company presentation - kariertau llp

Post on 18-Jan-2017

174 Views

Category:

Documents

4 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Company  Overview  

•  Kariertau  LLP  was  established  in  2002  and  became  one  of  the  leaders  in  excava>ng  and  supplying    aggregates  in  the  Western  part  of  Kazakhstan.    

•  The  main  ac>vi>es  of  Kariertau  include:  quarrying  and  storage  of  gravel,  high-­‐density  rock,  rubble  stone  and  construc>on  sand,  as  well  as  making  concrete  of  various  grades.  

•  Kariertau  LLP  uses  advanced  equipment  and  innova>ve  technology  to  complete  projects  within  the  >me  limits,  and  in  accordance  with  the  norms  and  standards  of  the  customer  and  the  Republic  of  Kazakhstan  

Company  Goal  

Health  and  Safety  

•  Our  priority  is  to  carry  out  works  with  zero  harm  to  the  people  and  the  environment.  To  achieve  this  goal,  we  ac>vely  conduct  audits  and  training,  and  maintain  strict  control  of  industrial  safety  at  the  company    

Products  

•  Rubble  of  various  frac>ons    •  Construc>on  sand    •  Gravel  •  Crushed  stone    •  Soil    •  Sand  and  gravel  Mix  •  Asphalt  Concrete  Mix  

•  Precast  Concrete  Elements    

Services  

•  A  wide  range  of  construc>on  services  (including  all  land  management  works);  

•  Full  range  of  services  from  explora>on  to  development  and  implementa>on  of  the  borrow  pits;    

•  Drilling  and  blas>ng;  •  Motor  vehicles  for  rent  (including  mixers,  truck  cranes,  and  dump  trucks)  

•  Таучик  (high  density  rock  quarry)  .  Loca>on:  100  km  away  from  Aktau  city.  Reserves  as  of  01.01.2014  –  3059,004  m3  

•   Zhanaorpa  (high  density  rock  quarry).  Loca>on:  5.5  km  away  from  Shetpe  village.  Reserves  as  of    01.01.2014  –  5267,84  m3  

•   Severo-­‐Vostochnoe    (limestone  quarry)  .  Loca>on:  Bau>no,  120  km  away  from  Aktau.  Reserves  as  of  01.01.2013  –  2475,296  m3  

•   Tengiz  borrow  pit  group  (5).  Loca>on:  Tengiz.  Reserves  as  of  01.01.2014  –  24232.95  m3  

•  85  (chalk  quarry).  Loca>on  :  85  km  away  from  Aktau.  Reserves  as  of  01.01.2014  –  2943,4  m3  

•  33  (chalk  quarry).  Loca>on:  33  km  away  from  Aktau.  Reserves  as  of  01.01.2014  –  295,018  m3  

Ac>ve  Borrow  Pits    

•  Kariertau  performs  open  pit  mining  of  high  density  rock  "Tauchik"  borrow  pit,  which  is  located  in  Tupkaragan  area  of  Mangistau  region.  

•  Autonomous  water  source  and  sanitary  protec>on  zone    

•  Many  companies  opera>ng  in  the  Western  Kazakhstan  purchased  the  material  from  Tauchik,  including:  «Bai  Kaz  Beton»,  Aliiance  Ltd,  «Kaskor  SMU»,  «Nemestroservis  Ltd»,    «AS  Kurylys»,  «Mangistau  DorStroi»,  and  other  companies.  

Tauchik  Borrow  Pit  

•  Kariertau  performs  mining  of  high  density  rock  at  Zhanaorpa  deposit,  which  is  located  in  Mangistau  area  of  Mangistau  region.    

•  In  2013,  produc>on  of  material  was  equal  to  –  38,1  m3.    

•  Reserves  as  of  01.01.2014  –  5267,84  m3.  

Zhanaorpa  Deposit  

•  A  group  of  5  borrow  pits  is  located  on  Tengiz  oil  field  

•  Material  excavated  from  these  borrow  pits  is  used  for  the  needs  of  Tengizchevroil    and  Kazakh  Project  Joint  Venture.    

•  The  material  is  then  used  for  construc>on  of  roads  and  backfill,  as  well  as  for  the  construc>on  of  different  facili>es.    

Tengiz  Borrow  Pits    

Offices    

Our  company  has  offices  in  several  loca>ons:    

! Tauchik  Base    ! Bau>no  Base    ! Kariertau  office    

Tauchik  Base  The  borrow  pit  is  located  in  the  district  of  Tupkaragan,  Mangistau  region,  5.7  km  east  of  Tauchik  village.  Tauchik.    

The  total  area  of  ��the  selected  mining  lease  12.9  hectares.    

The  depth  of  the  mining  lease  -­‐  up  to  69  m.  Method  of  mining  -­‐  open  pit.  Type  of  soil  -­‐  sand,  clay  

Bau-no  Base    Concrete  batching  plant,  capacity  of  120  m3  /  h  in  parts.    The  total  area  of  ��the  selected  mining  lease  -­‐  12.9  hectares.    The  depth  of  the  mining  lease  -­‐  up  to  69  m.  Method  of  mining  -­‐  open  pit.  Type  of  soil  -­‐  sand,  clay  

Kariertau  Office    Produc>on  base  with  land  located  in  the  industrial  zone  of  Aktau.    

Total  area  -­‐  237.4  sq.m,  built  in  1987.    

The  land  includes:  an  office  building,  a  u>lity  room,  2  car  garages,  a  mini  brewery,  and  a  watchtower.  

Equipment  

•  The  company  uses  new  equipment  and  technology,  which  effec>vely  influences  the  produc>vity  and  workflow  of  our  company.  Each  pit  has  the  necessary  equipment  to  carry  out  loading  and  transpor>ng  of  large  volumes  of  aggregate  material.  In  addi>on,  our  company  provides  equipment  for  rent.  

Equipment  

Partners    

•  Kariertau  LLP  is  a  contractor  company  for  Tengizchevroil  (Chevron)  since  2005.  

•  Also,  our  company  is  prequalified  to  work  with:  

•  Maersk  Oil  Kazakhstan  GMbH  •  Petrom  OMV  •  AGIP  KCO  •  KCOI  •  And  other  big  companies  that  operate  in    Western  Kazakhstan    

Prequalificavon    

•  Kariertau  LLP  is  prequalified  for  the  following  works  at  Tengizchevroil:    

•  01A  –Construc>on  Materials  –  prequalified    

•  A09  –Road  Freight  /  Hauling  Services  –  Domes>c  –  registered    

•  B16  –Engineering  –  Civil  –  registered    •  J11  –Civil  /  Earthwork  /  Founda>on  Services  -­‐  registered    

Project  Profiles    

Customer  and  project  

Products  and  volumes    

Project  period     Loca-on  

AGIP  KCO,  emergency  berms  

Rubble,  concrete  slabs,  geotex>le    

3months     Bau>no  village,  Mangistau  region    

ERSAI  Caspian  Contractor  LLC,  construc>on  of  the  offshore  berth  

Ruble  and  high-­‐density  rock    

10  days     Ersai  base,  Kuryk  village,  Mangistau  region  

Kom  Munai  LLP,    maintenance  of  roads    

Ground,  rubble     1  year     Komsomolskyi  deposit,    Mangistau  region  

Tengizchevroil,  Future  Growth  Project    

Ground   1  year   Tengiz  village,  Atyrau  region    

Recommenda>ons    

•  Customers  of  Kariertau  LLP  noted  the  high  level  of  professionalism  of  the  company  and  describe  it  as  a  reliable,  forward-­‐looking,  and  constantly  evolving.  

Our  Staff    

•  Kariertau  LLP  employs  about  140  workers.  Our  company  cooperates  with  the  employment  offices  of  Mangistau  region,  to  contribute  to  the  economic  development  of  the  region  and  create  jobs  for  local  residents.  

•  Kariertau  always  strives  to  improve  the  skill  level  of  their  employees  through  annual  language  and  professional  training  in  Kazakhstan  and  abroad.  

Our  Staff  

Cer>fica>ons    

•  Kariertau  products  were  successfully  tested  by  the  Na>onal  Exper>se  and  Cer>fica>on  Center.  All  materials  have  appropriate  cer>ficates.  

Contacts  

•  Director:  Seidaliyeva  Anar    •  Address:  Republic  of  Kazakhstan,  130000    Aktau,  Industrial  zone  1,  building  45      Email:  office@kariertau.kz  

 Тел:            +77292  304-­‐334    Факс:      +77292  304-­‐337  

top related