h 150,000.00 4,500.00 0.0300
15,274 CENIZA - B/QUILLA. Ins m 3,500.00 245.00 0.0700
8,227 MOTONIVELADORA CAT 120G Ins h 110,000.00 7,700.00 0.0700
8,144 OFICIAL Ins d 39,669.00 793.38 0.0200
13,974 RECEBO B-600 B/QUILLA Ins m 45,200.00 60,116.00 1.3300
540 VIBROCOMPACTADOR A GASOLINA Ins d 26,000.00 1,560.00 0.0600
3,676 BASE GRANULAR MEJORADA CON CENIZA AL 7% 74,984.38m
522 CARROTANQUE Ins h 150,000.00 4,500.00 0.0300
15,274 CENIZA - B/QUILLA. Ins m 3,500.00 315.00 0.0900
8,227 MOTONIVELADORA CAT 120G Ins h 110,000.00 7,700.00 0.0700
8,144 OFICIAL Ins d 39,669.00 793.38 0.0200
13,974 RECEBO B-600 B/QUILLA Ins m 45,200.00 60,116.00 1.3300
540 VIBROCOMPACTADOR A GASOLINA Ins d 26,000.00 1,560.00 0.0600
2,746 BATEAS 19,900.00un
1,828 BATEA METLICA Ins un 19,900.00 19,900.00 1.0000
1,237 BIDET STILO 543,000.00un
147 BIDE PRESTIGIO BONE Ins un 543,000.00 543,000.00 1.0000
1,236 BIDET STILO/ELITE 543,000.00un
147 BIDE PRESTIGIO BONE Ins un 543,000.00 543,000.00 1.0000
1,235 BIDET TIFFANY 543,000.00un
152 BID PRESTIGIO BLANCO Ins un 543,000.00 543,000.00 1.0000
1,311 BISAGRA VAIVN 19,763.00un
1,791 BISAGRA GATO VAIVN 90 Ins un 19,763.00 19,763.00 1.0000
65 BLOQUE 0.23 PAETADO 89,018.91m
263 FILOS Y DILATACIONES Ana m 4,044.08 2,830.86 0.7000
197 MURO EN BLOQUE NO.5 0.23 Ana m 50,733.12 50,733.12 1.0000
-
Titulo Base de Datos
Fecha : 02/06/10
27Pgina :
ANALISIS DETALLADOS ALFABETICOS
Nombre Vr.Unitario Vr.TotalU.M. CantidadTipoCodigo
1,164 PAETE - ESTUCO - PINTURA Ana m 32,231.75 35,454.93 1.1000
66 BLOQUE CONCRETO 0.23 PAETADO 83,507.78m
263 FILOS Y DILATACIONES Ana m 4,044.08 2,426.45 0.6000
208 MURO EN BLOQUE CONCRETO 0.20 Ana m 62,732.10 69,005.31 1.1000
266 PAETE LISO MUROS 1:5 Ana m 10,978.20 12,076.02 1.1000
94 BODEGA MEDIA /ML 2,062,812.00m
72 BASE AGREGADO PTREO Ana m 54,183.00 16,796.73 0.3100
65 BLOQUE 0.23 PAETADO Ana m 89,018.91 801,170.19 9.0000
135 CAJAS INSPECCIN 60 X 60 Ana un 328,945.50 72,368.01 0.2200
64 EXCAVACIN Y RETIRO SOBRANTES Ana m 70,955.20 334,198.99 4.7100
13,601 IMPREVISTOS Esp % 1,964,582.86 98,229.14 5.0000
52 PISO CONCRETO INDUSTRIAL LIVIANO Ana m 67,700.14 677,001.40 10.0000
121 TUBERA PARA DRENAJE 4 Ana m 31,523.77 63,047.54 2.0000
110 BODEGA MEDIA -FACHADAS 7,212,789.64gl
72 BASE AGREGADO PTREO Ana m 54,183.00 238,405.20 4.4000
64 EXCAVACIN Y RETIRO SOBRANTES Ana m 70,955.20 993,372.80 14.0000
13,601 IMPREVISTOS Esp % 6,869,323.47 343,466.17 5.0000
185 SOBRECIMIENTOS 0.25 Ana m 49,547.48 594,569.76 12.0000
62 SOBRECOSTO PUERTA TIPO C Ana un 5,042,975.71 5,042,975.71 1.0000
106 BODEGA MEDIA ESTRUCTURA /ML 1,862,717.51m
333 COLUMNAS Ana m 735,638.42 125,058.53 0.1700
56 ESTRUCTURA METLICA BODEGA Ana kg 5,365.44 751,161.60 140.0000
13,600 HONORARIO ESTRUCTURA Esp % 1,708,915.14 68,356.61 4.0000
13,601 IMPREVISTOS Esp % 1,708,915.14 85,445.76 5.0000
75 LLAVE MANGUERA Ana un 27,600.00 11,040.00 0.4000
358 REFUERZOS HIERRO 37000 FG Ana tn 3,142,761.80 94,282.85 0.0300
359 REFUERZOS HIERRO 60000 FG Ana tn 3,076,801.80 369,216.22 0.1200
50 VIGA SOBRE MURO TABICN Ana m 642,961.92 192,888.58 0.3000
79 VIGA TEE 25X25X20X40 Ana m 492,711.62 73,906.74 0.1500
76 ZAPATAS Ana m 456,803.10 91,360.62 0.2000
102 BODEGA MEDIA ESTRUCTURA FACHADA 13,949,138.62gl
333 COLUMNAS Ana m 735,638.42 3,097,037.75 4.2100
13,600 HONORARIO ESTRUCTURA Esp % 12,797,374.88 511,895.00 4.0000
13,601 IMPREVISTOS Esp % 12,797,374.88 639,868.74 5.0000
75 LLAVE MANGUERA Ana un 27,600.00 165,600.00 6.0000
358 REFUERZOS HIERRO 37000 FG Ana tn 3,142,761.80 377,131.42 0.1200
359 REFUERZOS HIERRO 60000 FG Ana tn 3,076,801.80 4,861,346.84 1.5800
50 VIGA SOBRE MURO TABICN Ana m 642,961.92 3,336,972.36 5.1900
76 ZAPATAS Ana m 456,803.10 959,286.51 2.1000
93 BODEGA NORMAL /ML 4,126,167.56m
-
Titulo Base de Datos
Fecha : 02/06/10
28Pgina :
ANALISIS DETALLADOS ALFABETICOS
Nombre Vr.Unitario Vr.TotalU.M. CantidadTipoCodigo
72 BASE AGREGADO PTREO Ana m 54,183.00 40,637.25 0.7500
65 BLOQUE 0.23 PAETADO Ana m 89,018.91 1,121,638.27 12.6000
135 CAJAS INSPECCIN 60 X 60 Ana un 328,945.50 69,078.56 0.2100
64 EXCAVACIN Y RETIRO SOBRANTES Ana m 70,955.20 547,064.59 7.7100
13,601 IMPREVISTOS Esp % 3,929,683.38 196,484.17 5.0000
53 PISO CONCRETO INDUSTRIAL MEDIO Ana m 149,158.37 2,088,217.18 14.0000
121 TUBERA PARA DRENAJE 4 Ana m 31,523.77 63,047.54 2.0000
105 BODEGA NORMAL ESTRUCTURA /ML 2,892,396.35m
333 COLUMNAS Ana m 735,638.42 161,840.45 0.2200
56 ESTRUCTURA METLICA BODEGA Ana kg 5,365.44 1,191,127.68 222.0000
13,600 HONORARIO ESTRUCTURA Esp % 2,653,574.63 106,142.99 4.0000
13,601 IMPREVISTOS Esp % 2,653,574.63 132,678.73 5.0000
75 LLAVE MANGUERA Ana un 27,600.00 15,456.00 0.5600
358 REFUERZOS HIERRO 37000 FG Ana tn 3,142,761.80 125,710.47 0.0400
359 REFUERZOS HIERRO 60000 FG Ana tn 3,076,801.80 646,128.38 0.2100
50 VIGA SOBRE MURO TABICN Ana m 642,961.92 334,340.20 0.5200
79 VIGA TEE 25X25X20X40 Ana m 492,711.62 73,906.74 0.1500
76 ZAPATAS Ana m 456,803.10 105,064.71 0.2300
101 BODEGA NORMAL ESTRUCTURA FACHADA 23,115,376.32gl
333 COLUMNAS Ana m 735,638.42 4,340,266.68 5.9000
13,600 HONORARIO ESTRUCTURA Esp % 21,206,767.27 848,270.69 4.0000
13,601 IMPREVISTOS Esp % 21,206,767.27 1,060,338.36 5.0000
75 LLAVE MANGUERA Ana un 27,600.00 324,576.00 11.7600
358 REFUERZOS HIERRO 37000 FG Ana tn 3,142,761.80 659,979.98 0.2100
359 REFUERZOS HIERRO 60000 FG Ana tn 3,076,801.80 7,722,772.52 2.5100
50 VIGA SOBRE MURO TABICN Ana m 642,961.92 6,294,597.20 9.7900
79 VIGA TEE 25X25X20X40 Ana m 492,711.62 73,906.74 0.1500
76 ZAPATAS Ana m 456,803.10 1,790,668.15 3.9200
109 BODEGA NORMAL -FACHADAS 33,469,533.00gl
72 BASE AGREGADO PTREO Ana m 54,183.00 402,037.86 7.4200
65 BLOQUE 0.23 PAETADO Ana m 89,018.91 20,590,073.88 231.3000
64 EXCAVACIN Y RETIRO SOBRANTES Ana m 70,955.20 1,788,071.04 25.2000
13,601 IMPREVISTOS Esp % 31,875,745.71 1,593,787.29 5.0000
272 PAETE RUSTICO MUROS 1:5 Ana m 13,289.20 1,536,231.52 115.6000
185 SOBRECIMIENTOS 0.25 Ana m 49,547.48 832,397.66 16.8000
61 SOBRECOSTO PUERTA TIPO B Ana un 6,726,933.75 6,726,933.75 1.0000
95 BODEGA POPULAR /ML 996,417.67m
72 BASE AGREGADO PTREO Ana m 54,183.00 17,880.39 0.3300
66 BLOQUE CONCRETO 0.23 PAETADO Ana m 83,507.78 601,256.02 7.2000
135 CAJAS INSPECCIN 60 X 60 Ana un 328,945.50 72,368.01 0.2200
64 EXCAVACIN Y RETIRO SOBRANTES Ana m 70,955.20 194,417.25 2.7400
13,601 IMPREVISTOS Esp % 948,969.21 47,448.46 5.0000
121 TUBERA PARA DRENAJE 4 Ana m 31,523.77 63,047.54 2.0000
-
Titulo Base de Datos
Fecha : 02/06/10
29Pgina :
ANALISIS DETALLADOS ALFABETICOS
Nombre Vr.Unitario Vr.TotalU.M. CantidadTipoCodigo
103 BODEGA POPULAR ESTRUCTURA FACHADA 6,555,834.11gl
13,600 HONORARIO ESTRUCTURA Esp % 6,014,526.70 240,581.07 4.0000
13,601 IMPREVISTOS Esp % 6,014,526.70 300,726.34 5.0000
358 REFUERZOS HIERRO 37000 FG Ana tn 3,142,761.80 188,565.71 0.0600
359 REFUERZOS HIERRO 60000 FG Ana tn 3,076,801.80 2,646,049.55 0.8600
50 VIGA SOBRE MURO TABICN Ana m 642,961.92 2,668,291.97 4.1500
76 ZAPATAS Ana m 456,803.10 511,619.47 1.1200
107 BODEGA POPULAR ESTRUCTURA/ML 981,445.99m
333 COLUMNAS Ana m 735,638.42 191,265.99 0.2600
56 ESTRUCTURA METLICA BODEGA Ana kg 5,365.44 214,617.60 40.0000
13,601 IMPREVISTOS Esp % 934,710.47 46,735.52 5.0000
358 REFUERZOS HIERRO 37000 FG Ana tn 3,142,761.80 62,855.24 0.0200
359 REFUERZOS HIERRO 60000 FG Ana tn 3,076,801.80 307,680.18 0.1000
50 VIGA SOBRE MURO TABICN Ana m 642,961.92 25,718.48 0.0400
79 VIGA TEE 25X25X20X40 Ana m 492,711.62 64,052.51 0.1300
76 ZAPATAS Ana m 456,803.10 68,520.47 0.1500
111 BODEGA POPULAR -FACHADAS 12,257,534.13gl
72 BASE AGREGADO PTREO Ana m 54,183.00 32,509.80 0.6000
66 BLOQUE CONCRETO 0.23 PAETADO Ana m 83,507.78 6,306,507.55 75.5200
64 EXCAVACIN Y RETIRO SOBRANTES Ana m 70,955.20 681,169.92 9.6000
13,601 IMPREVISTOS Esp % 11,673,842.03 583,692.10 5.0000
185 SOBRECIMIENTOS 0.25 Ana m 49,547.48 1,189,139.52 24.0000
63 SOBRECOSTO PUERTA TIPO D Ana un 3,464,515.24 3,464,515.24 1.0000
92 BODEGA SUPERIOR /ML 4,378,999.81m
72 BASE AGREGADO PTREO Ana m 54,183.00 49,306.53 0.9100
135 CAJAS INSPECCIN 60 X 60 Ana un 328,945.50 72,368.01 0.2200
64 EXCAVACIN Y RETIRO SOBRANTES Ana m 70,955.20 766,316.16 10.8000
13,601 IMPREVISTOS Esp % 4,170,476.01 208,523.80 5.0000
54 PISO CONCRETO INDUSTRIAL PESADO Ana m 157,985.81 3,159,716.20 20.0000
185 SOBRECIMIENTOS 0.25 Ana m 49,547.48 29,728.49 0.6000
122 TUBERA PARA DRENAJE 6 Ana m 46,520.31 93,040.62 2.0000
104 BODEGA SUPERIOR ESTRUCTURA T /ML 4,272,778.46m
333 COLUMNAS Ana m 735,638.42 154,484.07 0.2100
56 ESTRUCTURA METLICA BODEGA Ana kg 5,365.44 1,716,940.80 320.0000
13,600 HONORARIO ESTRUCTURA Esp % 3,919,980.24 156,799.21 4.0000
13,601 IMPREVISTOS Esp % 3,919,980.24 195,999.01 5.0000
358 REFUERZOS HIERRO 37000 FG Ana tn 3,142,761.80 125,710.47 0.0400
359 REFUERZOS HIERRO 60000 FG Ana tn 3,076,801.80 1,230,720.72 0.4000
50 VIGA SOBRE MURO TABICN Ana m 642,961.92 334,340.20 0.5200
79 VIGA TEE 25X25X20X40 Ana m 492,711.62 270,991.39 0.5500
76 ZAPATAS Ana m 456,803.10 86,792.59 0.1900
108 BODEGA SUPERIOR -FACHADAS 10,071,308.42gl
-
Titulo Base de Datos
Fecha : 02/06/10
30Pgina :
ANALISIS DETALLADOS ALFABETICOS
Nombre Vr.Unitario Vr.TotalU.M. CantidadTipoCodigo
72 BASE AGREGADO PTREO Ana m 54,183.00 1,024,058.70 18.9000
64 EXCAVACIN Y RETIRO SOBRANTES Ana m 70,955.20 2,611,151.36 36.8000
13,601 IMPREVISTOS Esp % 9,591,722.30 479,586.12 5.0000
185 SOBRECIMIENTOS 0.25 Ana m 49,547.48 1,189,139.52 24.0000
60 SOBRECOST0 PUERTA TIPO A Ana un 4,767,372.72 4,767,372.72 1.0000
100 BODEGA SUPERIOR-ESTRUCTURA FACHADA 48,006,161.83gl
333 COLUMNAS Ana m 735,638.42 9,298,469.63 12.6400
13,600 HONORARIO ESTRUCTURA Esp % 44,042,350.30 1,761,694.01 4.0000
13,601 IMPREVISTOS Esp % 44,042,350.30 2,202,117.52 5.0000
358 REFUERZOS HIERRO 37000 FG Ana tn 3,142,761.80 1,225,677.10 0.3900
359 REFUERZOS HIERRO 60000 FG Ana tn 3,076,801.80 13,937,912.15 4.5300
50 VIGA SOBRE MURO TABICN Ana m 642,961.92 16,382,669.72 25.4800
76 ZAPATAS Ana m 456,803.10 3,197,621.70 7.0000
173 BOLARDO M 63 ALTO / HIERRO 160,840.00un
870 BOLARDO M-63 - METLICO Ins un 110,000.00 141,900.00 1.2900
8,141 CONCRETO CORRIENTE GRAVA COMN 1500 PSI Ins m 245,000.00 2,450.00 0.0100
8,132 CUADRILLA ALBAILERA OF + AYUDANTE Ins hc 16,490.00 16,490.00 1.0000
3,549 BOLARDO M-60 CONCRETO 94,722.00un
8,221 BOLARDO M-60 - CONCRETO Ins un 33,850.00 33,850.00 1.0000
8,141 CONCRETO CORRIENTE GRAVA COMN 1500 PSI Ins m 245,000.00 14,700.00 0.0600
8,132 CUADRILLA ALBAILERA OF + AYUDANTE Ins hc 16,490.00 46,172.00 2.8000
3,560 BOLARDO M-61 BAJO / CONCRETO 68,435.00un
8,222 BOLARDO M-61 - BAJO - CONCRETO Ins un 29,000.00 29,000.00 1.0000
8,141 CONCRETO CORRIENTE GRAVA COMN 1500 PSI Ins m 245,000.00 14,700.00 0.0600
8,132 CUADRILLA ALBAILERA OF + AYUDANTE Ins hc 16,490.00 24,735.00 1.5000
3,561 BOLARDO M-62 BAJO / HIERRO 149,435.00un
8,223 BOLARDO M-62 - BAJO - HIERRO Ins un 110,000.00 110,000.00 1.0000
8,141 CONCRETO CORRIENTE GRAVA COMN 1500 PSI Ins m 245,000.00 14,700.00 0.0600
8,132 CUADRILLA ALBAILERA OF + AYUDANTE Ins hc 16,490.00 24,735.00 1.5000
1,401 BOMBA AGUA 1 1/2 - 3.6 HP 270,900.00un
354 BOMBA AGUA 1 1/2 T. BAJO-ALTO DE 1.5HP 220 V Ins un 270,900.00 270,900.00 1.0000
1,402 BOMBA AGUA 2 - 9 HP 1,600,765.00un
355 BOMBA A GASOLINA 2 Ins mes 1,600,765.00 1,600,765.00 1.0000
4,127 BORDE CONTENEDOR DE RACES A-70 36,023.66m
8,249 BORDE CONTENEDOR DE RACES A-70 Ins m 27,000.00 10,260.00 0.3800
-
Titulo Base de Datos
Fecha : 02/06/10
31Pgina :
ANALISIS DETALLADOS ALFABETICOS
Nombre Vr.Unitario Vr.TotalU.M. CantidadTipoCodigo
8,132 CUADRILLA ALBAILERA OF + AYUDANTE Ins hc 16,490.00 16,490.00 1.0000
3,143 MORTERO 1:4 Ana m 231,841.41 9,273.66 0.0400
3,223 BORDE SEPARADOR VERDE A-130 162,268.71m
13,586 ARENA DE REVOQUE (AMARILLA) Ins m 20,000.00 1,400.00 0.0700
8,191 BORDE SEPARADOR VERDE A-170 Ins un 150,800.00 150,800.00 1.0000
8,132 CUADRILLA ALBAILERA OF + AYUDANTE Ins hc 16,490.00 7,750.30 0.4700
3,143 MORTERO 1:4 Ana m 231,841.41 2,318.41 0.0100
3,209 BORDE SEPARADOR VERDE A-170 142,330.30m
13,586 ARENA DE REVOQUE (AMARILLA) Ins m 20,000.00 1,200.00 0.0600
4,373 BORDE SEPARADOR VERDE A-170 Ins un 130,000.00 130,000.00 1.0000
804 CEMENTO GRIS Ins kg 520.00 3,380.00 6.5000
8,132 CUADRILLA ALBAILERA OF + AYUDANTE Ins hc 16,490.00 7,750.30 0.4700
4,197 BORDILLO DE 8 X 15 CM FUNDIDO EN CONCRETO 12,377.10m
769 CONCRETO CORRIENTE GRAVA COMN 2500 PSI Ins m 275,000.00 2,750.00 0.0100
8,132 CUADRILLA ALBAILERA OF + AYUDANTE Ins hc 16,490.00 9,069.50 0.5500
4,003 FORMALETA SARDINEL Ins d 680.00 557.60 0.8200
4,137 BORDILLO FUNDIDO EN SITIO 20 X 35 CM 35,584.70m
769 CONCRETO CORRIENTE GRAVA COMN 2500 PSI Ins m 275,000.00 22,000.00 0.0800
8,132 CUADRILLA ALBAILERA OF + AYUDANTE Ins hc 16,490.00 13,027.10 0.7900
4,003 FORMALETA SARDINEL Ins d 680.00 557.60 0.8200
3,210 BORDILLO PREFABRICADO A-80 30,295.20m
13,586 ARENA DE REVOQUE (AMARILLA) Ins m 20,000.00 1,200.00 0.0600
8,190 BORDILLO PREFABRICADO A-80 Ins un 17,800.00 17,800.00 1.0000
804 CEMENTO GRIS Ins kg 520.00 3,380.00 6.5000
8,132 CUADRILLA ALBAILERA OF + AYUDANTE Ins hc 16,490.00 7,915.20 0.4800
2,298 BORNA 4/0 24,486.59un
15,486 BORNA TERMINAL 4/0 MCM Ins un 15,600.00 15,600.00 1.0000
4,709 CUADRILLA INSTAL. INTERNAS Ana hc 20,183.45 6,660.54 0.3300
13,598 HERRAMIENTA MENOR Esp % 22,260.54 2,226.05 10.0000
2,756 BOTA CAUCHO SEGURIDAD 49,900.00par
1,588 BOTA DE CAUCHO SEGURIDAD Ins un 49,900.00 49,900.00 1.0000
2,757 BOTIQUN PRIMEROS AUXILIOS 394,100.00un
13,636 BOTIQUN PRIMEROS AUXILIOS Ins un 80,900.00 80,900.00 1.0000
1,582 BOTIQUN PRIMEROS AUXILIOS IND Ins un 313,200.00 313,200.00 1.0000
1,409 BOTONERA FUENTE CITFONOS 350,000.00un
-
Titulo Base de Datos
Fecha : 02/06/10
32Pgina :
ANALISIS DETALLADOS ALFABETICOS
Nombre Vr.Unitario Vr.TotalU.M. CantidadTipoCodigo
728 BOTONERA SNICA DIGITAL Ins un 350,000.00 350,000.00 1.0000
2,486 BREAKERS 2 X 30 AMPERIOS 43,303.02un
2,014 BREAKER 2000 BIPOLAR HQP 30A Ins un 13,240.00 13,240.00 1.0000
5,107 HR. CUADRILLA OF+AY. ELCTRICO Ins hc 18,139.00 18,139.00 1.0000
13,605 SUB-CONTRATO ELCTRICO Esp % 31,379.00 11,924.02 38.0000
398 CABALLETE ARTICULADO TEJA FIBROCEMENTO 27,944.60m
14,535 CABALLETE ETERNIT ARTI. ONDULADO ALA
SUP-INF
Ins un 18,600.00 18,600.00 1.0000
4,489 MANO DE OBRA AA Ins hc 16,490.00 8,904.60 0.5400
14,536 TORNILLO FIJADOR DE ALA Ins un 220.00 440.00 2.0000
417 CABALLETE FIJO TEJA FIBROCEMENTO 51,935.45m
1,052 CABALLETE FIJO COLOMBIT P7 20 Ins un 36,879.00 42,410.85 1.1500
1,056 GANCHO GALVANIZADO PARA MADERA Ins un 310.00 620.00 2.0000
4,489 MANO DE OBRA AA Ins hc 16,490.00 8,904.60 0.5400
404 CABALLETE TEJA ETERNIT 31,372.15m
1,091 CABALLETE ETERNIT PF/7 FIJO Ins un 18,485.00 21,257.75 1.1500
1,123 GANCHO TEJA ETERNIT 55 MM Ins un 263.00 1,209.80 4.6000
4,489 MANO DE OBRA AA Ins hc 16,490.00 8,904.60 0.5400
367 CABLE AWG/THW 75,707.89m
944 ALAMBRE DESNUDO NO.10 AWG Ins m 59,147.00 59,147.00 1.0000
393 AMARRE DE LONGITUD 280 MM, ANCHO 4.6MM. Ins un 400.00 400.00 1.0000
877 CABLE COBRE THW 10 AWG Ins m 2,840.00 2,840.00 1.0000
876 CABLE COBRE THW 12 AWG Ins m 2,210.00 4,420.00 2.0000
4,709 CUADRILLA INSTAL. INTERNAS Ana hc 20,183.45 2,018.35 0.1000
13,598 HERRAMIENTA MENOR Esp % 68,825.35 6,882.54 10.0000
2,193 CABLE CU NO. 10 AWG 5,056.35m
877 CABLE COBRE THW 10 AWG Ins m 2,840.00 2,982.00 1.0500
4,709 CUADRILLA INSTAL. INTERNAS Ana hc 20,183.45 1,614.68 0.0800
13,598 HERRAMIENTA MENOR Esp % 4,596.68 459.67 10.0000
2,180 CABLE CU NO. 4 AWG