OBRA AMPLIACION DEL AREA DEPORTIVA Y RECREATIVA APURIMAC MZ.A1, LT.1 Y MZ. LT. 1
PROPIETARIO MUNICIPALIDAD DE ALTO SELVA ALEGRE
RESUMEN VALORIZ. N 03 CONTRATISTA CAMPUS CONTRATISTAS GENERALES S.R.L.
MES :SETIEMBRE SUPERVISION MUNICIPALIDAD DE ALTO SELVA ALEGREPLAZO EJECUC 75 DIAS CALENDARIO
DESCRIPCION MONTO VAL.ACUMUL. VALORIZ. VAL.ACUMUL. % AVANCE SALDO A
CONTRATADO ANTERIOR ACTUAL ACTUAL VALORIZAR
VALORIZACION CONTRACTUAL (V)
VALORIZACION 574,582.60 132,426.17 56,084.01 188,510.18 32.81% 386,072.42
TOTAL CONTRACTUAL 574,582.60 132,426.17 56,084.01 188,510.18 386,072.42
% DE AVANCE DE OBRA A LA FECHA 32.81% 67.19%
REAJUSTES (S)
FORMULA POLINOMICA N 01 ESTRUCTURAS 0.00 -504.76 -504.76
TOTAL REAJUSTES 0.00 -504.76 -504.76
VALORIZACION BRUTA (VB=V+S) 55,579.25
AMORTIZACION (A)
AMORTIZ. DEL ADELANTO EN EFECTIVO 0.00
AMORTIZ. ADELANTO MATERIALES 0.00
TOTAL AMORTIZACIONES 0.00
VALORIZACION NETA (VN=VB-A) 55,579.25
MONTOS A PAGAR AL CONTRATISTA
EN VALORIZACION EFECTIVO (V) 574,582.60 55,579.25
EN I.G.V. (V*18%) 103,424.87 10,004.27
MONTO TOTAL VALORIZ. CON I.G.V. (1) 678,007.47 65,583.52
TOTAL COMPROMISO (TC= 1+2) 678,007.47 65,583.52
-
OBRA AMPLIACION DEL AREA DEPORTIVA Y RECREATIVA APURIMAC MZ.A1, LT.1 Y MZ. LT. 1
P.J APURIMAC DISTRITO DE ALTO SELVA ALEGRE
PROPIETARIO MUNICIPALIDAD DE ALTO SELVA ALEGRE
CONTRATISTA CAMPUS CONTRATISTAS GENERALES S.R.L.
SUPERVISION MUNICIPALIDAD DE ALTO SELVA ALEGRE PRES. BASE 678,007.47
DEPARTAMENTO AREQUIPA PROVINCIA AREQUIPA DISTRITO ALTO SELVA ALEGRE PRES. CONTRATO 678,007.47 COSTO AL
COD. UND. METRADO UNITARIO PARCIAL
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO
01 OBRAS Y TRABAJOS PRELIMINARES01.01 OBRAS PRELIMINARES01.01.01 ALMACEN,OFICINA Y CASETA DE GUARDIAN m2 30.00 131.30 3939.00 30.00 3,939.00 100.00 0.00 0.00 0.00 30.00 3,939.00 100.00 0.00
01.01.02 TRANSPORTE DE EQUIPO Y HERRAMIENTAS glb 1.00 41.39 41.39 0.75 31.04 75.00 0.25 10.35 25.00 1.00 41.39 100.00 0.00
01.01.03 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X 2.40 m u 2.00 516.66 1033.32 2.00 1,033.32 100.00 0.00 0.00 0.00 2.00 1,033.32 100.00 0.00
01.01.04 DESMONTAJE DE LA MALLA METALICA glb 1.00 150.00 150.00 0.00 0.00 0.00 0.30 45.00 30.00 0.30 45.00 30.00 0.70
01.01.05 RETIRO DE APARATOS SANITARIOS glb 1.00 100.00 100.00 1.00 100.00 100.00 0.00 0.00 0.00 1.00 100.00 100.00 0.00
01.01.06 CERCO MALLA DE POLIURETANO m2 150.00 11.53 1729.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 150.00
01.02. OBRAS PRELIMINARES
01.02.01 TRAZO Y RELANTEO PRELIMINAR m2 400.00 1.67 668.00 400.00 668.00 100.00 0.00 0.00 0.00 400.00 668.00 100.00 0.00
01.02.02 LIMPIEZA DE TERRENO MANUAL m2 400.00 0.20 80.00 400.00 80.00 100.00 0.00 0.00 0.00 400.00 80.00 100.00 0.00
01.02.03 DEMOLICION DE MURO DE CONTENCION DE CONCRETO m3 4.87 115.64 563.17 0.00 0.00 0.00 3.41 394.33 70.00 3.41 394.33 70.00 1.46
01.02.04 DEMOLICION DE GRADAS m3 2.02 95.36 192.63 2.02 192.63 100.00 0.00 0.00 0.00 2.02 192.63 100.00 0.00
01.02.05 DEMOLICION LOSA DE CONCETO,VEREDAS,RAMPAS Y BERMAS EXISTENTES m2 107.27 18.91 2028.48 107.27 2,028.48 100.00 0.00 0.00 0.00 107.27 2,028.48 100.00 0.00
01.02.06 PICADO DE LOSA DEPORTIVA m2 456.21 5.89 2687.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 456.21
01.02.07 DEMOLICION PARCIAL DE LOSA DEPORTIVA m2 499.02 18.06 9012.30 499.02 9,012.30 100.00 0.00 0.00 0.00 499.02 9,012.30 100.00 0.00
01.02.08 DEMOLICION DE SARDINELES m 52.68 14.10 742.79 52.68 742.79 100.00 0.00 0.00 0.00 52.68 742.79 100.00 0.00
01.02.09 ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO m3 162.00 11.86 1921.32 162.00 1,921.32 100.00 0.00 0.00 0.00 162.00 1,921.32 100.00 0.00
01.03. VARIOS
01.03.01 SEGURIDAD EN OBRA mes 1.00 1500.00 1500.00 1.00 1,500.00 100.00 0.00 0.00 0.00 1.00 1,500.00 100.00 0.00
01.03.02 CONFECCION E INSTALACION DE PLACA u 1.00 950.00 950.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00
02 CERCO PERIMETRICO Y AREAS INTERNAS
02.01. MOVIMIENTO DE TIERRAS
02.01.01 CORTE DE TERRENO R=530m3/dia m3 230.89 10.14 2341.22 220.31 2,233.94 95.00 10.58 0.00 0.00 230.89 2,341.22 100.00 0.00
02.01.02 RELLENO COMPACTO MANUAL MATERIAL PROPIO m3 131.08 11.21 1469.41 32.40 363.20 25.00 94.86 1,063.38 72.00 127.26 1,426.58 97.00 3.82
02.01.03 ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO m3 101.80 11.86 1207.35 101.80 1,207.35 100.00 0.00 0.00 0.00 101.80 1,207.35 100.00 0.00
02.02. OBRAS DE CONCRETO SIMPLE
02.02.01 MURO DE CONTENCION
02.02.01.01 CONCRETO CICLOPEO F'c=140Kg/cm2+25%PM EN MUROS DE CONTENCION m3 111.88 185.15 20714.58 54.87 10,159.18 49.00 20.65 3,823.35 18.00 75.52 13,982.53 68.00 36.36
02.02.01.02 ENCOFRADO Y DESENCOFRADO EN MURO DE CONTENCION m2 288.80 33.23 9596.82 131.48 4,369.08 46.00 46.27 1,537.55 16.00 177.75 5,906.63 62.00 111.05
02.02.02 VEREDAS GRADAS Y RAMPAS
02.02.02.01 CONCRETO VEREDAS,GRADAS Y RAMPAS F'c=140kg/cm2 m3 57.52 194.83 11206.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 57.52
02.02.02.02 ENCOFRADO Y DESENCOPFRADO D VEREDAS,GRADAS Y RAMPAS m2 67.13 23.08 1549.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 67.13
02.03. REVOQUES ENLUCIDOS Y MOLDURAS
02.03.01 TARRAJEO EXTERIOR MORTERO 1:5x1.5cm.(INC.COLUMNAS EMPOTRADAS) m2 316.27 19.31 6107.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 316.27
02.04. PISOS Y PAVIMENTOS
02.04.01 PISO BLOCK DE CEMNETO EN CAMINERIAS Y RAMPAS m2 273.16 32.45 8864.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 273.16
02.05. CARPINTERIA METALICA
02.05.01 CERCOS DE TUBOS Y MALLA SEGN DISEO MODELO 1 (cerco perimetral) m2 622.65 47.07 29308.14 186.80 8,792.44 30.00 124.53 5,861.63 20.00 311.33 14,654.07 50.00 311.33
02.05.02 CERCO DE TUBOS Y MALLA SEGUN DISEO MODELO 2 (cerco area deportiva) m2 405.07 62.67 25385.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 405.07
02.05.03 PUERTA DE MALLA TUBO CON REJAS SEGN DISEO m2 23.84 193.47 4612.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 23.84
02.05.04 BARANDA METALICA m 45.40 86.53 3928.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 45.40
02.06. PINTURA
02.06.01 PINTURA EN EXTERIORES m2 540.11 8.54 4612.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 540.11
02.06.02 PINTURA ESTRUCTURAS ESTRUCTURA METALICA m2 351.25 8.86 3112.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 351.25
02.07. VARIOS
02.07.01 SEMBRADO GRASS AREAS VERDES m2 2481.41 7.81 19379.81 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,481.41
02.07.02 SEMBRADO DE ARBOLES u 4.00 28.74 114.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00
02.08. INSTALACIONES ELECTRICAS
02.08.01 MOVIMINETO DE TIERRAS
02.08.01.01 EXCAVACION DE ZANJAS m3 69.72 13.51 941.92 0.00 0.00 0.00 58.50 790.34 84.00 58.50 790.34 84.00 11.22
VALORIZACION N 03
DESCRIPCION
VALORIZ. ANTERIOR VALORIZ. ACTUAL VALORIZ. ACUMULADA SALDO VALORIZAR
-
OBRA AMPLIACION DEL AREA DEPORTIVA Y RECREATIVA APURIMAC MZ.A1, LT.1 Y MZ. LT. 1
P.J APURIMAC DISTRITO DE ALTO SELVA ALEGRE
PROPIETARIO MUNICIPALIDAD DE ALTO SELVA ALEGRE
CONTRATISTA CAMPUS CONTRATISTAS GENERALES S.R.L.
SUPERVISION MUNICIPALIDAD DE ALTO SELVA ALEGRE PRES. BASE 678,007.47
DEPARTAMENTO AREQUIPA PROVINCIA AREQUIPA DISTRITO ALTO SELVA ALEGRE PRES. CONTRATO 678,007.47 COSTO AL
COD. UND. METRADO UNITARIO PARCIAL
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO
VALORIZACION N 03
DESCRIPCION
VALORIZ. ANTERIOR VALORIZ. ACTUAL VALORIZ. ACUMULADA SALDO VALORIZAR
02.08.02 ARTEFACTOS DE ILUMINACION
02.08.02.01 ARTEFACTO LUMINARIO EXTERIOR INC/POSTE u 3.00 1247.07 3741.21 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00
02.08.03 CONDUCTORES
02.08.03.01 CABLE NYY 1-10 mm2 m 106.50 7.01 746.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 106.50
02.08.03.02 CABLE NYY 1-16 mm2 m 506.74 9.34 4732.95 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 506.74
02.08.03.03 CABLE NYY 1X6 mm2 m 764.81 5.48 4191.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 764.81
02.08.03.04 CABLE THW 1-10 4 mm2 m 1.00 4.33 4.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00
02.08.03.05 CABLE TW 4 mm2 m 1.00 4.31 4.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00
02.08.03.06 CABLE TW 2.5 mm2 m 1.00 3.72 3.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00
02.08.03.07 CABLE DESNUDO 1X25 mm2 m 10.00 11.45 114.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.00
02.08.04 CANALIZACION Y/O TUBERIA
02.08.04.01 TUBERIAS PVC -P (ELECTRICAS) D=25 mm m 11.50 6.80 78.20 0.00 0.00 0.00 5.75 39.10 50.00 5.75 39.10 50.00 5.75
02.08.04.02 TUBERIAS PVC -P (ELECTRICAS) D=40 mm m 41.80 7.17 299.71 0.00 0.00 0.00 20.90 149.85 50.00 20.90 149.85 50.00 20.90
02.08.04.03 TUBERIAS PVC -P (ELECTRICAS) D=50 mm m 16.00 8.36 133.76 0.00 0.00 0.00 8.00 66.88 50.00 8.00 66.88 50.00 8.00
02.08.05 TABLERO DE DISTRIBUCION PARA CORRIENTE ALTERNA
02.08.05.01 TABLERO DE DISTRIBUCION CAJA NETALICA CON 12 POLOS u 6.00 191.22 1147.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00
02.08.05.02 TABLERO GENERAL DE DISTRIBUCION u 1.00 692.81 692.81 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00
02.08.05.03 CAJA DE FIERRO GALVANIZADO 20X20X10 cm u 2.00 1.00 2.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00
02.08.05.04 CAJA DE FIERRO GALVANIZADO 10X10X5 cm u 1.00 1.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00
02.08.05.05 MEDIDOR DE ENERGIA u 1.00 415.54 415.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00
02.08.05.06 POZO CONEXIN A TIERRA PT-1,PT-2 Y PT-3 u 3.00 764.34 2293.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00
03 MODULO DE SERVICIOS HIGIENEICOS, VESTUARIOS Y BOLETERIA
03.01 MOVIMIENTO DE TIERRAS
03.01.01 CORTE DE TERRENO R=530 m3/dia m3 76.62 10.14 776.93 76.62 776.93 100.00 0.00 0.00 0.00 76.62 776.93 100.00 0.00
03.01.02 EXCAVACION DE ZANJAS m3 61.00 13.51 824.11 61.00 824.11 100.00 0.00 0.00 0.00 61.00 824.11 100.00 0.00
03.01.03 NIVELACION INT. APISONADO MANUAL TERRENO NORMAL Y PISTA DE TROTE m2 424.01 1.85 784.42 162.35 300.35 38.00 250.35 463.15 59.00 412.70 763.50 97.00 11.31
03.01.04 RELLENO COMPACTADO MANUAL MATERIAL PROPIO m3 46.08 11.21 516.56 28.58 320.38 62.00 17.50 196.18 38.00 46.08 516.56 100.00 0.00
03.01.05 ELIMINACION MATERIAL EXCEDENTE CON EQUIPO m3 109.90 11.86 1303.41 109.90 1,303.41 100.00 0.00 0.00 0.00 109.90 1,303.41 100.00 0.00
03.02 OBRAS DE CONCRETO SIMPLE
03.02.01 CIMIENTOS CORRIDOS
03.02.01.01 CONCRETO 1:10+30% P.G. PARA CIMIENTOS CORRIDOS m3 69.73 163.04 11368.78 69.73 11,368.78 100.00 0.00 0.00 0.00 69.73 11,368.78 100.00 0.00
03.02.02 SOBRECIMIENTO
03.02.02.01 CONCRETO F'C=140GG/CM2 + 30PM SOBRECIMIENTOS m3 7.39 255.51 1888.22 7.39 1,888.22 100.00 0.00 0.00 0.00 7.39 1,888.22 100.00 0.00
03.02.02.02 ENCOFRADO Y DESENCOFRADO NORMAL P/SOBRECIMIENTOS HASTA 0.30m m2 72.41 20.70 1498.89 72.41 1,498.89 100.00 0.00 0.00 0.00 72.41 1,498.89 100.00 0.00
03.02.03 SOLADOS Y FALSO PISO
03.02.03.01 SOLADOPARA ZAPATAS m2 6.79 11.97 81.28 6.79 81.28 100.00 0.00 0.00 0.00 6.79 81.28 100.00 0.00
03.02.03.02 FALSO PISO DE 4'' DE CONCRETO 1:10 m2 117.04 14.96 1750.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 117.04
03.03 OBRAS DE CONCRETO ARMADO
03.03.01 MURO DE CONTENCION
03.03.01.01 CONCRETO f'c=210 kg/cm2 EN MURO DE CONTENCION m3 18.20 370.67 6746.19 12.28 4,551.83 67.00 5.92 2,194.37 33.00 18.20 6,746.19 100.00 0.00
03.03.01.02 ACERO CORRUGADO fy=42000 kg/cm2 GRADO 60 EN MURO DE CONTENCION kg 449.96 3.97 1786.34 449.96 1,786.34 100.00 0.00 0.00 0.00 449.96 1,786.34 100.00 0.00
03.03.01.03 ENCOFRADO Y DESENCOFRADO NORMAL EN MURO DE CONTENCION m2 105.12 33.23 3493.14 105.12 3,493.14 100.00 0.00 0.00 0.00 105.12 3,493.14 100.00 0.00
03.03.02 ZAPATAS
03.03.02.01 CONCRETO f'c=210 kg/cm2 EN ZAPATAS m3 3.50 335.11 1172.89 1.40 469.15 40.00 2.10 703.73 60.00 3.50 1,172.89 100.00 0.00
03.03.02.02 ACERO CORRUGADO fy=42000 kg/cm2 GRADO 60 EN ZAPATAS kg 20.33 3.97 80.71 20.33 80.71 100.00 0.00 0.00 0.00 20.33 80.71 100.00 0.00
03.03.03 COLUMNAS
03.02.03.01 CONCRETO f'c=210 kg/cm2 PARA COLUMNAS m3 18.61 317.11 5901.42 5.79 1,836.07 31.00 12.82 4,065.35 69.00 18.61 5,901.42 100.00 0.00
03.02.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 120.26 39.76 4781.54 60.42 2,402.30 50.00 59.84 2,379.24 50.00 120.26 4,781.54 100.00 0.00
03.02.03.03 ACERO CORRUGADO fy=42000 kg/cm2 GRADO 60 EN COLUMNAS kg 1392.28 3.97 5527.35 1,392.28 5,527.35 100.00 0.00 0.00 0.00 1,392.28 5,527.35 100.00 0.00
03.03.04 VIGAS
03.03.04.01 CONCRETO f'c=210 kg/cm2 PARA VIGAS m3 8.62 322.89 2783.31 2.43 784.62 28.00 5.35 1,727.46 62.00 7.78 2,512.08 90.00 0.84
-
OBRA AMPLIACION DEL AREA DEPORTIVA Y RECREATIVA APURIMAC MZ.A1, LT.1 Y MZ. LT. 1
P.J APURIMAC DISTRITO DE ALTO SELVA ALEGRE
PROPIETARIO MUNICIPALIDAD DE ALTO SELVA ALEGRE
CONTRATISTA CAMPUS CONTRATISTAS GENERALES S.R.L.
SUPERVISION MUNICIPALIDAD DE ALTO SELVA ALEGRE PRES. BASE 678,007.47
DEPARTAMENTO AREQUIPA PROVINCIA AREQUIPA DISTRITO ALTO SELVA ALEGRE PRES. CONTRATO 678,007.47 COSTO AL
COD. UND. METRADO UNITARIO PARCIAL
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO
VALORIZACION N 03
DESCRIPCION
VALORIZ. ANTERIOR VALORIZ. ACTUAL VALORIZ. ACUMULADA SALDO VALORIZAR
03.03.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 38.83 52.26 2029.26 9.97 521.03 26.00 25.51 1,333.15 66.00 35.48 1,854.18 91.00 3.35
03.03.04.03 ACERO CORRUGADO fy=42000 kg/cm2 GRADO 60 EN VIGAS kg 815.72 3.96 3230.25 634.25 2,511.63 78.00 181.47 718.62 22.00 815.72 3,230.25 100.00 0.00
03.03.05 LOSAS ALIGERADAS
03.03.05.01 CONCRETO f'c=210 kg/cm2 EN LOSAS ALIGERADAS m3 1.49 391.62 583.51 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.49
03.03.05.02 ENCOFRADO Y DESENCOFRADO EN LOSAS ALIGERADAS m2 19.35 42.87 829.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 19.35
03.03.05.03 LADRILLO HUECO DE ARCILLA h=15cm PARA TECHO ALIGERADO u 58.62 1.89 110.79 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 58.62
03.03.05.04 ACERO CORRUGADO fy=42000 kg/cm2 GRADO 60 EN LOSA ALIGERADA kg 161.25 4.02 648.23 161.25 648.23 100.00 0.00 0.00 0.00 161.25 648.23 100.00 0.00
03.04. MUROS Y TABIQUES DE ALBAILERIA
03.04.01 MUROS DE LADRILLO KK DE ARCILLA DE SOGA CON MEZCLA 1:4X1.5 cm m2 114.06 61.54 7019.25 105.24 6,476.47 92.00 6.72 413.55 6.00 111.96 6,890.02 98.00 2.10
03.04.02 MURO DE CABEZA LADRILLO KING-KONG CON CEMENTO Y ARENA m2 129.57 90.47 11722.20 129.57 11,722.20 100.00 0.00 0.00 0.00 129.57 11,722.20 100.00 0.00
03.05. REVOQUES ENLUCIDOS Y MOLDURAS
03.05.01 TARRAJEO DEL TIPO RAYADO O PRIMARIO CON MORTERO 1:5 m2 155.47 14.11 2193.68 16.98 239.59 11.00 79.74 1,125.13 51.00 96.72 1,364.72 62.00 58.75
03.05.02 TARRAJEO INTERIOR MORTERO 1:5x1.5 cm(INCL. COLUMNAS EMPOTRADAS) m2 88.15 20.24 1784.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 88.15
03.05.03 TARRAJEO EXTERIOR MORTERO 1:5x1.5 cm(INCL. COLUMNAS EMPOTRADAS) m2 181.66 19.31 3507.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 181.66
03.06. CIELORRASOS
03.06.01 CIELORRASOS CON MEZCLA DE CEMENTO - ARENA m2 19.35 24.36 471.37 0.00 0.00 0.00 15.48 377.09 80.00 15.48 377.09 80.00 3.87
03.07. PISOS Y PAVIMENTOS
03.07.01 CONTRA PISO DE 48 MM PASTA 1:2 m2 117.04 21.05 2463.69 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 117.04
03.07.02 PISO CERAMICO DE 030X0.30 m2 117.04 46.35 5424.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 117.04
03.08. ZOCALOS
03.08.01 ZOCALO DE LOSETA CERAMICA DE COLOR DE 0.20X0.0.30 CM m2 155.47 36.22 5631.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 155.47
03.09. CUBIERTAS
03.09.01 CUBIERTA LIGERA PARA TECHOS m2 205.30 79.42 16304.93 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 205.30
03.10. CARPINTERIA DE MADERA
03.10.01 PUERTA DE MADERA m2 31.20 120.00 3744.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 31.20
03.11. VIDRIOS, CRISTALES Y SIMILARES
03.11.01 VIDRIO IMPORTADO COLOR GRIS DE 6MM(SISTEMA MODUGLAS) p2 155.00 7.68 1190.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 155.00
03.12. PINTURA
03.12.01 PINTURA EN INTERIORES m2 88.15 8.48 747.51 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 88.15
03.12.02 PINTURA EN EXTERIORES m2 181.66 8.54 1551.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 181.66
03.12.03 PINTURA EN CIELO RRRASO 2 MANOS m2 20.46 8.33 170.43 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20.46
03.12.04 PINTURA EN ESTRUCTURAS ESTRUCTURAS METALICAS m2 130.00 8.86 1151.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 130.00
03.13. VARIOS
03.13.01 DIVISION DE MELANINA PARA SERVICIOS INC/PUERTAS m 39.90 95.34 3804.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 39.90
03.13.02 BANCAS DE MADERA PARA VESTUARIOS SEGN DISEO u 9.00 239.80 2158.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9.00
03.13.03 MODULO DE CASILLEROS EN MDF 12MM u 9.00 118.55 1066.95 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9.00
03.14. INTALACIONES SANITARIAS
03.14.01 APARATOS SANITARIOS
03.14.01.01 INODORO TANQUE BAJO pza 18.00 166.16 2990.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 18.00
03.14.01.02 URINARIO CADET BLANCO pza 13.00 145.47 1891.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 13.00
03.14.01.03 LAVATORIO DE PARED BLANCO 1 LLAVE pza 19.00 46.87 890.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 19.00
03.14.01.04 DUCHAS CROMADAS DE CABEZA GIRATORIA Y LLAVE pza 12.00 55.17 662.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12.00
03.14.02 SISTEMA DE DESAGUE Y VENTILACION
03.14.02.01 SALIDAS DE PVC SAL PARA DESAGUE DE 2'' pto 44.00 26.42 1162.48 30.00 792.60 68.00 10.00 264.20 23.00 40.00 1,056.80 91.00 4.00
03.14.02.02 SALIDAS DE PVC SAL PARA DESAGUE DE 4'' pto 18.00 73.19 1317.42 9.00 658.71 50.00 5.00 365.95 28.00 14.00 1,024.66 78.00 4.00
03.14.02.03 SALIDAS CON DUCTO PVC SAL PARA VENTILACION DE 2'' pto 9.00 71.45 643.05 5.00 357.25 56.00 2.00 142.90 22.00 7.00 500.15 78.00 2.00
03.14.02.04 TUBERIA DE PVC SAL 2'' m 50.21 17.37 872.15 40.00 694.80 80.00 8.00 138.96 16.00 48.00 833.76 96.00 2.21
03.14.02.05 TUBERIA DE PVC SAL 3'' m 10.00 18.94 189.40 7.00 132.58 70.00 2.00 37.88 20.00 9.00 170.46 90.00 1.00
03.14.02.06 TUBERIA DE PVC SAL 4'' m 90.15 17.37 1565.91 40.00 694.80 44.00 40.15 697.41 45.00 80.15 1,392.21 89.00 10.00
03.14.02.07 SUMIDERO DE BRONCE 2'' INCL. PROVISION Y COLOCACION u 26.00 41.01 1066.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 26.00
03.14.02.08 REGISTROS DE BRONCE DE 4'' pza 7.00 35.71 249.97 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.00
-
OBRA AMPLIACION DEL AREA DEPORTIVA Y RECREATIVA APURIMAC MZ.A1, LT.1 Y MZ. LT. 1
P.J APURIMAC DISTRITO DE ALTO SELVA ALEGRE
PROPIETARIO MUNICIPALIDAD DE ALTO SELVA ALEGRE
CONTRATISTA CAMPUS CONTRATISTAS GENERALES S.R.L.
SUPERVISION MUNICIPALIDAD DE ALTO SELVA ALEGRE PRES. BASE 678,007.47
DEPARTAMENTO AREQUIPA PROVINCIA AREQUIPA DISTRITO ALTO SELVA ALEGRE PRES. CONTRATO 678,007.47 COSTO AL
COD. UND. METRADO UNITARIO PARCIAL
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO
VALORIZACION N 03
DESCRIPCION
VALORIZ. ANTERIOR VALORIZ. ACTUAL VALORIZ. ACUMULADA SALDO VALORIZAR
03.14.02.09 CAJA DE REGISTRO DE DESAGUE 12''X24'' pza 4.00 196.68 786.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00
03.14.03 SISTEMA DE AGUA FRIA
03.14.03.01 TANQUE DE AGUA DE 2.5 M3 DE POLIETILENO CON ACCESORIOS pza 2.00 1000.00 2000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00
03.14.03.02 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2'' pto 62.00 54.82 3398.84 20.00 1,096.40 32.00 40.00 2,192.80 65.00 60.00 3,289.20 97.00 2.00
03.14.03.03 TUBERIA PVC-SAP RED DE AGUA FRIA DE 3/4'' m 25.00 15.21 380.25 13.00 197.73 52.00 7.00 106.47 28.00 20.00 304.20 80.00 5.00
03.14.03.04 TUBERIA PVC-SAP RED DE AGUA FRIA DE 1/2'' m 15.00 13.07 196.05 8.00 104.56 53.00 4.00 52.28 27.00 12.00 156.84 80.00 3.00
03.15. INSTALACIONES ELECTRICAS
03.15.01 ARTEFACTOS DE ILUMINACION
03.15.01.01 ARTEFACTO FLUORESCENTE 2/36W C/SOPORTE u 22.00 87.47 1924.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22.00
03.15.01.02 ARTEFACTO FLUORESCENTE CIRCULAR 2/36W C/SOPORTE u 3.00 82.22 246.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00
03.15.01.03 ARTEFACTO BRAQUETE CON DOS LAMPARAS 16W u 15.00 59.98 899.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15.00
03.15.02 SALIDA PARA ILUMINACION
03.15.02.01 SALIDA DE TECHO (CENTRO DE LUZ) pto 25.00 87.58 2189.50 0.00 0.00 0.00 25.00 2,189.50 100.00 25.00 2,189.50 100.00 0.00
03.15.02.02 SALIDA DE PARED (BRAQUETES) CON PVC pto 15.00 80.75 1211.25 10.00 807.50 67.00 5.00 403.75 33.00 15.00 1,211.25 100.00 0.00
03.15.02.03 SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE C/PUESTA A TIERRA pto 24.00 79.35 1904.40 13.00 1,031.55 54.00 11.00 872.85 46.00 24.00 1,904.40 100.00 0.00
03.15.03 CONDUCTORES
03.15.03.01 CABLE NH80 4 mm2 m 122.95 4.63 569.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 122.95
03.15.03.02 CABLE NH80 2.5 mm2 m 524.55 3.94 2066.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 524.55
03.15.04 CANALIZACION Y/O TUBERIA
03.15.04.01 TUBERIAS PVC-P(ELECTRICAS) D=20mm m 147.00 6.38 937.86 0.00 0.00 0.00 50.00 319.00 34.00 50.00 319.00 34.00 97.00
04 CAMPO DEPORTIVO
04.01 MOVIMIENTO DE TIERRAS
04.01.01 CORTE DE TERRENO PARA CISTERNA m3 24.00 10.14 243.36 24.00 243.36 100.00 0.00 0.00 0.00 24.00 243.36 100.00 0.00
04.01.02 NIVELACION INT. APISONADO MANUAL TERRENO NORMAL Y PISTA DE TROTE m2 427.42 1.85 790.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 427.42
04.02. OBRAS DE CONCRETO SIMPLE
04.02.01 SARDINELES
04.02.01.01 SARDINEL PERALTADO INCL. ENCOFRADO F'C=140KG/CM2 15X35 m 460.54 10.04 4623.82 0.00 0.00 0.00 144.38 1,449.58 31.00 144.38 1,449.58 31.00 316.16
04.03. OBRAS DE CONCRETO ARMADO
04.03.01 CISTERNA
04.03.01.01 CONCRETO f'c=210 kg/cm2 EN CISTERNA m3 14.18 310.15 4397.93 0.00 0.00 0.00 12.40 3,845.86 87.00 12.40 3,845.86 87.00 1.78
04.03.01.02 ACERO CORRUGADO fy=42000 kg/cm2 GRADO 60 EN CISTERNA kg 516.85 3.97 2051.89 516.85 2,051.89 100.00 0.00 0.00 0.00 516.85 2,051.89 100.00 0.00
04.03.01.03 ENCOFRADO Y DESENCOFRADO NORMAL EN CISTERNA m2 65.41 28.79 1883.15 0.00 0.00 0.00 49.30 1,419.35 75.00 49.30 1,419.35 75.00 16.11
04.04. CUBIERTAS
04.04.01 COBERTURA GRADERIAS Y AREAS DE SUPLENTES SEGN DISEO EN PLANO m2 92.09 106.98 9851.79 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 92.09
04.05. PINTURA
04.05.01 PINTURA EN ESTRUCTURAS ESTRUC. METALICAS m2 107.09 8.86 948.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 107.09
04.05.02 MARCADO DE CANCHA DE FUTBOL m 500.00 2.96 1480.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 500.00
04.06. VARIOS
04.06.01 ACONDICIONAMIENTO DE ARCOS DE FUTBOL EXISTENTES gbl 2.00 200.00 400.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00
04.06.02 SEMBRADO DE GRASS EN CANCHA DE FUTBOL m2 4500.00 7.60 34200.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,500.00
04.06.03 BANCAS PARA AREA DE SUPLENTES gbl 1.00 1470.00 1470.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00
04.07. SISTEMA DE RIEGO
04.07.01 REDES DE DISTRIBUCION
04.07.01.01 SUMINISTRO Y INST. DE TUBERIA PVC C-7.5 DE 2'' u 250.00 18.64 4660.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 250.00
04.07.01.02 ASPERSOR DE IMPACTO MOD F46L 3/4'' pza 5.00 275.45 1377.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.00
04.07.02 ACCESORIOS
04.07.02.01 SUMINISTRO E INSTALACION DE ELECTROBOMBA DE AGUA u 1.00 2040.37 2040.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00
04.07.03 VARIOS
04.07.03.01 ESCALERA METALICA DE GATO m 4.30 213.55 918.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.30
04.07.03.02 TARRAJEO CON IMPERMEABILIZANTES m2 65.41 20.13 1316.70 0.00 0.00 0.00 49.30 992.41 75.00 49.30 992.41 75.00 16.11
05 LOSA DEPORTIVA
-
OBRA AMPLIACION DEL AREA DEPORTIVA Y RECREATIVA APURIMAC MZ.A1, LT.1 Y MZ. LT. 1
P.J APURIMAC DISTRITO DE ALTO SELVA ALEGRE
PROPIETARIO MUNICIPALIDAD DE ALTO SELVA ALEGRE
CONTRATISTA CAMPUS CONTRATISTAS GENERALES S.R.L.
SUPERVISION MUNICIPALIDAD DE ALTO SELVA ALEGRE PRES. BASE 678,007.47
DEPARTAMENTO AREQUIPA PROVINCIA AREQUIPA DISTRITO ALTO SELVA ALEGRE PRES. CONTRATO 678,007.47 COSTO AL
COD. UND. METRADO UNITARIO PARCIAL
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO
VALORIZACION N 03
DESCRIPCION
VALORIZ. ANTERIOR VALORIZ. ACTUAL VALORIZ. ACUMULADA SALDO VALORIZAR
05.01. MOVIMIENTO DE TIERRAS
05.01.01 EXCAVACION DE ZANJAS m3 18.90 13.51 255.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 18.90
05.01.02 NIVELACION INT. APISONADO MANUAL TERRENO NORMAL Y PISTA DE TROTE m2 969.30 1.85 1793.21 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 969.30
05.01.03 RELLENO COMPACTADO MANUAL MATERIAL PROPIO m3 15.68 11.21 175.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15.68
05.01.04 ELIMINACION MATERIAL EXCEDENTE CON EQUIPO m3 3.80 11.86 45.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.80
05.02. OBRAS DE CONCRETO SIMPLE
05.02.01 GRADERIAS
05.02.01.01 CONCRETO CICLOPEO F'C=140kg/cm2+25%PM EN GRADERIAS m3 6.16 185.15 1140.52 0.00 0.00 0.00 6.16 1,140.52 100.00 6.16 1,140.52 100.00 0.00
05.02.01.02 ENCOFRADO Y DESENCOFRADO DE GRADERIAS m2 10.35 32.51 336.48 0.00 0.00 0.00 10.35 336.48 100.00 10.35 336.48 100.00 0.00
05.02.02 LOSAS DEPORTIVA
05.02.02.01 CONCRETO F'C=175kg/cm2+25%PM EN LOSA DEPORTIVA m3 23.94 286.37 6855.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 23.94
05.02.02.02 ENCOFRADO Y DESENCOFRADO EN LOSA DEPORTIVA m2 9.23 32.76 302.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9.23
05.03. OBRAS DE CONCRETO ARMADO
05.03.01 BASES PARA ESTRUCTURA METALICA
05.03.01.01 CONCRETO F'C=210kg/cm2+25%PM EN BASE PARA ESTRUCTURA m3 15.68 310.15 4863.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15.68
05.03.01.02 ACERO CORRUGADO fy=42000 kg/cm2 GRADO EN BASE DE ESTRUCTURA kg 124.32 3.97 493.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 124.32
05.04. REVOQUES ENLUCIDOS Y MOLDURAS
05.04.01 TARRAJEO EXTERIOR MORTERO 1.5x1.5 cm (INCL.COLUMNAS EMPOTRADAS) m2 58.07 19.31 1121.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 58.07
05.05. CUBIERTAS
05.05.01 COBERTURA DE MALLA RACHELL m2 1304.78 9.28 12108.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,304.78
05.05.02 ESTRUCTURA METALICA PARA SOPORTE DE MALLA RACHELL SEGUN DISEO m 350.00 67.15 23502.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 350.00
05.05.03 MONTAJE Y ARMADO DE COLUMNAS METALICAS u 1.00 950.00 950.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00
05.06. PINTURA
05.06.01 LINEAS DEMARCATORIAS LOSA DEPORTIVA m 300.00 1.55 465.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 300.00
05.06.02 PINTURA EN LOSA DEPORTIVA m2 441.21 9.64 4253.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 441.21
05.06.03 PINTURA EN ESTRUCTURA ESTRUC. METALICAS m2 372.30 8.86 3298.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 372.30
05.07. VARIOS
05.07.01 JUNTAS DE DILATACION m 169.50 27.37 4639.22 0.00 0.00 0.00 138.95 3,803.06 82.00 138.95 3,803.06 82.00 30.55
05.07.02 SEMBRADO DE GRASS CANCHA DE FULBITO Y AREAS VERDES m2 391.67 7.81 3058.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 391.67
05.07.03 ARCO DE FULBITO gbl 1.00 2000.00 2000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00
05.07.04 ACONDICIONAMIENTO DE ARCOS DE LOSA EXISTENTES gbl 2.00 400.00 800.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00
05.08. INSTALACIONES ELECTRICAS
05.08.01 ARTEFACTOS DE ILUMINACION
05.08.01.01 ARTEFACTO LUMINARIO EXTERIOR TIPO REFLECTOR P/LOSAS DEPORTIVAS u 4.00 552.82 2211.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00
05.05.02 CONDUCTORES
05.08.02.01 CABLE NYY 1X4 mm2 m 425.60 5.35 2276.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 425.60
COSTO DIRECTO 514,812.83 118,650.81 50,249.99 169,008.08
GASTOS GENERALES 6.61% 34,029.13 7,842.82 3,321.52 11,171.43
UTILIDAD 5.00% 25,740.64 5,932.54 2,512.50 8,450.40
SUB-TOTAL 574,582.60 132,426.17 56,084.01 188,629.91
IMPUESTO GENERAL A LAS VENTAS 18% 103,424.87 23,836.71 10,095.12 33,953.38
COSTO TOTAL CON IGV 678,007.47 156,262.88 66,179.13 222,583.29
-
OBRA AMPLIACION DEL AREA DEPORTIVA Y RECREATIVA APURIMAC MZ.A1, LT.1 Y MZ. LT. 1
P.J APURIMAC DISTRITO DE ALTO SELVA ALEGRE
PROPIETARIO MUNICIPALIDAD DE ALTO SELVA ALEGRE
CONTRATISTA CAMPUS CONTRATISTAS GENERALES S.R.L.
SUPERVISION MUNICIPALIDAD DE ALTO SELVA ALEGRE PRES. BASE 678,007.47
DEPARTAMENTO AREQUIPA PROVINCIA AREQUIPA DISTRITO ALTO SELVA ALEGRE PRES. CONTRATO 678,007.47 COSTO AL
COD. UND. METRADO UNITARIO PARCIAL
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO
VALORIZACION N 03
DESCRIPCION
VALORIZ. ANTERIOR VALORIZ. ACTUAL VALORIZ. ACUMULADA SALDO VALORIZAR
-
3/1/2012
PARCIAL %
0.00 0.00 0.0000
0.00 0.00 0.0000
0.00 0.00 0.0000
105.00 70.00 105.0000
0.00 0.00 0.0000
1,729.50 100.00 1,729.5000
0.0000
0.00 0.00 0.0000
0.00 0.00 0.0000
168.83 30.00 168.8400
0.00 0.00 0.0000
0.00 0.00 0.0000
2,687.08 100.00 2,687.0800
0.00 0.00 0.0000
0.00 0.00 0.0000
0.00 0.00 0.0000
0.0000
0.00 0.00 0.0000
950.00 100.00 950.0000
0.0000
0.0000
0.00 0.00 0.0000
42.82 3.00 42.8300
0.00 0.00 0.0000
0.0000
0.0000
6,732.05 32.00 6,732.0500
3,690.19 38.00 3,690.1900
0.0000
11,206.62 100.00 11,206.6200
1,549.36 100.00 1,549.3600
0.0000
6,107.17 100.00 6,107.1700
0.0000
8,864.04 100.00 8,864.0400
0.0000
14,654.07 50.00 14,654.0700
25,385.74 100.00 25,385.7400
4,612.32 100.00 4,612.3200
3,928.46 100.00 3,928.4600
0.0000
4,612.54 100.00 4,612.5400
3,112.08 100.00 3,112.0800
0.0000
19,379.81 100.00 19,379.8100
114.96 100.00 114.9600
0.0000
0.0000
151.58 16.00 151.5800
VALORIZACION N 03
SALDO VALORIZAR
-
3/1/2012
PARCIAL %
VALORIZACION N 03
SALDO VALORIZAR
0.0000
3,741.21 100.00 3,741.2100
0.0000
746.57 100.00 746.5700
4,732.95 100.00 4,732.9500
4,191.16 100.00 4,191.1600
4.33 100.00 4.3300
4.31 100.00 4.3100
3.72 100.00 3.7200
114.50 100.00 114.5000
0.0000
39.10 50.00 39.1000
149.85 50.00 149.8600
66.88 50.00 66.8800
0.0000
1,147.32 100.00 1,147.3200
692.81 100.00 692.8100
2.00 100.00 2.0000
1.00 100.00 1.0000
415.54 100.00 415.5400
2,293.02 100.00 2,293.0200
0.0000
0.0000
0.00 0.00 0.0000
0.00 0.00 0.0000
20.92 3.00 20.9200
0.00 0.00 0.0000
0.00 0.00 0.0000
0.0000
0.0000
0.00 0.00 0.0000
0.0000
0.00 0.00 0.0000
0.00 0.00 0.0000
0.0000
0.00 0.00 0.0000
1,750.92 100.00 1,750.9200
0.0000
0.0000
0.00 0.00 0.0000
0.00 0.00 0.0000
0.00 0.00 0.0000
0.0000
0.00 0.00 0.0000
0.00 0.00 0.0000
0.0000
0.00 0.00 0.0000
0.00 0.00 0.0000
0.00 0.00 0.0000
0.0000
271.23 10.00 271.2300
-
3/1/2012
PARCIAL %
VALORIZACION N 03
SALDO VALORIZAR
175.07 9.00 175.0800
0.00 0.00 0.0000
0.0000
583.51 100.00 583.5100
829.53 100.00 829.5300
110.79 100.00 110.7900
0.00 0.00 0.0000
0.0000
129.23 2.00 129.2300
0.00 0.00 0.0000
0.0000
828.96 38.00 828.9600
1,784.16 100.00 1,784.1600
3,507.85 100.00 3,507.8500
0.0000
94.27 20.00 94.2800
0.0000
2,463.69 100.00 2,463.6900
5,424.80 100.00 5,424.8000
0.0000
5,631.12 100.00 5,631.1200
0.0000
16,304.93 100.00 16,304.9300
0.0000
3,744.00 100.00 3,744.0000
0.0000
1,190.40 100.00 1,190.4000
0.0000
747.51 100.00 747.5100
1,551.38 100.00 1,551.3800
170.43 100.00 170.4300
1,151.80 100.00 1,151.8000
0.0000
3,804.07 100.00 3,804.0700
2,158.20 100.00 2,158.2000
1,066.95 100.00 1,066.9500
0.0000
0.0000
2,990.88 100.00 2,990.8800
1,891.11 100.00 1,891.1100
890.53 100.00 890.5300
662.04 100.00 662.0400
0.0000
105.68 9.00 105.6800
292.76 22.00 292.7600
142.90 22.00 142.9000
38.39 4.00 38.3900
18.94 10.00 18.9400
173.70 11.00 173.7000
1,066.26 100.00 1,066.2600
249.97 100.00 249.9700
-
3/1/2012
PARCIAL %
VALORIZACION N 03
SALDO VALORIZAR
786.72 100.00 786.7200
0.0000
2,000.00 100.00 2,000.0000
109.64 3.00 109.6400
76.05 20.00 76.0500
39.21 20.00 39.2100
0.0000
0.0000
1,924.34 100.00 1,924.3400
246.66 100.00 246.6600
899.70 100.00 899.7000
0.0000
0.00 0.00 0.0000
0.00 0.00 0.0000
0.00 0.00 0.0000
0.0000
569.26 100.00 569.2600
2,066.73 100.00 2,066.7300
0.0000
618.86 66.00 618.8600
0.0000
0.0000
0.00 0.00 0.0000
790.73 100.00 790.7300
0.0000
0.0000
3,174.25 69.00 3,174.2400
0.0000
0.0000
552.07 13.00 552.0700
0.00 0.00 0.0000
463.81 25.00 463.8000
0.0000
9,851.79 100.00 9,851.7900
0.0000
948.82 100.00 948.8200
1,480.00 100.00 1,480.0000
0.0000
400.00 100.00 400.0000
34,200.00 100.00 34,200.0000
1,470.00 100.00 1,470.0000
0.0000
0.0000
4,660.00 100.00 4,660.0000
1,377.25 100.00 1,377.2500
0.0000
2,040.37 100.00 2,040.3700
0.0000
918.27 100.00 918.2700
324.29 25.00 324.2900
0.0000
-
3/1/2012
PARCIAL %
VALORIZACION N 03
SALDO VALORIZAR
0.0000
255.34 100.00 255.3400
1,793.21 100.00 1,793.2100
175.77 100.00 175.7700
45.07 100.00 45.0700
0.0000
0.0000
0.00 0.00 0.0000
0.00 0.00 0.0000
0.0000
6,855.70 100.00 6,855.7000
302.37 100.00 302.3700
0.0000
0.0000
4,863.15 100.00 4,863.1500
493.55 100.00 493.5500
0.0000
1,121.33 100.00 1,121.3300
0.0000
12,108.36 100.00 12,108.3600
23,502.50 100.00 23,502.5000
950.00 100.00 950.0000
0.0000
465.00 100.00 465.0000
4,253.26 100.00 4,253.2600
3,298.58 100.00 3,298.5800
0.0000
836.15 18.00 836.1600
3,058.94 100.00 3,058.9400
2,000.00 100.00 2,000.0000
800.00 100.00 800.0000
0.0000
0.0000
2,211.28 100.00 2,211.2800
0.0000
2,276.96 100.00 2,276.9600
0.0000
345,804.76 0.01
22,857.69 -0.01
17,290.23 -0.01
385,952.68 -0.01
69,471.48 -0.01
455,424.16 -0.02
-
3/1/2012
PARCIAL %
VALORIZACION N 03
SALDO VALORIZAR
-
OBRA AMPLIACION DEL AREA DEPORTIVA Y RECREATIVA APURIMAC MZ.A1, LT.1 Y MZ. LT. 1
PROPIETARIO MUNICIPALIDAD DE ALTO SELVA ALEGRE
CONTRATISTA CAMPUS CONTRATISTAS GENERALES S.R.L.
SUPERVISION MUNICIPALIDAD DE ALTO SELVA ALEGRE
PLAZO EJECUC 75 DIAS CALENDARIO
K= 0.097MMr+0.132BAr+0.151Dr+0.073Tr+0.257Mr+0.161ACr+0.129Ir +
MMo BAo Do To Mo ACr Io
INDICE
N DESCRIPCION COD INCID BASE INDICE INDICE INDICE INDICE
2012-Marzo
MM MADERA NACIONAL PARA ENCOFRADO Y CARPINTERIA 43 25.77% 0.025 0.097 592.79 609.61 0.026 0.098 609.23 0.026 0.098 0.00 0.000 0.000 0.00
MAQUINARIA Y EQUIPO NACIONAL 48 74.23% 0.072 327.49 328.79 0.072 327.55 0.072 0.00 0.000 0.00
BA AGREGADO GRUESO 5 46.21% 0.061 0.132 621.26 607.65 0.060 0.132 606.94 0.060 0.131 0.00 0.000 0.000 0.00
BLOQUE Y LADRILLO 17 53.79% 0.071 872.27 885.29 0.072 870.97 0.071 0.00 0.000 0.00
D DLAR MAS INFLACION DEL MERCADO USA 30 100.00% 0.151 0.151 354.39 357.75 0.152 0.152 352.41 0.150 0.150 0.00 0.000 0.000 0.00
T TUBERIA DE ACERO NEGRO 65 100.00% 0.073 0.073 259.64 258.98 0.073 0.073 249.56 0.070 0.070 0.00 0.000 0.000 0.00
M MANO DE OBRA INC. LEYES SOCIALES 47 100.00% 0.257 0.257 448.25 448.25 0.257 0.257 448.25 0.257 0.257 0.00 0.000 0.000 0.00
AC ACERO DE CONSTRUCCION LISO 3 61.49% 0.099 0.161 501.65 486.71 0.096 0.158 471.48 0.093 0.155 0.00 0.000 0.000 0.00
CEMENTO PORTLAND TIPO I 21 38.51% 0.062 423.60 423.60 0.062 423.60 0.062 0.00 0.000 0.00
I INDICE GENERAL DE PRECIOS AL CONSUMIDOR 39 100.00% 0.129 0.129 375.16 377.16 0.130 0.130 377.50 0.130 0.130 0.00 0.000 0.000 0.00
1.000 1.000 0.991 0.000
K K K
COEFICIENTE
FORMULA POLINOMICA N 03
VALORIZACION N 03
2012-JUNIO 2012-JULIO
-
0.000 0.000
0.000
0.000 0.000
0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000
0.000 0.000
0.000
K
FORMULA POLINOMICA N 03
VALORIZACION N 03
-
OBRA AMPLIACION DEL AREA DEPORTIVA Y RECREATIVA APURIMAC MZ.A1, LT.1 Y MZ. LT. 1
PROPIETARIO MUNICIPALIDAD DE ALTO SELVA ALEGRE
CONTRATISTA CAMPUS CONTRATISTAS GENERALES S.R.L.
SUPERVISION MUNICIPALIDAD DE ALTO SELVA ALEGRE
PLAZO EJECUC 75 DIAS CALENDARIO
MONTO FACTOR VALORIZACION AJUSTE
VALORIZACION (K) AJUSTADA
FORMULA N 01 PRESUPUESTO GENERAL 56,084.01 0.991 55,579.25 -504.76
CALCULO DEL REAJUSTE
DESCRIPCION
-
T TUBERIA DE PVC PARA AGUA 72 0.145
D 30 0.527
MO MANO DE OBRA INCL. LEYES SOCIALES 47 0.192
GGU INDICE GENERAL DE PRECIOS AL CONSUMIDOR39 0.136
-
10 6 0.16
200 6 0.1
2 1 6.54
2 1 25
170 6 0.1
110 1 0.1
72 1 0.1
5 0.04 114.22
5 0.03 183.61
5 0.03 111.3
1 0.03 70.62