annex-figures - jicaanf-2-5 0 bustos weir bayabas r. angat r. angat dam ipo dam 16.5 labangan...
TRANSCRIPT
Annex-Figures
ANF-2-1
Annex-F 2.1.1 Distribution of Elevation Zones in the Study Area
ANF-2-2
Annex-F 2.1.2 Distribution of Slope Category in the Study Area
ANF-2-3
Annex-F 2.2.1 Principal Sub-basins in the Study Area
ANF-2-4
0
Calumpit
Massim R.
45.6
San Miguel R.
Bamban R. Baliwag R.
Talavera R.
Rio Chico R.
Angat R.
Pasac R.
Tabualing R. Cabu R. Digmala R.
Coronell R.
Sumacbao R.
Penaranda R.
MasiwayDam
PantabanganDam
PAM01PAM01
PAM02PAM02
PAM03PAM03
PAM04PAM04 PAM05PAM05 PAM06PAM06
PEN01PEN01
COR01COR01
RCH01RCH01
21.0
45.8
71.2
101.5 117.6 149.2 172.6 182.9
208.2 214.9 264.60 0
58.3 72.4
0 0 0
30.6 58.5 32.2
25.4
67.2
72.7
0
0
0
67.2
0
9.7
52.8
0 0
158.444.9
64.0
Note: Number shows distance in km from downstream end of a river.
0
Calumpit
Massim R.
45.6
San Miguel R.
Bamban R. Baliwag R.
Talavera R.
Rio Chico R.
Angat R.
Pasac R.
Tabualing R. Cabu R. Digmala R.
Coronell R.
Sumacbao R.
Penaranda R.
MasiwayDam
PantabanganDam
PAM01PAM01
PAM02PAM02
PAM03PAM03
PAM04PAM04 PAM05PAM05 PAM06PAM06
PEN01PEN01
COR01COR01
RCH01RCH01
21.0
45.8
71.2
101.5 117.6 149.2 172.6 182.9
208.2 214.9 264.60 0
58.3 72.4
0 0 0
30.6 58.5 32.2
25.4
67.2
72.7
0
0
0
67.2
0
9.7
52.8
0 0
158.444.9
64.0
0
Calumpit
Massim R.
45.6
San Miguel R.
Bamban R. Baliwag R.
Talavera R.
Rio Chico R.
Angat R.
Pasac R.
Tabualing R. Cabu R. Digmala R.
Coronell R.
Sumacbao R.
Penaranda R.
MasiwayDam
PantabanganDam
PAM01PAM01
PAM02PAM02
PAM03PAM03
PAM04PAM04 PAM05PAM05 PAM06PAM06
PEN01PEN01
COR01COR01
RCH01RCH01
21.0
45.8
71.2
101.5 117.6 149.2 172.6 182.9
208.2 214.9 264.60 0
58.3 72.4
0 0 0
30.6 58.5 32.2
25.4
67.2
72.7
0
0
0
67.2
0
9.7
52.8
0 0
158.444.9
64.0
Note: Number shows distance in km from downstream end of a river.
Source: JICA Study Team
Annex-F 2.2.2 Schematic River System in Pampanga Main River System
0
100
200
300
400
500
600
700
800
900
1000
0 50 100 150 200 250 300
Distance (km)
Ele
vatio
n (m
Pampanga R.
PantabanganDam
Masiway Dam
PAM01less than1/10,000
PAM021/10,000 -1/5,000
Massim R.
San Miguel R.
Rio Chico R.incl. Talavera R.
Baliwag R.
Bamban R.
Penaranda R.
Sumacbao R.
Tabualing R.
Cabu R.
Coronell R.
Digmala R.
PAM041/2,500 -1/1,000
PAM031/5,000 -1/2,500
PAM051/1,000 -
1/400
PAN01more than
1/400
Ele
vatio
n(m
)
Source: JICA Study Team
Annex-F 2.2.3 Longitudinal Profile of the Main Rivers in Pampanga Main River System
ANF-2-5
0
BustosWeir
Bayabas R.
Angat R.AngatDamIpo Dam
16.5
LabanganFloodway
45.5 56.1 83.1 91.1
Angat R.0
37.9
152.7
ANG02ANG02ANG01ANG01 ANG03ANG03
Note: Number shows distance in km from downstream end of a river.
Bagbag R.
Pampanga R.
0
BustosWeir
Bayabas R.
Angat R.AngatDamIpo Dam
16.5
LabanganFloodway
45.5 56.1 83.1 91.1
Angat R.0
37.9
152.7
ANG02ANG02ANG01ANG01 ANG03ANG03
Note: Number shows distance in km from downstream end of a river.
Bagbag R.
Pampanga R.
Source: JICA Study Team
Annex-F 2.2.4 Schematic River System in Angat River System
0
100
200
300
400
500
600
700
800
0 20 40 60 80 100 120 140 160
Distance (km)
Ele
vatio
n (m
Angat R.
Angat Dam
Ipo Dam
Bayabas R.
ANG01less than1/2,000
ANG021/,2000 - 1/300
ANG03more than 1/300
LabanganFloodway
Conf. with Bagbag River
Bustos Weir
Ele
vatio
n(m
)
Source: JICA Study Team
Annex-F 2.2.5 Longitudinal Profile of the Main Rivers in Angat River System
ANF-2-6
0
Pasig-Potrero R.
Abacan R.
5.0
11.0
37.7
Note: Number shows distance in km from downstream end of a river.
Pampanga R.
San Fernando R.
Porac R.Gumain R.
Pasac R.
Guagua R.
Bebe-San Esteban Cutoff Channel
71.7
00
81.8
8.1
0
21.3
56.4
0
43.6
PAS01PAS01
Manapi Mesapinit R.0
Pasig-Potrero R.
Abacan R.
5.0
11.0
37.7
Note: Number shows distance in km from downstream end of a river.
Pampanga R.
San Fernando R.
Porac R.Gumain R.
Pasac R.
Guagua R.
Bebe-San Esteban Cutoff Channel
71.7
00
81.8
8.1
0
21.3
56.4
0
43.6
PAS01PAS01
Manapi Mesapinit R.
Source: JICA Study Team
Annex-F 2.2.6 Schematic River System in Pasac River System
0
100
200
300
400
500
600
700
800
900
1000
1100
1200
0 10 20 30 40 50 60 70 80 90 100
Distance (km)
Ele
vatio
n (m
Pasac R. incl. Abacan R.
Porac R.
Guagua R.incl. Pasig-Potrero R.Gumain R.
1/501/25 1/100
Ele
vatio
n(m
)
Source: JICA Study Team
Annex-F 2.2.7 Longitudinal Profile of the Main Rivers in Pasac River System
AN
F-2-7
Annex-F 2.3.1 Location of Meteorological Stations
ANF-2-8
0
1000
2000
3000
4000
5000
6000
7000
1951
1953
1955
1957
1959
1961
1963
1965
1967
1969
1971
1973
1975
1977
1979
1981
1983
1985
1987
1989
1991
1993
1995
1997
1999
2001
2003
2005
2007
Ann
ual p
reci
pita
tion
(mm
)
Cabanatuan Science Garden Infanta Iba
Source: JICA Study Team based on PAGASA data
Annex-F 2.3.2 Change in Annual Total Precipitation at Key Stations
ANF-2-9
Annex-F 2.3.3 Climate Zones
TTyyppeeⅠⅠ
TTyyppeeⅢⅢ
TTyyppeeⅡⅡ
ANF-2-10
Annex-F 2.3.4 Spatial Distribution of Annual Total Precipitation
ANF-2-11
Annex-F 2.3.5 Spatial Distribution of Precipitation in Dry Season
ANF-2-12
Annex-F 2.3.6 Spatial Distribution of Precipitation in Wet Season
ANF-2-13
2.1 Hydrology
Annex-F 2.4.1 Location of Hydrometric Stations
ANF-2-14
0.00
0.02
0.04
0.06
0.08
0.10
0.12
0 2,000 4,000 6,000 8,000 10,000
A (km2)
q (m3/s/km
P-PET<TRO<P
TRO<P-PET
q (m3 /s
/km2 )
1951 - 1973Angat Dam Catchment
0.00
0.02
0.04
0.06
0.08
0.10
0.12
0 2,000 4,000 6,000 8,000 10,000
A (km2)
q (m3/s/km
P-PET<TRO<P
TRO<P-PET
q (m3 /s
/km2 )
1974 - 2007Angat Dam Catchment
Source: JICA Study Team
Annex-F 2.4.2 Specific Discharge
ANF-2-15
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
0 2,000 4,000 6,000 8,000 10,000
A (km2)
C (-)
P-PET<TRO<P
TRO<P-PET
C(-)
1951 - 1973Angat Dam Catchment
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
0 2,000 4,000 6,000 8,000 10,000
A (km2)
C (-)
P-PET<TRO<P
TRO<P-PET1974 - 2007Angat Dam Catchment
C(-)
Source: JICA Study Team
Annex-F 2.4.3 Runoff Rate
ANF-2-16
2.2 Geology
Annex-F 2.5.1 Geological Map
ANF-2-17
2.3 Hydrogeology
Annex-F 2.6.1 Hydrogeology Map
ANF-2-18
2.10
Annex-F 2.10.1 Flood Area in Typhoon Marce, August 2004
ANF-3-1
Annex-F 3.1.1 Population Density of Each of Municipalities in the Study Area
ANF-3-2
Annex-F 3.3.1 Land Cover in the Study Area
ANF-3-3
Annex-F 3.4.1 Location of Water Permits for Surface Water
ANF-3-4
Annex-F 3.4.2 Location of Water Permits for Groundwater
ANF-3-5
Annex-F 3.6.1 Status of AD/AL (Ancestral Land) Delineation and Titling in and around the Study
Area as of March 9, 2010
ANF-4-1
T_UMI01
T_UMI02T_UMI03ANG03
ANG0204
ANG0203
N
S
W E
0 5 km
Angat storage dam
Ipo dam
Angat R.
Catchment of Angat storage damA=546km2
Umiray R.
Catchment of diversion point of Umiray trans-basinA=161km2
A1=130km2
A2=6km2
A3=25km2
A1
A2A3
Intake1-Umiray R.
Intake2-Alia R.(not yet completed)
Intake3-Sumag R.(not yet completed)
To Bustos dam
To MWSS
Main tunnel
Angat Inflow1) Self-catchment Qin=59.3m3/s (1,869MCM/y)(observed average in 1968-2007)2) Umiray trans-basin Qin=11.7m3/s(370MCM/y)(observed average in 2001-2003, 2006-2007)
Effective storage volume = 850MCM
H=131m
EL 212m (Dry season)
(Veff=738MCM)
EL 160m (Veff=0MCM)
EL 210m (Wet season)
(Veff=696MCM)
EL 219m (Veff=894MCM)
Dead volume
EL 180m (lower limit of operation of main power unit) (Veff=206MCM)
Flood control volume
Conservation volume (Domestic & Irrigation & Power)
206MCM
490MCM532MCM
42MCM
Angat dam
Supplied either by main turbine or through Ipo dam
Supplied only through Ipo dam
Surcharge volume 156MCM
Source: JICA Study Team
Annex-F 4.1.1 Location and Dimension of Angat Storage Dam
ANF-4-2
T_CAS
PAN01
T_AUR
CH0104
PAM0501
PAM0503
PAM0502
N
S
W E
0 5 km
Pantabangan storage dam
Catchment of Pantabangan storage dam + Masiway damA=869km2 Pantabangan Inflow
1) Self-catchment +Aurola trans-basinQin=38.4m3/s (1,195MCM/y)(observed average in 1980-2008)2) Casecnan trans-basin Qin=23.8m3/s(752MCM/y)(observed average in 2002-2008)
Effective storage volume = 2,775MCM
Aguang R.Canili
Diayo
Aurola trans-basin channel
Masiway dam
To Bongabon dam
Casecnan R.
Abaca
Denip
Catchment of diversion point of Casecnan trans-basinA=570km2
Catchment of diversion point of Aurola trans-basinA=68km2
Pampanga R.
Rizal dam
H=107m
EL 221m (Dry season)
(Veff=2,087MCM)
EL 170m (Veff=0MCM)
EL 216m (Wet season)
(Veff=1,757MCM)
EL 230m (Veff=2,775MCM)
Dead volume(225MCM)
Flood control volume
Conservation volume(Irrigation & Power)
1,757MCM 2,087MCM
330MCM
688MCM
Pantabangan dam
Surcharge volume
Source: JICA Study Team
Annex-F 4.1.2 Location and Dimension of Pantabangan Storage Dam
ANF-4-3
Annex-F 4.1.3 Location of Proposed Large Storage Dam Sites
ANF-4-4
Annex-F 4.2.1 Location Map of Existing NIS
ANF-4-5
UPRIISDiv-V
(16,879ha)
UPRIISDiv-I
(16,400ha)
UPRIISDiv-II
(22,591ha)
AMRISLeft Bank
(10,128ha)
AMRISRight Bank(16,663ha)
Pantabangan Dam
Masiway Dam
Rizal Dam
Angat DamBustos Dam
Super Diversion Canal
UPRIISDiv-I
(4,120ha)
Talavera Dam
Pam
pang
a R
iver
Maasim River
Manila bay
PDRIS(6,604ha)
Angat River
TASMORIS(4,200ha)
Tar
lac
Riv
er
O'D
onne
l Riv
er
Smoris Dam
Taris Dam
Porlac RIS(1,458ha)
Gumain RIS(1,629ha)
Gumain Dam
Solib Dam
Porlac Dam
Gumain River
Porlac River
Chi
co R
iver
Tal
aver
a R
iver
UPRIISDiv-III
(25,881ha) AuloSRIP
(810ha)
UPRIISDiv-IV
(19,924ha)
Aulo Dam
Aulo River
Penaranda River
PenarandaDam
Bongabon (Atate) Dam
Cong Dadong Dam
Source : JICA Study Team
Annex-F 4.2.2 Schematic Flow Diagram of Existing NIS
ANF-4-6
Annex-F 4.2.3 Location Map of CIS
ANF-4-7
Annex-F 4.2.4 Location Map of Small Scale Irrigations under BSWM
ANF-4-8
Annex-F 4.2.5 Location Map of Projected NIS
ANF-4-9
UPRIISDiv-V
(37,200ha)
UPRIISDiv-I
(16,400ha)UPRIIS
Div-II(22,591ha)
UPRIISDiv-III
(25,881ha) AuloSRIP
(810ha)
AMRISLeft Bank
(10,128ha)
AMRISRight Bank(16,663ha)
UPRIISDiv-IV
(19,924ha)
Pantabangan Dam
Masiway Dam
Rizal Dam
Aulo Dam
Angat DamBustos Dam
Super Diversion Canal
Aulo River
Penaranda River
UPRIISDiv-I
(4,120ha)
Talavera Dam
Pam
pan
ga R
iver
Maasim River
PenarandaDam
Bongabon (Atate) Dam
Manila bay
PDRIS(6,604ha)
Angat River
TASMORIS(39,150ha)
Tar
lac
Riv
er
O'D
onne
l Riv
er
Smoris Dam
Taris Dam
Porlac-Gumain
(16,750ha)
Gumain Dam
Solib Dam
Porlac Dam
Gumain River
Porlac River
Chi
co R
iver
Tal
aver
a R
iver
Balog-Balog Dam
Gumain Reservoir
Balintingon Dam
Balintingon(14,900ha)
Diversion Dam
Cong Dadong Dam
Existing Dam
Proposed Dam
Source : JICA Study Team
Annex-F 4.2.6 Schematic Flow Diagram of Projected NIS
ANF-4-10
Annex-F 4.3.1 Present Coverage of Water Supply Facilities for Access to Safe Drinking Water
ANF-4-11
Annex-F 4.3.2 Present Coverage of Level 3 Water Supply Facilities with Safe Water Access
ANF-4-12
Annex-F 4.3.3 Present Coverage of Sanitary Toilet
ANF-4-13
N
S
W E
0 1 km
Angat Storage DamAngat river
To Bustos dam
Ipo dam
Main Unit(200MW)
To MWSS
Main Pipe
Auxiliary Unit (46MW)
ReleaseRelease tto o IpoIpo1- HPP (Auxiliary Unit)2- Bypass3- Lower discharge pipe4- Spillway
Release to Release to BustosBustos1- HPP (Main Unit)
N
S
W E
0 1 km
Angat Storage DamAngat river
To Bustos dam
Ipo dam
Main Unit(200MW)
To MWSS
Main Pipe
Auxiliary Unit (46MW)
ReleaseRelease tto o IpoIpo1- HPP (Auxiliary Unit)2- Bypass3- Lower discharge pipe4- Spillway
Release to Release to BustosBustos1- HPP (Main Unit)
PAM0503
N
S
W E
0 1 km
PantabanganStorage Dam
Pampanga river
Power house-1(100MW)
Power house-2(12MW)
Masiway dam
Casec
nan
tran
s-ba
sin
tunn
el
CasecnanHydropower plant(150MW)
PAM0503
N
S
W E
0 1 km
PAM0503
N
S
W E
0 1 km
PantabanganStorage Dam
Pampanga river
Power house-1(100MW)
Power house-2(12MW)
Masiway dam
Casec
nan
tran
s-ba
sin
tunn
el
CasecnanHydropower plant(150MW)
Source: JICA Study Team
Annex-F 4.4.1 Existing Hydropower Plants in the Study Area
ANF-4-14
Annex-F 4.5.1 Completed Major Flood and Sediment Disaster Prevention Works
ANF-4-15
Annex-F 4.5.2 Hydrological Gauging and Repeater Stations for Completed and On-going Flood
Forecasting and Warning System in Pampanga River Basin
AN
F-4-16 Boundary of Study Area
Road
Widening of ThirdRiver Channel(PHUMP Phase IV)
Excavation ofPasac River(PHUMPPhase IV)
Construction ofPorac-GumainDiversion Channel(PHUMP Phase III)
Channel Excavation /Dredging(PHUMP Phase III)
DrainageImprovement for SanFernando River(PHUMP Phase IV)
Ara
yat-
Apa
lit-
Mas
anto
l(E
xist
ing)
Setb
ack
Leve
e
Hagonoy-Calumpit-PlaridelLevee (Existing)
Widening/Construction ofLevee for Pmapanga River(PDDP FC Phase III)
Widening/Construction ofLevee for Angat River(PDDP FC Phase II)
Widening/Construction ofLevee for Pmapanga River(PDDP FC Phase II)
Widening/Construction ofLevee for Pmapanga River(PDDP FC Phase I)Completed
Widening/Construction ofLevee for Bagbag River(PDDP FC Phase II)
Widening/Construction ofLevee for LabanganFloodway(PDDP FC Phase II)
Eastern Megadike
Western M
egadike
Pasig-Potrero River
Transvere
se
Dike
G. S. O
. Roa
d
Tail Road
Abacan River
San F
ernan
do
River
Porac-Gumain River
Bebe San EasterbanShort Cut Channel
Pasa
c R
iver
Pam
pang
a R
iver
Lab
anga
n F
lood
wa y
Angat River
Pam
pang
a R
ive r
Porac River
Gum
ain River
Manila Bay
Source: PHUMB-Phase II, Monitoring and Pllaning ofFlood Control Works on Pasac Delta and Third RiverChannel,JICA,2002
Completed FloodMitigation Project
On-going and Proposed FloodMitigation Project
LEGEND
River
Annex-F 4.5.3 On-going and Proposed Structural Flood Mitigation Works in Pampanga River Basin
AN
F-5-1
.1.3Institutional-Setup for Water Resources Management
T Legislative Arrangements
5.2 Present Organization Setup
Source: Philippine Water Supply Sector Road Map, p.19, modified by JICA study
Annex-F 5.2.1 Functional Chart of Water Related Agencies in the Philippines
Policy Making & Planning
NEDA
Coordination / Regulation
NWRB
Integrated Area Development
LLDA RDCs BOI PEZA
RBCO
Watershed Management
FMB BSWM NIA NPC
PAWB
Water Quality & Sanitation
EMB DOH BRL EHS LGUs MWSS LWUA-WDs
Irrigation
NIA DA BSWM
Hydro Power
DOEPSALM NPC PEMC
Water Supply
NAPC-WASCO DOF-CDA
DBP DAR DPWHMWSS LWUA-WDs PTAHUDCC DILG-PMO
PEZALGU’s
Data Collection
NWRB BRS NAMRIALWUA MGBPAGASA
MWSS NIA
Research
DOST-PCAFNRRD ERDB
Cloud Seeding
PAF BSWM
Flood Management
DPWH-PMO OCD-NDCC
PAGASA MMDA
Fisheries & Recreation
BFAR PTA
Ports & Navigation
PPA
DENR NEDA DOF DOJ DOH
NHRC Exec. Dir., NWRB
Members
AN
F-5-2
Function of Local Government
OFFICE OF THE PRESIDENT
DBM Budgeting
DOF Funding
Water Users
DILG DOH DPWH DA DENR Environment
& Watershed
DOE
FMB
NEDA Planning
MGB EMB
Regional Offices
PMOPMONIA NPC NEA
Hydropower Dam
Office
Regional Irrigation
Office
Regional Office
Regional Health Office
LWUA
Urban Water
Districts
Provincial Hospital
District Engineer’s
Office
MWSSPLG OO
RENRO
PENRO
CENRO
Provincial Infrastructures
(Roads, Utilities, Flood Control, Irrigation, etc.)
Concessionaries in
Metro ManilaMLG OOCLG OO
NWRB Water Rights & Regulation
of CPC Holders
Municipal/ City
LGUs
LGUs
Water Supply
ProvidersLGU Owned/
Operated
Provincial Health Office
Rural Health Office
Sanitation & Water Quality Control
Irrigation Management Office (IMO)
ERDBPAWB
Communal Irrigation System
Annex-F 5.2.2 Functional Relationship among Central Government Agencies and Local Governments Source; JICA Study Team
AN
F-5-3
Annex-F 5.2.3 Organizational Chart of Province of Pampanga
AN
F-5-4
Annex-F 5.3.1 Flowchart for Processing of Water Permit Application Source: NWRB
File ApplicationWith Documents
Agriculture Purpose
Hydropower Industrial Purpose
DomesticPurpose
RecreationalFisheriesPurpose
DrainagePurpose
Determine Compliance w/ requirements
Posting of Application
Is thereProtest?
Hearings Adjudication/ Decision by the Board
Technical Appraisal by Deputized Agencies
Obtain clearance From other agencies
In favor ofApplicant?
Return Application
Papers
Is source fromGroundwater?
Issue Permitto Drill
Submit welldata toNWRB
TechnicalEvaluation byNWRB staff
NWRB staffrecommendedTo the Board
Board Decides
Approved?
Issue WaterPermit
1.
2.
7. 8.
9.
10. 11. 12.
13.
14.
15.
16.
17.18.Yes
No
No
Yes
No
Yes
Yes
ANF-5-5
Note: Values in ( ) indicate staff number/position.
Policy and
Program WaterRight
Water Utilities
Monitoring and
Enforcement
Administrative and
Financial Engineer 10 4 - 11 - Special investigator - 5 - - - Planning officer 1 - - - - Development management officer
- - - 2 -
Instrument technician - - - 4 - Information analyst 3 - - - - Statistician 1 - - - - Economist 3 - - - - Financial analyst - - 3 - - Regulation officer - - 7 - - Attorney - 1 - - - Administrative 4 3 2 1 30 Total (95+8=103)
22 13 12 18 30
Annex-F 5.3.2 Organization Chart of Present NWRB as of March 2009 Source: NWRB
Board of Director
Office of ExecutiveDirector
(8/9)
Policy and Program Division
( 22 / 26 )
Water Right Division ( 13 / 18 )
Water UtilitiesDivision(12 /15 )
Monitoring andEnforcement
Division (18 /25 )
Administrative andFinancial Division
( 30 / 33 )
Policy and Formulation Section
Permit Section
Registration andLicensing Section
Operation andMonitoring Section
General Service Section
Program Evaluation and Coordination
Complaint and Investigation Section
Water RateRegulation System
Water MeterCalibration Section
Personnel and Records Section
Water Resources Assessment and Section
Evaluation Section
Litigation andAdjudicationSystem
Enforcement Section
Budget and Accounting Section
Water Resources Information Section
Litigation and Adjudication Section
Systems andAccounts Section
Evaluation Section Collection and Disbursement Section
ANF-5-6
Source: Proposal to DBM, NWRB
Annex-F 5.3.3 NWRB’s Proposed Organizational Structure as of March 2009
AN
F-5-7
Annex-F 5.3.4 NWRB's Proposed Organizational Structure, September 2010
Office of the Executive Director/Deputy Exec. Director Staff
Management Information System Staff
Internal Audit Staff
Public Affairs Information Staff
Note: Note:
FinancialMonitoringSection
TariffRegulationSection
NWRB BOARD
Financial & Administrative Office
Office of the Deputy Executive Director
Office of the Executive Director
Composed of poolof lawyers,LLB graduates andstenographers
Legal Division
Legal & AdjudicationService
Policy, Coordination &Integration Service
Resource RegulationService
Composed of poolof lawyers, LLBgraduates andstenographers
Economic RegulationService
Adjudication DivisionPolicy and Program
Division
River BasinDevelopment
Division
Water RightsDivision
Standards &Compliance Division
TechnicalRegulation Division
Financial RegulationDivision
PolicyFormulationSection
Assessment &Water PricingSection
Human Resources Management & Records Section
Finance Section
Treasury Section
General Services Section
StandardsMonitoringSection
ReservoirRegulation andMonitoringSection
TechnicalInvestigation &EnforcementSection
Registration &LicensingSection
TechnicalOperationsSection
Consumer Affairsand ComplianceSection
ProjectManagementSection
River BasinInstitutionalDevelopmentSection
River Basin ProjectPlanning &ImplementationSection
River BasinCapacity Dev'tSection
PermitSection
TechnicalEvaluationSection
ProgramEvaluation &CoordinationSection
ANF-6-1
Annex-F 6.5.1 Land Classification vs. Land Cover Over Forest Lands in the Study Area 2005
ANF-6-2
Annex-F 6.7.1 Evaluation of Groundwater Usage Condition in Present Condition (2008)
ANF-6-3
Annex-F 6.7.2 Evaluation of Groundwater Usage Condition in Future Condition (2025)
ANF-12-1
Annex-F 12.4.1 Organization Structure of Regional Development Council of Region III
RGC-MC: Regional Government Center Management Committee RKCG: Regional KALAHI Convergence Group RLUC: Regional Land Use Committee RPC: Regional Productivity Committee RPMC: Regional Project Monitoring Committee RSCC: Regional Statistical Coordination Committee PDAC: Project Development Assistance Committee
Source: Handbook of the Regional Development Council III (RDC III) Central Luzon Region, Revised August 2006, p26 & pp. 1-25
SCDA SCED SCID SCSD
RGC-MC §4.4
RPMC §4.8 RKCG
§4.5 RSCC §4.9 RLUC §4.6 PDAC §4.10 RPC §4.7
Balik MacArthur Solid Waste Mgmt
All provincial governors and city mayors, mayors of municipalities designated as provincial capitals,
and mayors of municipalities designated as regional center;
All presidents of the provincial league of mayors
RDC III Full Council
The Regional Directors of agencies represented in the National Economic and
Development Authority Board (NEDA, DAR, DA, DBM, DENR, DOF, DFA,
DOH, DILG, DOLE, DPWH, DOST, DTI, DOTC, BSP) and the Regional Directors
of DECs, DSWD and DOT. Secretary
Accredited private sector based in the
region
Private Sector Public Sector
Accredited NGOs based in the region
LGUs: The provinces of Tarlac, Nueva Ecija, Pampanga, Zambales, Bulacan and Bataan, and the cities of Angeles, Cabanatuan, Olongapo, Palayan and San Jose (Nueva Ecija) with San Fernando, Pampanga as the Regional Center.
Regional Line Agencies (RLAs): NEDA, DTI, DA,
DAR, DENR, DPWH, DepEd, TESDA, NIA
RDC III Full Council
Executive Committee
Advisory Committee
Sectoral Committees
Special Committees
Task Forces
§4.3
§4.1
§4.2
SECCOMs
members
SC: Sectoral Committee DA: Development Administration ED: Economic Development ID: Infrastructure Development SD. Social Development
AN
F-12-2
Source: RBCO-DENR, January 2010
Annex-F 12.4.2 RBO under of RBCO and Satellite RBCO, Manila Bay Site Coordination Committee
DENR Secretary
Undersecretary
Assistant Secretary for RBO
Executive Director RBCO
NWRB
FMB (Forest Management Bureau)
LMB (Land Management Bureau)
MGB (Mine and Geosciences Bureau)
PAWB (Protected Areas and Wildlife Bureau)
EMB (Environmental Management Bureau)
ERDB (Ecosystems Research and Development Bureau)
Region I Region II Region III Regional Executive
Director
Region XIII
FMB EMB PAWBMGB
RBCO - PMO
RBO RBO
River Basin Site Coordination Committee
FMB EMB PAWB MGB LMB
RBCO - PMO
RBCO: Manila Bay Site Coordination Committee
RBO Pampanga(Proposed)
RBO DENR DPWH DADILG
NIA
…
(satellite)
(satellite)
Chairman
NCR Region IV-A
Manila Bay RBCO
ERDB
ANF-12-3
Seccoms
Secretariat(NEDA III)
RegionalDevelopment Council
(RDC) III
River BasinsCommittee
Policy & Coordination
GOCCs
LGUs RLAs
ExecutingUnits
RegionalDevelopment Council
(RDC) III
SCSDSCID SCED SCDA River Basins Committee
Provincial RiverBasin
Sub-committees
River Basins Committee(Chair: Provincial GovernorMembers: Provincial governors, Regional Directors of the Technical Secretariat, NGOs, Pos, Private Sector, etc.)
Provincial RiverBasin
Sub-committees
Technical Secretariat(NEDA, DENR, NWRB, DPWH, DOH, etc.)
Policy-making & InvestmentCoordination
The relationship of the RDC III – RBC
vis-à-vis the regular frontline agencies
Roles & Functions: Policy coordination & Decision-making body in the region: Formulation of development plans & Investment Programs; Project monitoring; Budgeting & investment programming
Roles & Functions: Formulation of agency plans and programs; Implementation of plans and programs
Annex-F 12.4.3 Proposed creation of a Committee on River Basins under the Regional Development
Council (RDC) III
ANF-12-4
Note: PRBC and EC are multi-sectoral, led by the Chair, a representative of LGUs in
Region III.
A representative of PRBC or EC is elected by the member of PRBC and EC
respectively
Source: JICA Study Team
Annex-F 12.4.4 Independent Pampanga River Basin Council
Pampanga River Basin Council (PRBC)
Executive Committee (EC)
Financial and Administrative Office Secretariat
TWG for monitoring water rights regulation and enforcement (surface water and groundwater)
Chair – NWRB Co-Chair – a representative of LGUs
TWG for monitoring water quality, ecosystems and sanitation
Chair – DENR Co-chair – a representative of LGUs
TWG for monitoring watershed and forest management
Chair – DENR Co-chair – a representative of LGUs
TWG for collecting O&M costs for the council, river facilities and monitoring facilities
Chair – DBM Co-chair – a representative of LGUs
TWG for monitoring O&M of river facilities for flood control
Chair – DPWH Co-chair – a representative of LGUs
AN
F-12-5
Source: JICA Study Team
Annex-F 12.4.5 Position of NWRB for Water Rights Regulation among RBCO and RBO
(LGUs)
NWRB
Office of the Executive Director Deputy Executive Director
Policy, Coordination & Integration Service
Resource Regulation Service
Economic Regulatory Service
Policy & Program Division
River Basin Development
Division
Water Rights
Division
Standards Compliance
Division
Technical Regulation Division
Financial Regulation Division
NIA, LLDA, Selected WDs, Selected RBOs
(deputize water permit acceptance and monitoring)
Alternative-2: Deputize water Permit acceptance & monitoring
RBO Pampanga (Proposed)
Alternative-1
O&M of River facilities(Alternative-2)
RDC Region III
Regional Office
DENR RBCO
Other Agencies
DPWH
Regional Office
District Engineer’s
Office
Provincial Infrastructures
(Roads, Utilities, flood control,
Irrigation, etc.)
O&M of River Facilities
(Alternative-1)
PMO
FMB
Direct Issue of Water Permit
Manila Bay Site Coordination Committee