omega npdes paseo lineal fase 3 y 4
Post on 07-Jul-2018
218 Views
Preview:
TRANSCRIPT
-
8/19/2019 OMEGA NPDES Paseo Lineal Fase 3 y 4
1/3
9/10/15, 2:2012 Construction General Permit
Page ttp://ofmpub.epa.gov/apex/aps/f?p=119:4:10625819686541::NO::P4_PERMIT_ID,P4_PERMIT_TYPE:19903,NOI
You are here: Permits Landing Page 2012 CGP 2012 CGP Details
Quick Jump to Other
Permits
2012 Construction General Permit eNOI
Detail
Details for PRR12A724
General Information
Project / Site Name: Construccion Fase 3 y 4 - Paseo Lineal Puerta de Tierra
Current Status: Active
Tracking Number: PRR12A724
Permit Type: NOI
Interview Page Answers
Is your project/site located in Indian Country Lands? No
Are you requesting coverage under this NOI as a 'federal operator' as defined
in Appendix A?No
Operator Information
Operator's Name: Omega Engineering Corp.
Street: PO Box 363823
City: San Juan
State: Puerto Rico
Zip Code: 00936
Point of Contact Name: Noel Robles
Phone Number: 787-793-6100
Operator Email: rlopez@entechdpm.com
Fax: 787-782-7305
IRS Employer Identification Number (EIN): 660455637
Project / Facility Information
Project / Site Name: Construccion Fase 3 y 4 - Paseo Lineal Puerta de Tierra
Street: Avenica Luis Muñoz RiveraCity: San Juan
State: Puerto Rico
Zip Code: 00926
Project / Facility on Indian Land? No
Reservation Name: N/A
Additional Project Information
http://ofmpub.epa.gov/apex/aps/f?p=CGP_2012:HOME:10625819686541:::::http://ofmpub.epa.gov/apex/aps/f?p=LANDING:HOME:10625819686541:::::
-
8/19/2019 OMEGA NPDES Paseo Lineal Fase 3 y 4
2/3
9/10/15, 2:2012 Construction General Permit
Page ttp://ofmpub.epa.gov/apex/aps/f?p=119:4:10625819686541::NO::P4_PERMIT_ID,P4_PERMIT_TYPE:19903,NOI
Is your project an 'emergency-related project' as defined in Appendix A? No
Have stormwater discharges from your project/site been covered previously
under an NPDES permit?No
Estimated Project Start Date: 12/15/2014
Estimated Project End Date 06/30/2016
Have earth-disturbing activities commenced on your project/site? No
County or Similar government subdivision: San Juan
Latitude and Longitude Information
Longitude: 66,06,04
Longitude Unit: (degrees, minutes, seconds)
Latitude: 18,27,59
Latitude Unit: (degrees, minutes, seconds)
Latitude / Longitude Data Source: Google Earth
Horizontal Reference Datum NAD 83 or WGS 84
Estimated Area to be Disturbed (to the nearest quarter acre): 8.53
Chemical Treatment Information
Will you use polymers, flocculants, or other treatment chemicals at yourconstruction site?
No
ESA
Under which criterion listed in Appendix D are you eligible for coverage under
this permit?
A. No federally-listed threatened or endangered species or their
designated critical habitat(s) are likely to occur in your site’s “action
area” as defined in Appendix A of this permit
Provide the basis for criterion selection selected: Environmental Impact Studies Conducted by Owner
1) Any federal listed species and/or designated habitat located in your area: N/A
2) The distance between your site and the listed species or designated critical
habitat (in miles):N/A
SWPPP Point of Contact
Name: Noel Robles
Organization Name: Omega Engineering Corp.
Phone: 787-793-6100
Fax: 787-782-7305
Email: rlopez@entechdpm.com
Discharge Information
Does your project/site discharge stormwater into a Municipal Separate Storm
Sewer System (MS4)?Yes
Are there any surface waters within 50 feet of your project's earth
disturbances?Yes
If a TMDL has been approved or established, identify the title or reference of
the TMDL document:N/A
Impaired Surface Waters to Which you Discharge
Surface water(s) to which you discharge Impaired Water Listed Water Pollutant(s) Tier 2, 2.5 or 3 Source TMDL Name and Pollutant
Atlantic Ocean No No N/A
http://www.epa.gov/npdes/pubs/cgp2012_appendixa.pdf
-
8/19/2019 OMEGA NPDES Paseo Lineal Fase 3 y 4
3/3
9/10/15, 2:2012 Construction General Permit
Page ttp://ofmpub.epa.gov/apex/aps/f?p=119:4:10625819686541::NO::P4_PERMIT_ID,P4_PERMIT_TYPE:19903,NOI
Historic Preservation
Is your project/site located on a property of religious or cultural significance to
an Indian tribe? Are you installing any stormwater controls as described in
Appendix E that require? (Appendix E, Step 1):
No
If yes, have prior surveys or evaluations conducted on the site have already
determined historic properties do not exist, or that prior disturbances have
precluded the existence of historic properties? (Appendix E, Step 2):
N/A
If no, have you determined that your installation of subsurface earth-disturbing
stormwater controls will have no effect on historic properties? (Appendix E,
Step 3):
N/A
If no, did the SHPO, THPO, or other tribal representative (whichever applies)
respond to you within the 15 calendar days to indicate whether the subsurface
earth disturbances caused by the installation of stormwater controls affect
historic properties? (Appendix E, Step 4)
N/A
If yes, describe the nature of their response: N/A
Certifier Information
Name: Noel RoblesTitle: Project Manager
Email: rlopez@entechdpm.com
Certified Date: 12/10/2014
Preparer Information
Name: Roberto Lopez-Esquerra
Phone: (787) 748-6060
Fax: N/A
Organization: ENTECH
Email: rlopez@entechdpm.com
Corresponding Documents
No data found.
Back to Search Results
release 1.0
http://apex.navigation.redirect%28%27f/?p=119:4:10625819686541::NO::::YES%27);
top related