la historia de vestas · 2017-03-27 · 2 | presentation title, date wind. means the world to us...
Post on 13-Mar-2020
6 Views
Preview:
TRANSCRIPT
Tecnología Vestas2 Junio 2010- Santiago de Chile
Pau Roca Parés
proca@vestas.com
2 | Presentation title, date
WIND. MEANS THE WORLD TO US
Con mas de 30 años de experiencia (1979) Vestas
es la compañía pionera en desarrollo de tecnología
eólica y referente del sector con más de 20.000
empleados en todo el mundo.
3 | Presentation title, date
Vestas Northern Europe Vestas Mediterranean Vestas Central Europe Vestas Asia Pacific
Vestas China
Vestas OffshoreVestas Americas
Vestas Nacelles A/S
Vestas Blades A/S
Vestas Spare Parts A/S
Vestas Towers A/S
Vestas Control Systems A/S
Vestas People & Culture
Vestas Technology R&D
Visión Global. Presencia Local
4 | Presentation title, date
Fabricamos
Góndolas en 15
ubicaciones en el mundo
Maquinas
Dinamarca
China
Bujes
Noruega
Suecia
Alemania
China
Generadores
Alemania
China
España
Ensamblaje
Estados Unidos
Dinamarca
India
Italia
España
China
Fabricamos Palas en 8
ubicaciones
Dinamarca
Inglaterra
Italia
Alemania
Australia
China
Estados Unidos
España
Fabricamos torres en 4
ubicacionesEntregamos sistemas
de control desde 5
ubicaciones en España ,
China y Dinamarca
Dinamarca
Escocia
5 | Presentation title, date
Nuestros productos
V52-850 kW
V60-850 kW V80-1.8 MW
V80-2.0 MW
V90-1.8 MW
V90-2.0 MW
V90-3.0 MW
V82-1.65 MW V100-1.8 MW
V112-3.0 MW
6 | Presentation title, date
MW instalados en el mundo
Modelo de Turbina Cantidad MW
V52-850kW 3.424 2.910
V80-1.8MW 1.016 1.829
V80-2.0MW 2.723 5.446
V82-1.5MW 213 320
V82-1.65MW 2.610 4.306
V90-1.8MW 303 545
V90-2.0MW 2.523 5.017
V90-3.0MW 1.341 4.023
Otros 26.506 13.907
Total 40.659 38.303
7 | Presentation title, date
Hemos instalado mas de
40,000 aerogeneradores
Lo que significa un
tercio de las turbinas
instaladas en el mundo
8 | Presentation title, date
Oficina Central
Buenos Aires, Argentina
• Departamento de Ventas
• Departamento de Soporte Técnico
• Departamento de Proyectos
• Departamento de Service
Otras oficinas en Latinoamérica
Sao Paulo, Brasil
•Departamento de Ventas
•Departamento de Soporte Técnico
Entidades Legales:
•Chile
•México
•Planes de expansión:
Oficina comercial Santiago de Chile, Chile
Oficina comercial México DF, México
Vestas en Latinoamérica & CaribeVestas Argentina S.A. se encuentra en Argentina desde 1990
contando con oficinas en Buenos Aires.
9 | Presentation title, date
Capacidad Instalada Latinoamérica
Hemos Instalado 234 MW en Argentina, Aruba, Chile, Cuba, Uruguay,
Mexico, Jamaica, Costa Rica.
Parque Eolico Canela I, Chile Parque Eolico Sierra de los Caracoles I, UruguayParque Eolico Antonio Moran, Argentina
10 | Presentation title, date
Parques Eólicos en Construcción
• Parque Eólico Los Cocos ( 25MW – Republica Dominicana)
• Parque Eólico Cabo Negro (3MW - Chile)
• Parque Eólico Sierra de los Caracoles II (10MW - Uruguay)
• Parque Eólico Magdalena (10MW - Uruguay)
• Parque Eólico Wigton II ( 18MW - Jamaica )
• Parque Eólico Oaxaca (102 MW - México)
168MW
11 | Presentation title, date
Proyectos en Mantenimiento
• Parque Eólico Canela I - 11 x V82 (18.15MW – Chile)
• Parque Eólico Totoral - 23xV90-2 (46MW – Chile)
• M. Redondo - 19xV90-2 ( 38MW – Chile)
• S. de los Caracoles I - 5xV80-2 (10MW Uruguay)
• Parque Eólico Wigton I - 23xNM900( 20,7MW – Jamaica)
Parque Eólico Totoral, Chile Parque Eólico Wigton I, Jamaica
133MW
12 | Presentation title, date
MW instaldos Vestas Latinoamerica & Caribe – Dic. 2009
Instalados
En Construccion
TOTAL MW INSTALADOS VESTAS LA&C: 234MW
Argentina
14 MW
Chile 104 MW
Peru 0.25 MW
Costa Rica
51 MW
Mexico 1.6MW
Jamaica 20 MW
Chile 3MW
Uruguay
10 MW
Jamaica 18 MW
Mexico 102MW
Uruguay
20MW
Dominican Republic
25MW
Aruba 30MW
Cuba 3.8 MW
Brazil
250 MW
13 | Presentation title, date
Foco en Clientes
Liderazgo Tecnológico
Excelencia Operacional
14 | Presentation title, date
Foco en Clientes
• Facilidad de trabajar con Vestas
• Entender las necesidades del cliente
y de los Mercados
• Proporcionar links y relaciones con
Bancos, Instituciones Financieras
• Soporte a Operadores del Mercado
Eléctrico e Instituciones
gubernamentales
• Aportar una seguridad del Project
Finance y de Business case
15 | Presentation title, date
Liderazgo Tecnológico
El I+D elemento clave para alcanzar los requerimientos del mercado
• Minimizar Coste de Energia
• coste MW instalado
• coste MWh producido
• coste de O&M
• Alta fiabilidad (vida util 20 años)
• Máxima seguridad (Safety First!)
• Integración a la Red
• Optimización del espacio
• Respeto con el medio ambiente
16 | Presentation title, date
Coste de Energia y desarrollo tecnológico
Cost of Energy reduction levers that Vestas can address through technology improvements
Cost of Energy drivers directly influenced by Vestas Technology R&D
Cost of Energy
CoE =
Annual amortization of CAPEX*
Annual OPEX
+
Annual power production
Cost of Energy
CoE =
Annual amortization of CAPEX*
Annual OPEX
+
Annual power production
CAPEXCAPEX
Generated power at park (kWh)Generated power at park (kWh)
WTG costWTG cost
Transport costsTransport costs
Balance of plant costsBalance of plant costs
OPEXOPEX
Number of turbinesNumber of turbines
Warranted power curveWarranted power curve
Wind conditions at siteWind conditions at site
AvailabilityAvailability
Park efficiencyPark efficiency
Grid compliance costGrid compliance cost
Land costLand cost
Other costOther cost
Annual poweroutput per WTGAnnual poweroutput per WTG
MW restrictionMW restriction
No. of WTG restrictionNo. of WTG restriction
Sound pressure level or grid com. Sound pressure level or grid com.
O&M costO&M cost
Administration feesAdministration fees
17 | Presentation title, date
Exelencia Operacional
• Optimización del Mantenimiento
Preventivo
• Presencia Local, soporte Global
• Foco en Mantenimiento Predictivo
• Herramientas avanzadas de diagnostico
de fallos
• Condition Monitoring Systems
• Vestas Academy: formación técnicos
• Vestas Test Center
• Sistemas de vigilancia remota 24/7
• Diseño de la turbina considerando el
Mantenimiento
18 | Presentation title, date
Vestas Test Centre
• Vestas ha construido un
centro de pruebas en
Aarhus (DK), de ultima
generación para probar los
componentes y turbinas de
Vestas
19 | Presentation title, date
2 Nuevas turbinas serán lanzadas al mercado en 2010
V112-3.0 MW & V100-1.8 MW
Nuevas tecnologías
• Nuevo diseño de palas
• Niveles de ruido mas bajos
• Full/Partial Converter
• Nuevo diseño de góndola
• Software de ultima generación
• Nuevo sistema de refrigeración
20 | Presentation title, date
LAYOUT DE PLANTA
ELÉCTRICA
Herramienta avanzada que
permite anticipar retos técnicos
del proyectos y proponer la mejor
solución técnica
Optimiza el performance a través
de simulaciones de conexión a la
red y optimizando las
funcionalidades dela turbina
Información necesaria:
- Datos eléctricos del proyecto, (unifilares,
potencias de corto circuito, puntos de
conexión a la red,…)
- Requisitos para la conexión a RED
21 | Presentation title, date
Power
Plant R&D
USA
Power
Plant R&D
Singapore
Power
Plant R&D
Denmark
Engineering Dept.
Technology AR/BR
22 | Presentation title, date
PROYECTO DEL CIRCUITO INTERNO
- Diagrama Unifilar de la Planta
- Dimensionado de los Cables
- Datos del Transformador
- Puesta a Tierra
- Lista de Materiales
ESTUDIOS DE CORTO CIRCUITO
- Diferentes escenários
ESTUDIO DEL FLUJO DE
POTENCIA
- Perfil de Tensión en
Régimen Permanente
- Configuración del Tap del
Transformador
- Dimensionado de la
Compensación de Reactiva
- Cálculo de Pérdidas
Eléctricas
ESTUDIO DE PROTECIONES
- Esquema de Proteción y
Configuración de los Relés
- Flujo de Poténcia y
Corrientes de Corto Circuito
- Configuraciones de las
Protecciones
ESTUDIO DE
TRANSITÓRIOS
- Perfil de Tensión
- Low Voltage Ride-
Through
- Dimensionado Final da
Compensación de
Recativos
RESUMEN DEL CUMPLIMIENTO
COM CÓDIGOS DE RED
23 | Presentation title, date
24 | Presentation title, date
Gracias por su atenciónPau Roca Parés
proca@vestas.com
Copyright Notice
The documents are created by Vestas Wind Systems A/S and contain copyrighted material, trademarks, and other proprietary information. All rights reserved. No part of the documents may be reproduced or copied
in any form or by any means—such as graphic, electronic, or mechanical, including photocopying, taping, or information storage and retrieval systems without the prior written permission of Vestas Wind Systems
A/S. The use of these documents by you, or anyone else authorized by you, is prohibited unless specifically permitted by Vestas Wind Systems A/S. You may not alter or remove any trademark, copyright or other
notice from the documents. The documents are provided ―as is‖ and Vestas Wind Systems A/S shall not have any responsibility or liability whatsoever for the results of use of the documents by you.
Vestas wishes to acknowledge and respect all copyrights in connection with the illustrations used in this presentation. In case we have unintentionally violated copyrighted material, we want to be informed
immediately in order to straighten things out and thus to honour any obligatory fees.
top related