analisis de costos vial 2

23
OBRAS DE ARTE Y DRENAJE EXCAVACION AREA (m2) ANCHO (m) VOLUMEN (m3) Baden 0.385 20 7.7 6.2757 2 12.5514 MATERIAL DE RELLENO AREA (m2) ANCHO (m) VOLUMEN (m3) Baden 1.8178 20 36.356 4.027 2 8.054 ENCONFRADO LONGITUD (m) ALTURA (m) TOTAL (m2) Baden 60 0.45 27 10 0.9 9 36 2 4.5 9 2.4 4.5 10.8 2 0.09 0.18 19.98 CONCRETO Baden ( f`c = 210 kg/cm2) AREA (m2) ANCHO (m) TOTAL(m3) Baden 3.0625 20 70 Enboquillado de Piedra LONGITUD (m) ANCHO (m) TOTAL (m2) 3.5 20 70 Concreto Ciclopeo fc= 100 kgf/cm2 +30% de PG SECCION AREA (m2) FONDO (m) VOLUMEN (m3) A1 0.8232 2 1.6464 A2 4.3527 2 8.7054 A3 1.5 2 3 TOTAL 13.3518 Muro de Contension Muro de Contension Muro de Contension

Upload: alvaro-marquez

Post on 28-Nov-2015

24 views

Category:

Documents


2 download

DESCRIPTION

analisis de costos vial

TRANSCRIPT

Page 1: Analisis de Costos VIAL 2

OBRAS DE ARTE Y DRENAJE

EXCAVACION

AREA (m2) ANCHO (m) VOLUMEN (m3)

Baden0.385 20 7.7

6.2757 2 12.5514

MATERIAL DE RELLENO

AREA (m2) ANCHO (m) VOLUMEN (m3)

Baden 1.8178 20 36.356

4.027 2 8.054

ENCONFRADO

LONGITUD (m) ALTURA (m) TOTAL (m2)

Baden60 0.45 2710 0.9 9

36

2 4.5 92.4 4.5 10.82 0.09 0.18

19.98

CONCRETOBaden ( f`c = 210 kg/cm2)

AREA (m2) ANCHO (m) TOTAL(m3)Baden 3.0625 20 70

Enboquillado de Piedra

LONGITUD (m) ANCHO (m) TOTAL (m2)3.5 20 70

Concreto Ciclopeo fc= 100 kgf/cm2 +30% de PG

SECCION AREA (m2) FONDO (m) VOLUMEN (m3)A1 0.8232 2 1.6464A2 4.3527 2 8.7054A3 1.5 2 3

TOTAL 13.3518

Muro de Contension

Muro de Contension

Muro de Contension

Page 2: Analisis de Costos VIAL 2

ANALISIS DE COSTOS UNITARIOS

PROYECTO: CONSTRUCCION DE CARRETERA ANCASH ETAPA KM 0+00 KM 1+00Fuente: Revista Constructivo Abril 2012 Costos y Tiempos ( Walter Ibañez)

ITEM DESCRIPCION UNID PARCIAL s/. TOTAL s/.

01.02.00MOVILIZACIÓN Y DESMOVILIZ. Glb. T (dias) = 4 21952.21

EQUIPO MÍNIMO

A.- EquipoTransportado Cant Peso (tn) Peso Tot Aq. Unit Aq. Tot

Compresora Neum. 125-175PCM-76HP 1 2.000 2.000 34.20 34.20

Compresora Neum. 700-800PCM 240HP 2 5.000 10.000 128.30 256.60

Martillo neumático 29Kg 8 0.029 0.232 12.20 97.60

Cargador s/llantas 125 HP 2-2,25 YD3 2 10.308 20.616 179.01 358.02

Cargador s/llantas 160-195 HP 3,5 YD3 4 18.585 74.340 197.58 790.32

Tractor de orugas de 140-160 HP 1 14.900 14.900 163.60 163.60

Tractor de orugas de 190-240 HP 3 20.520 61.560 230.30 690.90

Vibrador de concreto 4 HP 2,40" 1 0.050 0.050 5.90 5.90

Plancha compactadora 5,8 HP 2 0.145 0.290 18.83 37.66

Rodillo liso vibr. Autop. 101-135 HP 10-12 T 2 11.100 22.200 70.20 140.40

Rodillo neumático autop. 81-100 HP 5,5-20 2 5.500 11.000 85.20 170.40

Rodillo Tandem Estatic. Aut. 58-70 HP 8-10 2 8.800 17.600 53.40 106.80

Tractor de tiro MF265 de 63 HP 1 3.415 3.415 41.20 41.20

Chancadora prim. Secund. 5 fajas 75 HP 46- 1 39.000 39.000 218.46 218.46

Zaranda vibratoria 4"x6"x14" ME 15HP 1 7.000 7.000 19.09 19.09

Mezcladora concreto tambor 23 HP 11p3 1 2.700 2.700 15.05 15.05

Motoniveladora de 125 HP 2 11.515 23.030 113.48 226.96

Barredora Mecánica 10-20 HP 1 1.000 1.000 31.30 31.30

Calentador de aceite 5 HP 468 p3 1 5.700 5.700 26.50 26.50

Planta de asfalto en caliente 60-115 Ton/H 1 32.350 32.350 1148.08 1148.08

COEF. APORTE

PRECIO UNITARIO

Page 3: Analisis de Costos VIAL 2

Secador aridos. 2-ME 70 HP 60-115 Ton/H 1 8.500 8.500 30.15 30.15

Pavimentadora sobre orugas 69 HP 10-16" 1 12.000 12.000 62.00 62.00

Faja transport. 18"x4" ME 3KW 150 Ton/H 2 4.000 8.000 9.69 19.38

Grupo Electrógeno 116 HP 75 KW 2 1.500 3.000 54.03 108.06

Grupo Electrógeno 89 HP 50 KW 2 1.150 2.300 46.40 92.80

Teodolito 1 0.008 0.008 8.80 8.80

Nivel topográfico automático 1 0.005 0.005 6.90 6.90

Maquina soldadora inversora 300 A 1 0.050 0.050 7.63 7.63

Jalón 1 0.004 0.004 0.15 0.15

Miras metálicas 3 0.005 0.015 0.20 0.60

382.87 4915.51

Flete = 7657.30

B.- Equipo Autotransportado Alquiler (40%) = 7864.82

Camioneta Pick-UP 4x2 2cab. 90 HP 0,75 2 1.850 3.700 44.85 89.70

Camión Cisterna 4x2 (agua) 2000 gal 2 13.000 26.000 76.87 153.74

Camión Volquete 6x4 330 HP 10 M3 5 26.000 130.000 153.14 765.70

Camión Imprimador de 1800 gal 1 16.475 16.475 99.47 99.47

176.17 1108.61

Alquiler = 4434.44

Limpieza (2% del costo) = 399.13

MATERIALES 1596.52

Flete terrestre Tn 20.00

Inst. y Desarmo de Plantas (8% del costo) =

Page 4: Analisis de Costos VIAL 2

METRADO DE SEÑALIZACION

KILOMETRAJE (m) PREVENTIVA REGLAMENTARIA INFORMATIVA ESPECIFICACIONES

00.000 20,000 120,000 40,00040,000 60,00060,000 80,00080,000 100,000

100,000 120,000120,000 140,000140,000 151,215 1

151,215 160,000160,000 180,000180,000 200,000200,000 215,082215,082 220,000220,000 240,000240,000 260,000260,000 280,000280,000 300,000300,000 320,000 1 Baden (P-34)

320,000 324,766324,766 340,000340,000 360,000360,000 380,000380,000 389,194389,194 400,000400,000 420,000420,000 440,000 1

440,000 460,000460,000 480,000480,000 500,000500,000 516,341 1 Curva a la Derecha

516,341 520,000520,000 540,000540,000 560,000560,000 580,000580,000 597,146597,146 600,000600,000 620,000 1 Destino (I-5)

620,000 640,000640,000 660,000660,000 680,000680,000 700,000700,000 720,000

Velocidad Maxima (R-30)

Curva Pronunciada a la Derecha (P-

1B)

Curva a la Izquierda

Page 5: Analisis de Costos VIAL 2

720,000 735,164735,164 740,000740,000 755,458 1

755,458 760,000760,000 780,000780,000 800,000800,000 820,000820,000 840,000840,000 860,000 1

860,000 880,000880,000 900,000900,000 920,000920,000 940,000940,000 960,000960,000 980,000 1

980,000 989,588989,588 1,000,000

Zona de Derrumbes (P-37)

Curva pronunciada a la Izquierda

Velocidad Maxima (R-30)

Page 6: Analisis de Costos VIAL 2

ANÁLISIS DE COSTOS UNITARIOS

PROYECTO: CONSTRUCCIÓN DE CARRETERA : SALPO - LA LIBERTAD

IETAPA KM 85+00 KM 86+00

Funete: Revista Constructivo SEPTIEMBRE 2012 Costos y Tiempos

ÍTEM DESCRIPCIÓN UNID PARCIAL s/.

01.00.00 OBRAS PRELIMINARES

01.01.00 CARTEL DE OBRA 7.20x3.60 m Und.

MANO DE OBRA Rend. = 0.40

0.1 Capataz A hh 2.000 18.93 37.86

2.0 Peón hh 40.000 10.81 432.40

MATERIALES

Cemento Portland tipo I "SOL" bol 0.900 16.94 15.25

Clavo con cabeza para madera kg 1.000 3.20 3.20

Hormigón m3 0.360 35.30 12.71

Madera tornillo cepillado p2 70.000 2.84 198.80

Perno hexag.rosca corri.G-2 31/2"X3/8" ct 9.000 24.51 220.59

Pintura esmalte sintético standard gln 0.432 63.36 27.37

Triplay 8 m.m. un 8.640 26.93 232.68

01.02.00 MOVILIZACIÓN Y DESMOVILIZ. Glb. T (dias) = 4

EQUIPO MÍNIMO

A.- EquipoTransportado Cant Peso (tn) Peso Tot Aq. Unit

Barredora mecanica 10-20HP 1 2.000 2.000 34.20

Compactador Vibratorio tipo plancha 5,8 HP 1 0.029 0.029 12.20

Chancadora primaria 15x24 M.E. 30HP 1 10.308 10.308 179.01

Vibrador de concreto 4 HP 2,40" 1 18.585 18.585 197.58

Tractor de orugas de 140-160 HP 1 14.900 14.900 163.60

Tractor de tiro MF 290/480 HP 1 20.520 20.520 230.30

Cocina de asfalto 320 GLNS 1 0.050 0.050 5.90

Rodillo liso vibr. Autop. 101-135 HP 10-12 T 1 11.100 11.100 70.20

Rodillo neumático autop. 81-100 HP 5,5-20 T 1 5.500 5.500 85.20

Fresadora 565 HP 1 3.415 3.415 41.20

Grupo electrogeno 140 HP 1 39.000 39.000 218.46

Mezcladora concreto tambor 23 HP 11p3 1 2.700 2.700 15.05

Motoniveladora 130-135 HP 1 11.515 11.515 113.48

Compresora neumatica 93 HP 1 1.000 1.000 31.30

Equipo de pintar 30GLNS 1 5.700 5.700 26.50

Planta de Asfalto en caliente 150 Tn/hr 1 32.350 32.350 1148.08

Secador aridos. 2-ME 70 HP 60-115 Ton/H 1 8.500 8.500 30.15

Pavimentadoras sobre orugas 105 HP 1 12.000 12.000 62.00

Martillo neumatico 21-24 KG 1 4.000 4.000 9.69

Perforadora sobre orugas 660-690 PCM 1 0.008 0.008 8.80

Cargador frontal sobre oruga 150-180 HP 1 0.005 0.005 6.90

203.19

COEF. APORTE

PRECIO UNITARIO

Page 7: Analisis de Costos VIAL 2

Flete =

B.- Equipo Autotransportado Alquiler (40%) =

Camioneta pick up 4x2 2cab 84 HP 2 1.850 3.700 44.85

Camión Cisterna 4x2 (agua) 2000 gal 2 13.000 26.000 76.87

Camión Volquete 4x2 210 - 280 HP 5 26.000 130.000 153.14

Camion imprimador 84 HP 1 16.475 16.475 99.47

176.17

Alquiler =

Limpieza (2% del costo) =

MATERIALES Inst. y Desarmo de Plantas (8% del costo) =

Flete terrestre Tn 20.00

01.03.00 ROCE Y DESFORESTACIÓN Ha

MANO DE OBRA Rend. = 0.70

0.5 Capataz B hh 5.7143 16.22 92.69

4.0 Peón hh 45.7143 10.81 494.17

EQUIPO

1.0 Tractor de orugas de 140-160 HP hm 11.4286 163.60 1869.71

Herram. (3% MO) % 0.0300 586.86 17.61

01.05.00 TRAZO Y REPLANTEO m2

MANO DE OBRA Rend. = 600.00

0.1 Capataz A hh 0.0013 18.93 0.03

1.0 Operario hh 0.0133 13.52 0.18

2.0 Peón hh 0.0267 10.81 0.29

EQUIPO

Herram. (3% MO) % 0.0300 0.49 0.01

MATERIALES

Madera Tornillo en bruto p2 0.0300 2.42 0.07

Yeso 20kl bol 0.0150 9.50 0.14

02.00.00 EXPLANACIONES

02.01.00 EXCAVACIÓN NO CLASIFICADA

02.01.01 Corte de Material Suelto m3

MANO DE OBRA Rend. = 460.00

0.2 Capataz B hh 0.0035 16.22 0.06

0.2 Controlador (of.) hh 0.0035 11.97 0.04

2.0 Peón hh 0.0348 10.81 0.38

EQUIPO

1.0 Tractor de orugas de 140-160 HP hm 0.0174 163.60 2.85

Herram. (3% MO) % 0.0300 0.47 0.01

02.01.02 Corte de Roca Suelta m3

a) Perforación y Disparo

MATERIALES (50% requiere explosivos) Rend. = 460.00

Dinamita 0,2 Kg/m3x0,5 Kg 0.1000 7.25 0.73

Fulminante 1 Und/m3x0,5 Un 0.5000 0.48 0.24

Mecha 1 Ml/m3x0,5 Ml 0.5000 0.48 0.24

Page 8: Analisis de Costos VIAL 2

Barreno 5'x1/8" 5m/m3x0,5/600m/Unid Un 0.0040 780.43 3.12

MANO DE OBRA

0.5 Capataz B hh 0.0087 16.22 0.14

0.5 Controlador (Of.) hh 0.0087 11.97 0.10

2.0 Perforistas (Of.) hh 0.0348 11.97 0.42

2.0 Peón hh 0.0348 10.81 0.38

EQUIPO

1.0 Compresora Neum. 125-175PCM-76HP hm 0.0174 34.20 0.59

1.0 Compresora Neum. 700-800PCM 240HP hm 0.0174 128.30 2.23

2.0 Martillo Neumático 29 Kg hm 0.0348 12.20 0.42

Herram. (3% MO) % 0.0300 1.04 0.03

b) Excavación, Desquinche y Peinado

MANO DE OBRA Rend. = 370.00

0.2 Capataz B hh 0.0043 16.22 0.07

4.0 Peón hh 0.0865 10.81 0.93

EQUIPO

1.0 Tractor de orugas de 140-160 HP hm 0.0216 163.60 3.54

Herram. (3% MO) % 0.0300 1.01 0.03

02.01.03 Corte de Roca Fija m3

a) Perforación y Disparo

MATERIALES Rend. = 260.00

Dinamita 0,25 Kg/m3 Kg 0.2500 7.25 1.81

Fulminante 1 Und/m3 Un 1.0000 0.48 0.48

Mecha 1 Ml/m3 Ml 1.0000 0.48 0.48

Barreno 5'x1/8" 5m/m3/300m/Unid Un 0.0167 780.43 13.03

MANO DE OBRA

0.5 Capataz B hh 0.0154 16.22 0.25

0.5 Controlador (Of.) hh 0.0154 11.97 0.18

2.0 Perforistas (Of.) hh 0.0615 11.97 0.74

2.0 Peón hh 0.0615 10.81 0.67

EQUIPO

1.0 Compresora Neum. 125-175PCM-76HP hm 0.0308 34.20 1.05

1.0 Compresora Neum. 700-800PCM 240HP hm 0.0308 128.30 3.95

2.0 Martillo Neumático 29 Kg hm 0.0615 12.20 0.75

Herram. (3% MO) % 0.0300 1.84 0.06

b) Excavación, Desquinche y Peinado

MANO DE OBRA Rend. = 370.00

0.2 Capataz B hh 0.0043 16.22 0.07

4.0 Peón hh 0.0865 10.81 0.93

EQUIPO

1.0 Tractor de orugas de 140-160 HP hm 0.0216 163.60 3.54

Herram. (3% MO) % 0.0300 1.01 0.03

S/N. A Riego m3

MANO DE OBRA Rend. = 89.58

Distancia Media calculada (d=0.466KM)

0.5 Peón hh 0.0447 10.81 0.48

Page 9: Analisis de Costos VIAL 2

EQUIPO

1.0 Cisterna 2000 gln hm 0.0893 76.87 6.86

02.01.04 Conformación de Terraplenes (e=0,25) m3

MATERIALES Rend. = 790.00

Agua m3 0.100 7.35 0.73

MANO DE OBRA

1.0 Capataz B hh 0.0101 16.22 0.16

6.0 Peón hh 0.0608 10.81 0.66

EQUIPO

1.0 Motoniveladora de 125 HP hm 0.0101 113.48 1.15

1.0 Rodillo liso vibr. Autop. 101-135 HP 10-12 T hm 0.0101 70.20 0.71

0.5 Tractor de orugas de 140-160 HP hm 0.0051 163.60 0.83

Herram. (3% MO) % 0.0300 0.82 0.02

02.01.05 Perfilado y Comp. De la Sub-rasante m2

MATERIALES Rend. = 2420.00

Agua m3 0.030 7.35 0.22

MANO DE OBRA

1.0 Capataz B hh 0.0033 16.22 0.05

4.0 Peón hh 0.0132 10.81 0.14

EQUIPO

1.0 Motoniveladora de 125 HP hm 0.0033 113.48 0.38

1.0 Rodillo liso vibr. Autop. 101-135 HP 10-12 T hm 0.0033 70.20 0.23

Herram. (3% MO) % 0.0300 0.20 0.01

02.02.00 Remoción de Derrumbes m3

MANO DE OBRA Rend. = 310.00

0.5 Capataz B hh 0.0129 16.22 0.21

4.0 Peón hh 0.1032 10.81 1.12

EQUIPO

1.0 Tractor de orugas de 140-160 HP hm 0.0258 163.60 4.22

Herram. (3% MO) % 0.0300 1.33 0.04

Page 10: Analisis de Costos VIAL 2

ANÁLISIS DE COSTOS UNITARIOS

PROYECTO: CONSTRUCCIÓN DE CARRETERA : SALPO - LA LIBERTAD

IETAPA KM 85+00 KM 86+00

TOTAL s/.

1180.85

470.26

710.59

14082.00

Aq. Tot

34.20

12.20

179.01

197.58

163.60

230.30

5.90

70.20

85.20

41.20

218.46

15.05

113.48

31.30

26.50

1148.08

30.15

62.00

9.69

8.80

6.90

2689.80

Page 11: Analisis de Costos VIAL 2

4063.70

4303.68

89.70

153.74

765.70

99.47

1108.61

4434.44

256.04

1024.15

2474.18

586.86

1887.32

0.72

0.49

0.01

0.22

48.84

3.33

0.47

2.86

13.22

4.33

Page 12: Analisis de Costos VIAL 2

1.04

3.28

1.01

3.57

28.02

15.81

1.84

5.81

1.01

3.57

7.35

0.48

Page 13: Analisis de Costos VIAL 2

6.86

4.27

0.73

0.82

2.71

1.03

0.22

0.20

0.61

5.59

1.33

4.26

Page 14: Analisis de Costos VIAL 2

ANÁLISIS DE COSTOS UNITARIOS

PROYECTO: CONSTRUCCIÓN DE CARRETERA : SALPO - LA LIBERTAD

IETAPA KM 85+00 KM 86+00

Funete: Revista Constructivo SEPTIEMBRE 2012 Costos y Tiempos

ÍTEM DESCRIPCIÓN UNID

01.00.00 OBRAS PRELIMINARES

01.01.00 CARTEL DE OBRA 7.20x3.60 m Und.

MANO DE OBRA Rend. = 0.40

0.1 Capataz A hh 2.000 18.93

2.0 Peón hh 40.000 10.81

MATERIALES

Cemento Portland tipo I "SOL" bol 0.900 16.94

Clavo con cabeza para madera kg 1.000 3.20

Hormigón m3 0.360 35.30

Madera tornillo cepillado p2 70.000 2.84

Perno hexag.rosca corri.G-2 31/2"X3/8" ct 9.000 24.51

Pintura esmalte sintético standard gln 0.432 63.36

Triplay 8 m.m. un 8.640 26.93

01.02.00 MOVILIZACIÓN Y DESMOVILIZ. Glb. T (dias) =

EQUIPO MÍNIMO

A.- EquipoTransportado Cant Peso (tn) Peso Tot

Barredora mecanica 10-20HP 1 2.000 2.000

Compactador Vibratorio tipo plancha 5,8 HP 1 0.029 0.029

Chancadora primaria 15x24 M.E. 30HP 1 10.308 10.308

Vibrador de concreto 4 HP 2,40" 1 18.585 18.585

Tractor de orugas de 140-160 HP 1 14.900 14.900

Tractor de tiro MF 290/480 HP 1 20.520 20.520

Cocina de asfalto 320 GLNS 1 0.050 0.050

Rodillo liso vibr. Autop. 101-135 HP 10-12 T 1 11.100 11.100

Rodillo neumático autop. 81-100 HP 5,5-20 T 1 5.500 5.500

Fresadora 565 HP 1 3.415 3.415

Grupo electrogeno 140 HP 1 39.000 39.000

Mezcladora concreto tambor 23 HP 11p3 1 2.700 2.700

Motoniveladora 130-135 HP 1 11.515 11.515

Compresora neumatica 93 HP 1 1.000 1.000

Equipo de pintar 30GLNS 1 5.700 5.700

Planta de Asfalto en caliente 150 Tn/hr 1 32.350 32.350

Secador aridos. 2-ME 70 HP 60-115 Ton/H 1 8.500 8.500

Pavimentadoras sobre orugas 105 HP 1 12.000 12.000

Martillo neumatico 21-24 KG 1 4.000 4.000

Perforadora sobre orugas 660-690 PCM 1 0.008 0.008

Cargador frontal sobre oruga 150-180 HP 1 0.005 0.005

203.19

COEF. APORTE

PRECIO UNITARIO

Page 15: Analisis de Costos VIAL 2

B.- Equipo Autotransportado Alquiler (40%) =

Camioneta pick up 4x2 2cab 84 HP 2 1.850 3.700

Camión Cisterna 4x2 (agua) 2000 gal 2 13.000 26.000

Camión Volquete 4x2 210 - 280 HP 5 26.000 130.000

Camion imprimador 84 HP 1 16.475 16.475

176.17

Limpieza (2% del costo) =

MATERIALES Inst. y Desarmo de Plantas (8% del costo) =

Flete terrestre Tn

01.03.00 ROCE Y DESFORESTACIÓN Ha

MANO DE OBRA Rend. = 0.70

0.5 Capataz B hh 5.7143 16.22

4.0 Peón hh 45.7143 10.81

EQUIPO

1.0 Tractor de orugas de 140-160 HP hm 11.4286 163.60

Herram. (3% MO) % 0.0300 586.86

01.05.00 TRAZO Y REPLANTEO m2

MANO DE OBRA Rend. = 600.00

0.1 Capataz A hh 0.0013 18.93

1.0 Operario hh 0.0133 13.52

2.0 Peón hh 0.0267 10.81

EQUIPO

Herram. (3% MO) % 0.0300 0.49

MATERIALES

Madera Tornillo en bruto p2 0.0300 2.42

Yeso 20kl bol 0.0150 9.50

02.00.00 EXPLANACIONES

02.01.00 EXCAVACIÓN NO CLASIFICADA

02.01.01 Corte de Material Suelto m3

MANO DE OBRA Rend. = 460.00

0.2 Capataz B hh 0.0035 16.22

0.2 Controlador (of.) hh 0.0035 11.97

2.0 Peón hh 0.0348 10.81

EQUIPO

1.0 Tractor de orugas de 140-160 HP hm 0.0174 163.60

Herram. (3% MO) % 0.0300 0.47

02.01.02 Corte de Roca Suelta m3

a) Perforación y Disparo

MATERIALES (50% requiere explosivos) Rend. = 460.00

Dinamita 0,2 Kg/m3x0,5 Kg 0.1000 7.25

Fulminante 1 Und/m3x0,5 Un 0.5000 0.48

Mecha 1 Ml/m3x0,5 Ml 0.5000 0.48

Page 16: Analisis de Costos VIAL 2

Barreno 5'x1/8" 5m/m3x0,5/600m/Unid Un 0.0040 780.43

MANO DE OBRA

0.5 Capataz B hh 0.0087 16.22

0.5 Controlador (Of.) hh 0.0087 11.97

2.0 Perforistas (Of.) hh 0.0348 11.97

2.0 Peón hh 0.0348 10.81

EQUIPO

1.0 Compresora Neum. 125-175PCM-76HP hm 0.0174 34.20

1.0 Compresora Neum. 700-800PCM 240HP hm 0.0174 128.30

2.0 Martillo Neumático 29 Kg hm 0.0348 12.20

Herram. (3% MO) % 0.0300 1.04

b) Excavación, Desquinche y Peinado

MANO DE OBRA Rend. = 370.00

0.2 Capataz B hh 0.0043 16.22

4.0 Peón hh 0.0865 10.81

EQUIPO

1.0 Tractor de orugas de 140-160 HP hm 0.0216 163.60

Herram. (3% MO) % 0.0300 1.01

02.01.03 Corte de Roca Fija m3

a) Perforación y Disparo

MATERIALES Rend. = 260.00

Dinamita 0,25 Kg/m3 Kg 0.2500 7.25

Fulminante 1 Und/m3 Un 1.0000 0.48

Mecha 1 Ml/m3 Ml 1.0000 0.48

Barreno 5'x1/8" 5m/m3/300m/Unid Un 0.0167 780.43

MANO DE OBRA

0.5 Capataz B hh 0.0154 16.22

0.5 Controlador (Of.) hh 0.0154 11.97

2.0 Perforistas (Of.) hh 0.0615 11.97

2.0 Peón hh 0.0615 10.81

EQUIPO

1.0 Compresora Neum. 125-175PCM-76HP hm 0.0308 34.20

1.0 Compresora Neum. 700-800PCM 240HP hm 0.0308 128.30

2.0 Martillo Neumático 29 Kg hm 0.0615 12.20

Herram. (3% MO) % 0.0300 1.84

b) Excavación, Desquinche y Peinado

MANO DE OBRA Rend. = 370.00

0.2 Capataz B hh 0.0043 16.22

4.0 Peón hh 0.0865 10.81

EQUIPO

1.0 Tractor de orugas de 140-160 HP hm 0.0216 163.60

Herram. (3% MO) % 0.0300 1.01

Page 17: Analisis de Costos VIAL 2

ANÁLISIS DE COSTOS UNITARIOS

PROYECTO: CONSTRUCCIÓN DE CARRETERA : SALPO - LA LIBERTAD

IETAPA KM 85+00 KM 86+00

Funete: Revista Constructivo SEPTIEMBRE 2012 Costos y Tiempos

PARCIAL s/. TOTAL s/.

1180.85

37.86 470.26

432.40

15.25 710.59

3.20

12.71

198.80

220.59

27.37

232.68

4 14082.00

Aq. Unit Aq. Tot

34.20 34.20

12.20 12.20

179.01 179.01

197.58 197.58

163.60 163.60

230.30 230.30

5.90 5.90

70.20 70.20

85.20 85.20

41.20 41.20

218.46 218.46

15.05 15.05

113.48 113.48

31.30 31.30

26.50 26.50

1148.08 1148.08

30.15 30.15

62.00 62.00

9.69 9.69

8.80 8.80

6.90 6.90

2689.80

Page 18: Analisis de Costos VIAL 2

Flete = 4063.70

Alquiler (40%) = 4303.68

44.85 89.70

76.87 153.74

153.14 765.70

99.47 99.47

1108.61

Alquiler = 4434.44

Limpieza (2% del costo) = 256.04

Inst. y Desarmo de Plantas (8% del costo) = 1024.15

20.00

2474.18

92.69 586.86

494.17

1869.71 1887.32

17.61

0.72

0.03 0.49

0.18

0.29

0.01 0.01

0.07 0.22

0.14

44.57

3.33

0.06 0.47

0.04

0.38

2.85 2.86

0.01

13.22

0.73 4.33

0.24

0.24

Page 19: Analisis de Costos VIAL 2

3.12

0.14 1.04

0.10

0.42

0.38

0.59 3.28

2.23

0.42

0.03

0.07 1.01

0.93

3.54 3.57

0.03

28.02

1.81 15.81

0.48

0.48

13.03

0.25 1.84

0.18

0.74

0.67

1.05 5.81

3.95

0.75

0.06

0.07 1.01

0.93

3.54 3.57

0.03