MINISTERIO DE TRANSPORTES Y COMUNICACIONES
OBRA : REHABILITACIÓN Y MEJORAMIENTO DE LA CARRETERA QUINUA - SAN FRANCISCO
TRAMO : KM 78+540 – KM 172+420
SUPERVISION : CONSORCIO SUPERVISOR LA QUINUA
CONTRATISTA : CONSORCIO VIAL QUINUA
CUADRO RESUMEN METRADO OBRAS DE ARTE
ALCANTARILLAS TMCProgresiva : 79+182.00
Tipo : ALC. TMC 48''
Aplicación : Cajatoma_Cabezal
ITEM DESCRIPCION UND METRADO
6 OBRAS DE ARTE Y DRENAJE601.C EXCAV. PARA ESTRUCT. EN MAT. COMUN M3 2,463.69 605.A RELLENOS PARA ESTRUCT. M3 58.08 605.B MATERIAL FILTRANTE M3 2.30 610.D1 CONCRETO CLASE D1 (F'C=210 KG/CM2) EN SECO M3 - 610.E CONCRETO CLASE H (F'C=175 KG/CM2) M3 300.85 610.G CONCRETO CLASE G (F'C=140 KG/CM2 + 30% P.G.) M3 - 610.I CONCRETO CLASE I (F'C=100 KG/CM2) M3 - 612.A ENCOF. Y DESENCOF. M2 50.91 615. A ACERO DE REFUERZO KG - 622.B TUBERIA CORRUGADA DE ACERO GALVANIZADO CIRCULAR DE 0.90 M DE DIAMETRO M 102.06 622.C TUBERIA CORRUGADA DE ACERO GALVANIZADO CIRCULAR DE 1.20 M DE DIAMETRO M 157.93 622.D TUBERIA CORRUGADA DE ACERO GALVANIZADO CIRCULAR DE 1.50 M DE DIAMETRO M - 622.E TUBERIA CORRUGADA DE ACERO GALVANIZADO CIRCULAR DE 1.80 M DE DIAMETRO M 12.15 623 PINTURA ASFALTICA PARA ALCANTARILLAS METALICAS M2 - 625.H TUBERIA DE PVC D=6" PARA MUROS - PERFORADA M - 625.I TUBERIA DE PVC D=4" PARA MUROS M 4.10 640.D PIEDRA ASENTADA Y EMOQUILL. e=0.30 m. M2 278.24 640.F PIEDRA ASENTADA Y EMOQUILL. e=0.20 m. M2 508.70
MINISTERIO DE TRANSPORTES Y COMUNICACIONES
OBRA : REHABILITACIÓN Y MEJORAMIENTO DE LA CARRETERA QUINUA - SAN FRANCISCO
TRAMO : KM 78+540 – KM 172+420
SUPERVISION : CONSORCIO SUPERVISOR LA QUINUA
CONTRATISTA : CONSORCIO VIAL QUINUA
LISTADO DE ALCANTARILLAS
ITEM TIPO
1 156+860.00 TMC 48
PROG. REPLANTEO
DIAMETRO (")
MINISTERIO DE TRANSPORTES Y COMUNICACIONES
OBRA : REHABILITACIÓN Y MEJORAMIENTO DE LA CARRETERA QUINUA - SAN FRANCISCO
TRAMO : KM 78+540 – KM 172+420
SUPERVISION : CONSORCIO SUPERVISOR LA QUINUA
CONTRATISTA : CONSORCIO VIAL QUINUA
CUADRO RESUMEN METRADO OBRAS DE ARTE (ALC ADICIONAL 05)
ALCANTARILLA 156+860.000
N°
AL
C
PR
OG
RE
SIV
A
R
EP
LA
NT
EO
ESTRUCTURA 601.C 605.A 605.B 610.D1 610.E 610.G 610.I 612.A 615. A 622.B 622.C 622.D 622.E 623 625.H 625.I 640.D 640.F
EN
TR
AD
A
SA
LID
A
KM ('') M3 M3 M3 M3 M3 M3 M3 M2 KG M M M M M2 M M M2 M2
METRADO TOTALES 126.89 58.08 2.30 - 4.35 11.59 - 50.91 - - 13.77 - - 52.74 - - 13.91 31.08
TIPO-DIAMETRO
EXCAV. PARA ESTRUCT. EN MAT. COMUN
RELLENOS PARA
ESTRUCT.
MATERIAL FILTRANTE
CONCRETO CLASE D1 (F'C=210
KG/CM2) EN SECO
CONCRETO CLASE H (F'C=175 KG/CM2)
CONCRETO CLASE G (F'C=140
KG/CM2 + 30% P.G.)
CONCRETO CLASE I (F'C=100 KG/CM2)
ENCOF. Y DESENCOF.
ACERO DE REFUERZO
TUBERIA CORRUGADA
DE ACERO GALVANIZADO CIRCULAR DE 0.90 M DE DIAMETRO
TUBERIA CORRUGADA
DE ACERO GALVANIZADO CIRCULAR DE 1.20 M DE DIAMETRO
TUBERIA CORRUGADA
DE ACERO GALVANIZADO CIRCULAR DE 1.50 M DE DIAMETRO
TUBERIA CORRUGADA
DE ACERO GALVANIZADO CIRCULAR DE 1.80 M DE DIAMETRO
PINTURA ASFALTICA
PARA ALCANTARIL
LAS METALICAS
TUBERIA DE PVC D=6"
PARA MUROS - PERFORADA
TUBERIA DE PVC D=4"
PARA MUROS
PIEDRA ASENTADA Y EMOQUILL. e=0.30 m.
PIEDRA ASENTADA Y EMOQUILL. e=0.20 m.
MINISTERIO DE TRANSPORTES Y COMUNICACIONES
OBRA : REHABILITACIÓN Y MEJORAMIENTO DE LA CARRETERA QUINUA - SAN FRANCISCO
TRAMO : KM 78+540 – KM 172+420
SUPERVISION : CONSORCIO SUPERVISOR LA QUINUA
CONTRATISTA : CONSORCIO VIAL QUINUA
CUADRO RESUMEN METRADO OBRAS DE ARTE (PROYECTO)
ALCANTARILLAS TMC
N°
AL
C
ESTRUCTURA 601.C 605.A
EN
TR
AD
A
SA
LID
A
KM ('') m3 m3
90 106+380.00 36 CAJATOMA MURO 94.45 20.3991 106+513.00 48 CAJATOMA CABEZAL 78.47 24.9192 106+840.00 36 CAJATOMA CABEZAL 55.63 16.7593 107+010.00 48 CAJATOMA CABEZAL 86.33 31.5194 107+390.00 48 CAJATOMA CABEZAL 100.78 28.45
103 110+520.00 48 CAJATOMA CABEZAL 86.13 31.05130 118+978.00 48 CAJATOMA MURO 92.84 24.58131 119+260.00 36 CAJATOMA CABEZAL 75.15 20.51132 119+570.00 48 CAJATOMA CABEZAL 72.01 25.13133 119+773.00 48 CAJATOMA CABEZAL 208.23 28.17134 120+156.00 48 CAJATOMA CABEZAL 100.58 25.06135 120+280.00 36 CAJATOMA CABEZAL 83.03 19.57136 120+680.00 48 CAJATOMA MURO 130.88 24.68137 120+825.00 36 CAJATOMA CABEZAL 58.94 17.81138 121+000.00 48 CABEZAL CABEZAL 119.92 79.81141 121+740.00 36 CAJATOMA CABEZAL 130.57 19.54145 122+660.00 72 CABEZAL CABEZAL 117.99 42.39146 122+900.00 36 CAJATOMA MURO 89.41 21.37147 123+220.00 36 CAJATOMA CABEZAL 55.08 16.84149 123+720.00 36 CAJATOMA CABEZAL 63.65 21.83150 124+025.00 36 CAJATOMA CABEZAL 54.49 17.60151 124+570.00 48 CAJATOMA CABEZAL 96.43 27.73152 124+830.52 48 CAJATOMA CABEZAL 135.70 26.48153 125+122.00 48 CAJATOMA CABEZAL 67.41 25.70154 125+220.00 48 CAJATOMA CABEZAL 99.11 25.35155 125+402.00 36 CAJATOMA CABEZAL 105.94 19.09157 126+010.00 48 CAJATOMA CABEZA 107.58 28.61
METRADO TOTAL 2,566.73 710.91
PR
OG
RE
SIV
A
P
RO
YE
CT
O
TIPO-DIAMETRO EXCAV. PARA
ESTRUCT. EN MAT. COMUN
RELLENOS PARA ESTRUCT.
CUADRO RESUMEN METRADO OBRAS DE ARTE (PROYECTO)
ALCANTARILLAS TMC
605.B 610.D1 610.E 610.G 610.I 612.A
m3 m3 m3 m3 m3 m2
5.69 20.8010.50 49.50
8.43 39.3610.50 49.5010.50 49.5010.50 49.50
6.95 26.078.43 39.36
10.50 49.5010.50 49.5010.50 49.50
8.43 39.366.95 26.078.43 39.367.10 46.868.43 39.36
12.30 77.005.69 20.808.43 39.368.43 39.368.43 39.36
10.50 49.5010.50 49.5010.50 49.5010.50 49.50
8.43 39.3610.50 49.50
- - 246.55 - - 1,165.84
MATERIAL FILTRANTE
CONCRETO CLASE D1 (F'C=210
KG/CM2) EN SECOMUROS CABEZAL
CONCRETO CLASE E (F'C=175 KG/CM2)
CONCRETO CLASE G (F'C=140 KG/CM2
+ 30% P.G.)
CONCRETO CLASE I (F'C=100 KG/CM2)
ENCOF. Y DESENCOF.
CUADRO RESUMEN METRADO OBRAS DE ARTE (PROYECTO)
ALCANTARILLAS TMC
615.A 622.B 622.C 622.D 622.E 623
Kg m m m m m2
9.72 - 8.91 - - - - 9.72 - - -
10.53 - 9.72 - 9.72 - 8.918.91
10.538.91 - - - - 8.91
-
- 104.49 - - - -
ACERO DE REFUERZO
TUBERIA CORRUGADA DE
ACERO GALVANIZADO
CIRCULAR DE 0.90 M DE DIAMETRO
TUBERIA CORRUGADA DE
ACERO GALVANIZADO
CIRCULAR DE 1.20 M DE DIAMETRO
TUBERIA CORRUGADA DE
ACERO GALVANIZADO
CIRCULAR DE 1.50 M DE DIAMETRO
TUBERIA CORRUGADA DE
ACERO GALVANIZADO
CIRCULAR DE 1.80 M DE DIAMETRO
PINTURA ASFALTICA PARA ALCANTARILLAS
METALICAS
1 Cajatoma
CUADRO RESUMEN METRADO OBRAS DE ARTE (PROYECTO)
ALCANTARILLAS TMC
625.H 625.I 640.D 640.F
m m m2 m2
0.89 8.091.02 5.28 - 1.051.02 121.02 12.841.02 8.88 - 5.52 - 1.051.02 18.121.02 16.44 - 1.2 - 1.051.02 12.84 - 1.05 - 30.720.89 16.8 - 1.50.89 12.71 - 1.05 - 1.05 - 1.05 - 1.21.02 11.52 - 1.2 - 79.440.89 5.67 - 1.2
- - 11.72 270.52
TUBERIA DE PVC 6'' PARA MUROS -
PERFORADA
TUBERIA DE PVC 4'' PARA MUROS
PIEDRA ASENTADA Y
EMOQUILL. e=0.30 m.
PIEDRA ASENTADA Y
EMOQUILL. e=0.20 m.
Cabezal
MINISTERIO DE TRANSPORTES Y COMUNICACIONES
OBRA : REHABILITACIÓN Y MEJORAMIENTO DE LA CARRETERA QUINUA - SAN FRANCISCO
TRAMO : KM 78+540 – KM 172+420
SUPERVISION : CONSORCIO SUPERVISOR LA QUINUA
CONTRATISTA : CONSORCIO VIAL QUINUA
CUADRO COMPARATIVO METRADO REPLANTEO Vs PROYECTO
ALCANTARILLAS TMCMETRADO REPLANTEO
N°
AL
C
PR
OG
RE
SIV
A
RE
PL
AN
TE
O ESTRUCTURA 601.C 605.A 605.B 610.D1 610.E 610.G 610.I 612.A 615. A 622.B 622.C 622.D 622.E 623 625.H 625.I 640.D 640.F
EN
TR
AD
A
SA
LID
A
KM ('') M3 M3 M3 M3 M3 M3 M3 M2 KG M M M M M2 M M M2 M2
1 79+182.00 TMC-36'' Cajatoma Cabezal Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
2 79+494.00 TMC-72'' Cabezal Cabezal Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
3 79+998.00 TMC-72'' Cabezal Cabezal - - - - - - - - - - - - - - - - - -
4 80+315.00 TMC-36'' Cajatoma Cabezal Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
5 80+460.00 TMC-72'' Cabezal Cabezal Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
6 80+805.00 TMC-48'' Cabezal Cabezal Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
7 83+120.00 TMC-48'' Cajatoma Cabezal Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
8 83+402.00 TMC-48'' Cajatoma Muro-2.80m-CC Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
9 83+800.00 TMC-36'' Cajatoma Cabezal - - - - - - - - - - - - - - - - - -
10 84+240.00 TMC-48'' Cabezal Cabezal - - - - - - - - - - - - - - - - - -
11 84+572.70 TMC-48'' Cajatoma Cabezal Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
12 85+007.00 TMC-72'' Cabezal Muro-3.50m-CA Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
METRADO TOTALES Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
METRADO PROYECTO
N°
AL
C
ESTRUCTURA 601.C 605.A 605.B 610.D1 610.E 610.G 610.I 612.A 615.A 622.B 622.C 622.D 622.E 623 625.H 625.I 640.D 640.F
EN
TR
AD
A
SA
LID
A
KM ('') m3 m3 m3 m3 m3 m3 m3 m2 Kg m m m m m2 m m m2 m2 1 79,175.00 TMC-36" CAJATOMA CABEZAL 82.27 20.17 - - 8.43 - - 39.36 - 9.72 - - - - - - 0.89 10.50 2 79,490.00 TMC-72" CABEZAL CABEZAL 505.12 49.08 - - 12.30 - - 77.00 - - - - 12.15 - - - - 130.20 3 79,998.00 TMC-72" CABEZAL CABEZAL - - - - - - - - - - - - - - - - - - 4 80,315.00 TMC-36" CAJATOMA CABEZAL 94.34 24.97 - - 8.43 - - 39.36 - 10.53 - - - - - - 3.30 49.88 5 80,460.00 TMC-72" CABEZAL CABEZAL 212.55 40.34 - - 12.30 - - 77.00 - - - - 11.34 - - - - 26.55 6 80,790.00 TMC-48" CABEZAL CABEZAL 268.82 25.36 - - 7.10 - - 46.86 - - 9.72 - - - - - - 110.64 7 83,120.00 TMC-48" CABEZAL CABEZAL 132.42 28.68 - - 7.10 - - 46.86 - - 11.34 - - - - - - 31.56 8 83,420.00 TMC-48" CABEZAL CABEZAL 158.62 29.13 - - 7.10 - - 46.86 - - 10.53 - - - - - - 31.56 9 83,870.00 TMC-36" CAJATOMA CABEZAL - - - - - - - - - - - - - - - - - - 10 84,240.00 TMC-48" CABEZAL CABEZAL - - - - - - - - - - - - - - - - - - 11 84,650.00 TMC-48" CABEZAL CABEZAL 283.36 31.87 - - 7.10 - - 46.86 - - 11.34 - - - - - 4.74 58.44 12 85,005.00 TMC-72" CABEZAL MURO 225.99 40.53 - - 9.09 - - 47.02 - - - - 11.34 - - - - 59.25
METRADO TOTAL 1,963.49 290.13 - - 78.95 - - 467.18 - 20.25 42.93 - 34.83 - - - 8.93 508.58
VARIACIÓN METRADO PROYECTO Vs REPLANTEO Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
TIPO-DIAMETRO
EXCAV. PARA ESTRUCT. EN MAT. COMUN
RELLENOS PARA
ESTRUCT.
MATERIAL FILTRANTE
CONCRETO CLASE D1 (F'C=210
KG/CM2) EN SECO
CONCRETO CLASE H (F'C=175 KG/CM2)
CONCRETO CLASE G (F'C=140
KG/CM2 + 30% P.G.)
CONCRETO CLASE I (F'C=100 KG/CM2)
ENCOF. Y DESENCOF.
ACERO DE REFUERZO
TUBERIA CORRUGADA
DE ACERO GALVANIZADO CIRCULAR DE 0.90 M DE DIAMETRO
TUBERIA CORRUGADA
DE ACERO GALVANIZADO CIRCULAR DE 1.20 M DE DIAMETRO
TUBERIA CORRUGADA
DE ACERO GALVANIZADO CIRCULAR DE 1.50 M DE DIAMETRO
TUBERIA CORRUGADA
DE ACERO GALVANIZADO CIRCULAR DE 1.80 M DE DIAMETRO
PINTURA ASFALTICA
PARA ALCANTARILL
AS METALICAS
TUBERIA DE PVC D=6"
PARA MUROS - PERFORADA
TUBERIA DE PVC D=4"
PARA MUROS
PIEDRA ASENTADA Y EMOQUILL. e=0.30 m.
PIEDRA ASENTADA Y EMOQUILL. e=0.20 m.
PR
OG
RE
SIV
A
P
RO
YE
CT
O
TIPO-DIAMETRO EXCAV. PARA
ESTRUCT. EN MAT. COMUN
RELLENOS PARA
ESTRUCT.
MATERIAL FILTRANTE
CONCRETO CLASE D1 (F'C=210
KG/CM2) EN SECO
MUROS CABEZAL
CONCRETO CLASE E (F'C=175 KG/CM2)
CONCRETO CLASE G (F'C=140
KG/CM2 + 30% P.G.)
CONCRETO CLASE I (F'C=100 KG/CM2)
ENCOF. Y DESENCOF.
ACERO DE REFUERZO
TUBERIA CORRUGADA
DE ACERO GALVANIZADO CIRCULAR DE 0.90 M DE DIAMETRO
TUBERIA CORRUGADA
DE ACERO GALVANIZADO CIRCULAR DE 1.20 M DE DIAMETRO
TUBERIA CORRUGADA
DE ACERO GALVANIZADO CIRCULAR DE 1.50 M DE DIAMETRO
TUBERIA CORRUGADA
DE ACERO GALVANIZADO CIRCULAR DE 1.80 M DE DIAMETRO
PINTURA ASFALTICA
PARA ALCANTARILL
AS METALICAS
TUBERIA DE PVC 6'' PARA
MUROS - PERFORADA
TUBERIA DE PVC 4'' PARA
MUROS
PIEDRA ASENTADA Y EMOQUILL. e=0.30 m.
PIEDRA ASENTADA Y EMOQUILL. e=0.20 m.
ESTRUCTURAPROYECTO REPLANTEO ENTRADA SALIDA
1 79+175.00 79+182.00 TMC-36'' Cajatoma Cabezal
2 79+490.00 79+494.00 TMC-72'' Cabezal Cabezal
3 79+998.00 79+998.00 TMC-72'' Cabezal Cabezal
4 80+315.00 80+315.00 TMC-36'' Cajatoma Muro-3.00m-CC
5 80+460.00 80+460.00 TMC-72'' Cabezal Cabezal
6 80+790.00 80+805.00 TMC-48'' Cabezal Cabezal
7 83+120.00 83+120.00 TMC-48'' Cajatoma Cabezal
8 83+420.00 83+402.00 TMC-48'' Cajatoma Muro-2.80m-CC
9 83+870.00 83+800.00 TMC-36'' Cajatoma Cabezal
10 84+240.00 84+240.00 TMC-48'' Cabezal Cabezal
11 84+650.00 84+572.70 TMC-48'' Cajatoma Cabezal
12 85+005.00 85+007.00 TMC-72'' Cabezal Muro-3.50m-CA
13 85+360.00 85+360.00 TMC-48'' Cajatoma Muro
14 85+800.00 85+780.00 TMC-48'' Cajatoma Cabezal
15 86+180.00 86+220.00 TMC-36'' Cajatoma Cabezal
16 86+545.00 86+541.00 TMC-48'' Cajatoma Cabezal
17 87+005.00 86+954.00 TMC-48'' Cajatoma Muro-3.30m-C
18 87+420.00 87+418.00 TMC-48'' Cajatoma Cabezal
19 87+850.00 87+900.00 TMC-48'' Cajatoma Cabezal
20 88+180.00 88+180.00 TMC-36'' Cajatoma Cabezal
21 88+260.00 88+260.00 TMC-48'' Cajatoma Cabezal
22 88+620.00 88+620.00 TMC-48'' Cajatoma Cabezal
23 89+020.00 89+020.00 TMC-48'' Cajatoma Cabezal
24 89+405.00 89+405.00 TMC-72'' Cabezal Cabezal
25 89+780.00 89+780.00 TMC-36'' Cajatoma Cabezal
26 89+870.00 89+870.00 TMC-36'' Cajatoma Cabezal
27 90+095.00 90+180.00 TMC-36'' Cajatoma Cabezal
28 90+340.00 90+334.00 TMC-36'' Cajatoma Cabezal
29 90+605.00 90+606.00 TMC-72'' Cabezal Cabezal
30 90+860.00 90+862.00 TMC-48'' Cajatoma Cabezal
31 91+155.00 91+155.00 TMC-36'' Cajatoma Cabezal
32 91+530.00 91+528.30 TMC-48'' Cajatoma Cabezal
33 91+840.00 91+800.00 TMC-36'' Cajatoma Cabezal
34 91+955.00 91+955.00 TMC-48'' Cajatoma Muro-2.80m-CC
35 92+235.00 92+235.00 TMC-36'' Cajatoma Muro-3.30m-CC
36 92+600.00 92+562.00 TMC-48'' Cajatoma Cabezal
37 92+882.00 92+882.00 TMC-72'' Cabezal Cabezal
38 93+162.00 93+162.00 TMC-48'' Cabezal Cabezal
39 93+610.00 93+610.00 TMC-72'' Cajatoma Cabezal
40 93+810.00 93+810.00 TMC-48'' Cajatoma Cabezal
41 94+180.00 94+180.00 TMC-48'' Cabezal Muro-3.30m-CC
42 94+580.00 94+532.00 TMC-36'' Cajatoma Cabezal
43 94+700.00 94+696.00 TMC-36'' Cajatoma Cabezal
44 94+820.00 94+820.00 TMC-36'' Cajatoma Cabezal
45 95+050.00 94+049.00 TMC-72'' Cabezal Cabezal
46 95+110.00 95+112.00 TMC-72'' Cabezal Muro-3.30m-CC
N° ALC
PROGRESIVA(Km)
TIPO-DIAMETRO
('')
47 95+270.00 95+270.00 TMC-48'' Cabezal Cabezal
48 95+440.00 95+440.00 TMC-48'' Cajatoma Muro-3.80m-CA
49 95+800.00 95+800.00 TMC-48'' Cajatoma Muro-2.80m-CC
50 96+140.00 96+085.00 TMC-36'' Cajatoma Muro
51 96+500.00 96+536.00 TMC-36'' Cajatoma Cabezal
52 96+880.00 96+850.00 TMC-36'' Cajatoma Cabezal
53 97+020.00 TMC-36'' Cajatoma Cabezal
54 97+160.00 97+120.00 TMC-36'' Cajatoma Cabezal
55 97+380.00 97+310.00 TMC-36'' Cajatoma Cabezal
56 97+600.00 97+670.00 TMC-48'' Cajatoma Cabezal
57 97+870.00 97+870.00 TMC-36'' Cajatoma Cabezal
58 98+010.00 TMC-36'' Cajatoma Cabezal
59 98+120.00 98+185.00 TMC-36'' Cajatoma Cabezal
60 98+260.00 98+260.00 TMC-36'' Cajatoma Cabezal
61 98+450.00 98+450.00 TMC-48'' Cajatoma Cabezal
62 98+530.00 TMC-48'' Cajatoma Cabezal
63 98+620.00 89+610.00 TMC-36'' Cajatoma Cabezal
64 98+925.00 98+925.00 TMC-48'' Cajatoma Cabezal
65 99+140.00 99+140.00 TMC-36'' Cajatoma Cabezal
66 99+491.00 99+490.00 TMC-48'' Cajatoma Cabezal
67 99+730.00 99+780.00 TMC-36'' Cajatoma Cabezal
68 100+230.00 100+235.00 TMC-36'' Cajatoma Muro-2.80m-CC
69 100+680.00 100+670.00 TMC-36'' Cajatoma Cabezal
70 100+880.00 100+878.00 TMC-36'' Cajatoma Cabezal
71 101+311.00 101+311.00 TMC-36'' Cajatoma Muro
72 101+370.00 101+370.00 TMC-36'' Cajatoma Cabezal
73 101+420.00 101+440.00 TMC-36'' Cajatoma Cabezal
74 101+700.00 101+698.00 TMC-36'' Cajatoma Muro-2.80m-CC
75 101+740.00 101+745.00 TMC-48'' Cajatoma Muro-2.80m-CC
76 102+100.00 102+097.50 TMC-60'' Cajatoma Cabezal
77 102+300.00 102+271.00 TMC-36'' Cajatoma Cabezal
78 102+670.00 102+675.00 TMC-36'' Cajatoma Muro
79 102+860.00 102+860.00 TMC-36'' Cajatoma Cabezal
80 103+060.00 103+060.00 TMC-36'' Cabezal Cabezal
81 103+310.00 103+300.00 TMC-36'' Cabezal Cabezal
82 103+560.00 103+560.00 TMC-36'' Cajatoma Muro-2.80m-CC
83 104+120.00 104+120.00 TMC-48'' Cajatoma Cabezal
84 104+460.00 10+460.00 TMC-48'' Cajatoma Cabezal
85 104+880.00 104+880.00 TMC-36'' Cajatoma Cabezal
86 105+140.00 105+140.00 TMC-36'' Cajatoma Muro-2.80m-CC
87 105+420.00 105+420.00 TMC-36'' Cajatoma Cabezal
88 105+980.00 105+980.00 TMC-36'' Cajatoma Muro-2.80m-CC
89 106+220.00 106+220.00 TMC-36'' Cajatoma Cabezal
90 106+380.00 106+380.00 TMC-36'' Cajatoma Muro-2.80m-CC
91 106+512.00 106+513.00 TMC-48'' Cajatoma Cabezal
92 106+840.00 106+840.00 TMC-36'' Cajatoma Cabezal
93 107+010.00 107+010.00 TMC-48'' Cajatoma Cabezal
94 107+390.00 107+390.00 TMC-48'' Cajatoma Cabezal
95 107+550.00 107+544.00 TMC-36'' Cajatoma Muro-3.30m-CC
96 107+840.00 107+840.00 TMC-36'' Cajatoma Cabezal
97 108+480.00 108+480.00 TMC-36'' Cajatoma Cabezal
98 108+700.00 108+800 TMC-36'' Cajatoma Muro
99 109+000.00 109+000 TMC-48'' Cajatoma Cabezal
100 109+730.00 109+720 TMC-48'' Cajatoma Muro
101 109+980.00 109+985.00 TMC-36'' Cajatoma Cabezal
102 110+220.00 110+230.00 TMC-36'' Cajatoma Muro-2.80m-CC
103 110+520.00 110+520.00 TMC-48'' Cajatoma Cabezal
104 110+820.00 110+810.00 TMC-36'' Cajatoma Muro-3.30m-CC
105 111+100.00 111+110.00 TMC-36'' Cajatoma Cabezal
106 111+340.00 111+340.00 TMC-36'' Cajatoma Cabezal
107 111+640.00 111+640.00 TMC-36'' Cajatoma Muro-3.30m-CC
108 111+856.00 TMC-48'' Cajatoma Cabezal
109 112+080.00 TMC-36'' Cajatoma Cabezal
110 112+320.00 TMC-48'' Cajatoma Cabezal
111 112+900.00 TMC-48'' Cajatoma Cabezal
112 113+240.00 TMC-36'' Cajatoma Cabezal
113 113+540.00 113+540.00 TMC-48'' Cajatoma Cabezal
114 113+740.00 113+740.00 TMC-36'' Cajatoma Cabezal
115 114+020.00 114+020.00 TMC-48'' Cajatoma Cabezal
116 114+280.00 114+280.00 TMC-36'' Cajatoma Cabezal
117 114+540.00 114+540.00 TMC-48'' Cajatoma Cabezal
118 114+858.00 114+858.00 TMC-48'' Cajatoma Cabezal
119 115+158.00 115+158.00 TMC-36'' Cajatoma Cabezal
120 115+535.00 115+535.00 TMC-36'' Cajatoma Cabezal
121 115+800.00 115+800.00 TMC-36'' Cajatoma Cabezal
122 116+090.00 116+090.00 TMC-48'' Cajatoma Cabezal
123 116+390.00 116+390.00 TMC-36'' Cajatoma Cabezal
124 116+640.00 116+640.00 TMC-36'' Cajatoma Cabezal
125 116+940.00 TMC-36'' Cajatoma Cabezal
126 117+540.00 TMC-36'' Cajatoma Muro
127 117+780.00 TMC-36'' Cajatoma Cabezal
128 118+320.00 TMC-36'' Cajatoma Muro
129 118+560.00 TMC-36'' Cajatoma Cabezal
130 119+000.00 118+978.00 TMC-48'' Cajatoma Cabezal
131 119+260.00 119+260.00 TMC-36'' Cajatoma Cabezal
132 119+571.00 119+570.00 TMC-48'' Cajatoma Cabezal
133 119+760.00 119+773.00 TMC-48'' Cajatoma Cabezal
134 120+156.00 120+156.00 TMC-48'' Cajatoma Cabezal
135 120+280.00 120+280.00 TMC-36'' Cajatoma Cabezal
136 120+680.00 120+680.00 TMC-48'' Cajatoma Muro-2.80m-CC
137 120+825.00 120+825.00 TMC-36'' Cajatoma Cabezal
138 121+000.00 121+000.00 TMC-48'' Cabezal Cabezal
139 121+450.00 121+450.00 TMC-48'' Cajatoma Cabezal
140 121+580.00 121+580.00 TMC-36'' Cajatoma Cabezal
141 121+740.00 121+740.00 TMC-36'' Cajatoma Cabezal
142 121+900.00 121+901.50 TMC-36'' Cajatoma Cabezal
143 122+087.00 122+077.50 TMC-36'' Cajatoma Cabezal
144 122+380.00 122+380.00 TMC-36'' Cajatoma Muro-3.30m-CC
145 122+660.00 122+660.00 TMC-72'' Cabezal Cabezal
146 122+900.00 122+900.00 TMC-36'' Cajatoma Muro-3.50m-CA
147 123+220.00 123+220.00 TMC-36'' Cajatoma Cabezal
148 123+460.00 123+460.00 TMC-36'' Cajatoma Cabezal
149 123+720.00 123+720.00 TMC-36'' Cajatoma Cabezal
150 124+025.00 124+025.00 TMC-36'' Cajatoma Cabezal
151 124+580.00 124+570.00 TMC-48'' Cajatoma Cabezal
152 124+830.00 124+830.52 TMC-48'' Cajatoma Muro-3.00m-CC
153 125+123.00 125+122.00 TMC-48'' Cajatoma Cabezal
154 125+225.00 125+220.00 TMC-48'' Cajatoma Cabezal
155 125+400.00 125+402.00 TMC-36'' Cajatoma Muro-2.80m-CC
156 125+920.00 125+916.00 TMC-36'' Cajatoma Cabezal
157 126+010.00 126+010.00 TMC-48'' Cajatoma Cabezal
158 126+095.00 126+095.00 TMC-48'' Cajatoma Cabezal
159 126+157.00 126+157.00 TMC-72'' Cajatoma Muro
160 126+460.00 126+460.00 TMC-48'' Cajatoma Cabezal
161 126+648.00 TMC-72'' Cajatoma Muro
162 126+800.00 126+800.00 TMC-48'' Cajatoma Cabezal
163 127+260.00 TMC-36'' Cajatoma Cabezal
164 127+340.00 TMC-36'' Cajatoma Cabezal
165 128+250.00 TMC-48'' Cajatoma Cabezal
166 128+447.00 128+447.00 TMC-48'' Cajatoma Cabezal
167 128+587.00 128+587.00 TMC-48'' Cajatoma Cabezal
168 128+749.00 TMC-36'' Cabezal Cabezal
169 129+001.00 TMC-36'' Cabezal Cabezal
170 129+244.00 TMC-72'' Cabezal Muro
171 129+335.00 129+335.00 TMC-36'' Cabezal Cabezal
172 129+660.00 TMC-36'' Cajatoma Cabezal
173 129+840.00 129+844.50 TMC-48'' Cajatoma Cabezal
174 130+410.00 TMC-48'' Cajatoma Muro
175 130+717.00 TMC-36'' Cajatoma Cabezal
176 131+010.00 131+010.00 TMC-36'' Cajatoma Muro-2.80m-CC
177 131+247.00 131+246.00 TMC-36'' Cajatoma Muro-2.80m-CC
178 131+467.00 131+467.00 TMC-36'' Cajatoma Muro-2.80m-CC
179 131+615.00 131+615.00 TMC-36'' Cajatoma Muro-2.80m-CC
180 131+862.00 131+862.00 TMC-36'' Cajatoma Cabezal
181 132+038.00 132+038.00 TMC-72'' Cabezal Muro-6.00m-CA
182 132+242.00 132+240.55 TMC-36'' Cabezal Cabezal
183 132+443.00 132+442.50 TMC-36'' Cajatoma Cabezal
184 132+711.00 132+710.50 TMC-36'' Cajatoma Cabezal
185 132+959.00 132+959.25 TMC-36'' Cajatoma Cabezal
186 133+144.00 133+144.50 TMC-36'' Cajatoma Cabezal
187 133+360.00 133+360.00 TMC-48'' Cajatoma Muro-2.80m-CC
188 133+584.00 133+582.00 TMC-36'' Cajatoma Muro
189 133+833.00 133+832.15 TMC-36'' Cajatoma Muro
190 134+059.00 134+060.00 TMC-48'' Cajatoma Muro-2.80m-CC
191 134+282.00 134+280.00 TMC-36'' Cajatoma Muro-2.80m-CC
192 134+517.00 131+517.00 TMC-36'' Cajatoma Cabezal
193 134+665.00 134+665.00 TMC-36'' Cajatoma Muro-2.80m-CC
194 134+815.00 134+817.00 TMC-36'' Cajatoma Cabezal
195 135+080.00 TMC-36'' Cajatoma Cabezal
196 135+512.00 135+511.00 TMC-36'' Cajatoma Cabezal
197 135+551.00 135+553.00 TMC-48'' Cajatoma Cabezal
198 135+734.00 TMC-36'' Cajatoma Cabezal
199 135+871.00 TMC-36'' Cajatoma Muro
200 136+171.00 TMC-36'' Cajatoma Cabezal
201 136+485.00 136+485.00 TMC-36'' Cajatoma Cabezal
202 136+730.00 136+728.00 TMC-36'' Cajatoma Cabezal
203 136+913.00 136+914.50 TMC-36'' Cabezal Cabezal
204 137+230.00 137+230.00 TMC-36'' Cajatoma Muro-3.30m-CA
205 137+440.00 137+439.00 TMC-36'' Cajatoma Muro-2.80m-CC
206 137+638.00 137+628.00 TMC-36'' Cajatoma Muro-2.80m-CC
207 138+029.00 138+029.00 TMC-36'' Cajatoma Muro
208 138+357.00 138+358.00 TMC-36'' Cajatoma Muro-2.80m-CC
209 138+710.00 138+710.00 TMC-36'' Cajatoma Cabezal
210 139+077.00 139+077.00 TMC-36'' Cajatoma Cabezal
211 139+290.00 139+290.00 TMC-36'' Cajatoma Muro-2.80m-CC
212 139+506.00 139+507.00 TMC-36'' Cajatoma Muro-2.80m-CC
213 139+722.00 139+679.00 TMC-48'' Cajatoma Cabezal
214 140+345.00 TMC-36'' Cajatoma Muro
215 140+674.00 TMC-48'' Cajatoma Muro
216 140+810.00 140+814.50 TMC-36'' Cajatoma Cabezal
217 141+094.00 141+094.00 TMC-48'' Cajatoma Cabezal
218 141+232.00 141+231.00 TMC-48'' Cajatoma Cabezal
219 141+396.00 TMC-36'' Cajatoma Muro
220 141+536.00 TMC-48'' Cajatoma Muro
221 141+763.00 141+763.00 TMC-36'' Cajatoma Muro-3.80m-CA
222 141+968.00 141+968.00 TMC-48'' Cajatoma Muro-3.80m-CA
223 142+194.00 142+194.00 TMC-48'' Cajatoma Muro-2.80m-CC
224 142+400.00 142+400.00 TMC-48'' Cajatoma Muro-3.80m-CA
225 142+623.00 COMPL LEV. TMC-48'' Cajatoma Cabezal
226 142+880.00 142+894.50 TMC-36'' Cajatoma Cabezal
227 143+231.00 143+230.00 TMC-36'' Cajatoma Cabezal
228 143+616.00 143+615.00 TMC-72'' Cabezal Muro-3.80m-CA
229 143+862.00 143+860.00 TMC-36'' Cajatoma Cabezal
230 144+256.00 144+256.00 TMC-48'' Cabezal Cabezal
231 144+514.00 144+514.00 TMC-48'' Cajatoma Muro-3.50m-CA
232 144+797.00 144+798.00 TMC-48'' Cabezal Cabezal
233 145+075.00 ver campo TMC-36'' Cabezal Muro
234 145+198.00 145+198.00 TMC-48'' Cajatoma Cabezal
235 145+265.00 145+265.00 TMC-48'' Cajatoma Cabezal
236 145+359.00 145+357.00 TMC-36'' Cajatoma Cabezal
237 145+539.00 TMC-48'' Cajatoma Cabezal
238 145+887.00 145+886.00 TMC-48'' Cajatoma Muro
239 146+470.00 146+470.00 TMC-48'' Cajatoma Cabezal
240 146+774.00 146+772.00 TMC-36'' Cajatoma Muro-2.85m-CC
241 147+174.00 147+173.50 TMC-36'' Cajatoma Cabezal
242 147+602.00 147+597.00 TMC-48'' Cajatoma Cabezal
243 148+015.00 148+016.00 TMC-36'' Cajatoma Muro-3.80m-CA
244 148+300.00 148+308.00 TMC-36'' Cajatoma Cabezal
245 148+409.00 148+408.50 TMC-36'' Cajatoma Cabezal
246 148+520.00 148+520.00 TMC-48'' Cajatoma Cabezal
247 148+680.00 TMC-60'' Cajatoma Cabezal
248 148+762.00 TMC-60'' Cajatoma Cabezal
249 149+230.00 149+198.50 TMC-48'' Cajatoma Cabezal
250 149+460.00 149+458.00 TMC-36'' Cajatoma Muro-3.80m-CA
251 149+615.00 ver campo TMC-72'' Cajatoma Muro
252 149+664.00 149+660.00 TMC-36'' Cajatoma Cabezal
253 149+852.00 TMC-36'' Cajatoma Muro
254 149+930.00 TMC-36'' Cajatoma Cabezal
255 150+150.00 150+149.50 TMC-36'' Cajatoma Cabezal
256 150+456.00 150+455.50 TMC-36'' Cajatoma Cabezal
257 150+725.00 150+728.00 TMC-36'' Cajatoma Cabezal
258 150+983.00 150+987.00 TMC-48'' Cajatoma Muro-2.80m-CC
259 151+222.00 151+222.00 TMC-72'' Cabezal Cabezal
260 151+453.00 151+452.00 TMC-48'' Cabezal Cabezal
261 151+782.00 151+779.00 TMC-48'' Cajatoma Cabezal
262 151+952.00 151+951.00 TMC-36'' Cajatoma Cabezal
263 152+143.00 152+141.50 TMC-36'' Cajatoma Cabezal
264 152+462.00 152+461.00 TMC-36'' Cabezal Cabezal
265 152+640.00 152+638.00 TMC-72'' Cabezal Muro-4.30m-CA
266 152+720.00 152+723.00 TMC-72'' Cabezal Cabezal
267 152+831.00 152+830.00 TMC-48'' Cabezal Muro-6.00m-CA
268 153+360.00 153+360.00 TMC-48'' Cabezal Muro
269 153+691.00 153+690.00 TMC-48'' Cajatoma Muro-3.80m-CA
270 153+935.00 153+935.00 TMC-36'' Cabezal Cabezal
271 154+270.00 154+270.00 TMC-48'' Cajatoma Cabezal
272 154+722.00 154+719.50 TMC-48'' Cabezal Muro-3.80m-CA
273 154+883.00 154+881.00 TMC-36'' Cajatoma Cabezal
274 155+314.00 155+312.00 TMC-60'' Cabezal Muro-5.30m-CA
275 155+447.00 155+447.00 TMC-48'' Cabezal Muro-2.80m-CC
276 155+584.00 155+582.00 TMC-48'' Cabezal Cabezal
277 155+954.00 TMC-36'' Cabezal Cabezal
278 156+236.00 156+234.00 TMC-36'' Cajatoma Cabezal
279 156+488.00 156+489.00 TMC-48'' Cajatoma Cabezal
280 156+702.00 156+700.00 TMC-48'' Cabezal Cabezal
281 157+080.00 157+080.00 TMC-48'' Cabezal Cabezal
282 157+370.00 157+370.00 TMC-48'' Cajatoma Cabezal
283 157+640.00 157+638.00 TMC-48'' Cabezal Muro-2.80m-CC
284 157+916.00 157+914.50 TMC-36'' Cajatoma Cabezal
285 158+192.00 158+189.50 TMC-36'' Cabezal Cabezal
286 158+363.00 158+362.00 TMC-36'' Cajatoma Cabezal
287 158+598.00 158+596.00 TMC-48'' Cabezal Cabezal
288 158+889.00 TMC-48'' Cajatoma Cabezal
289 159+009.00 TMC-48'' Cajatoma Cabezal
290 159+082.00 TMC-60'' Cabezal Muro
291 159+360.00 TMC-36'' Cabezal Muro
292 159+537.00 TMC-60'' Cabezal Muro
293 159+708.00 TMC-48'' Cajatoma Muro
294 159+854.00 159+854.00 TMC-48'' Cabezal Muro-2.80m-CC
295 160+105.00 160+102.00 TMC-48'' Cabezal Cabezal
296 160+330.00 160+330.00 TMC-36'' Cajatoma Cabezal
297 160+470.00 160+470.00 TMC-36'' Cajatoma Cabezal
298 160+619.00 160+618.00 TMC-48'' Cajatoma Cabezal
299 160+760.00 160+760.00 TMC-48'' Cabezal Cabezal
300 160+854.00 160+854.00 TMC-48'' Cabezal Cabezal
301 160+974.00 TMC-36'' Cabezal Cabezal
302 161+128.00 TMC-48'' Cabezal Muro
303 161+249.00 TMC-36'' Cabezal Cabezal
304 161+323.00 161+350.00 TMC-48'' Cabezal Cabezal
305 161+493.00 161+491.00 TMC-48'' Cabezal Cabezal
306 161+635.00 161+627.00 TMC-48'' Cabezal Cabezal
307 161+715.00 161+710.00 TMC-72'' Cabezal Muro-3.80m-CC
308 161+856.00 161+856.00 TMC-48'' Cajatoma Cabezal
309 162+029.00 162+029.00 TMC-36'' Cajatoma Muro-3.80m-CC
310 162+160.00 162+160.00 TMC-36'' Cajatoma Cabezal
311 162+543.00 162+543.00 TMC-48'' Cajatoma Cabezal
312 162+745.00 TMC-36'' Cajatoma Cabezal
313 162+880.00 TMC-36'' Cajatoma Cabezal
314 162+969.00 TMC-36'' Cajatoma Cabezal
315 163+503.00 163+490.00 TMC-72'' Cabezal Cabezal
316 163+678.00 163+678.00 TMC-48'' Cajatoma Cabezal
317 163+920.00 163+920.00 TMC-48'' Cajatoma Cabezal
318 163+965.00 163+965.00 TMC-36'' Cajatoma Muro-2.80m-CC
319 164+194.00 164+194.00 TMC-72'' Cabezal Cabezal
320 164+331.00 164+334.00 TMC-48'' Cajatoma Cabezal
321 164+350.00 TMC-36'' Cajatoma Cabezal
322 164+463.00 164+461.00 TMC-48'' Cajatoma Muro
323 164+600.00 164+600.00 TMC-36'' Cajatoma Cabezal
324 164+830.00 164+830.00 TMC-36'' Cabezal Cabezal
325 164+977.00 164+977.00 TMC-48'' Cajatoma Muro
326 165+183.00 165+180.00 TMC-72'' Cabezal Muro-3.80m-CC
327 165+385.00 165+385.00 TMC-36'' Cabezal Cabezal
328 165+606.00 165+604.00 TMC-72'' Cabezal Cabezal
329 165+684.00 165+683.50 TMC-72'' Cabezal Cabezal
330 165+940.00 165+952.40 TMC-72'' Cabezal Cabezal
331 166+055.00 166+051.50 TMC-72'' Cabezal Cabezal
332 166+175.00 166+175.00 TMC-72'' Cabezal Muro-4.00m-CA
333 166+307.00 166+307.00 TMC-72'' Cabezal Cabezal
334 166+675.00 166+671.89 TMC-72'' Cabezal Cabezal
335 166+820.00 166+818.00 TMC-72'' Cabezal Cabezal
336 166+915.00 TMC-60'' Cabezal Muro
337 167+030.00 TMC-60'' Cabezal Muro
338 167+167.00 167+167.00 TMC-72'' Cabezal Muro-3.80m-CA
339 167+491.00 167+491.00 TMC-48'' Cabezal Cabezal
340 167+795.00 167+795.00 TMC-48'' Cajatoma Cabezal
341 168+000.00 168+000.00 TMC-48'' Cajatoma Cabezal
342 168+500.00 168+500.00 TMC-48'' Cajatoma Cabezal
343 168+795.00 168+795.00 TMC-72'' Cabezal Cabezal
344 168+983.00 168+981.00 TMC-72'' Cabezal Cabezal
345 169+153.00 TMC-72'' Cabezal Muro
346 169+410.00 169+410.00 TMC-48'' Cajatoma Cabezal
347 169+620.00 169+620.00 TMC-48'' Cajatoma Cabezal
348 169+920.00 169+920.00 TMC-48'' Cajatoma Cabezal
349 170+800.00 170+800.00 TMC-48'' Cajatoma Cabezal
350 170+986.00 170+985.00 TMC-48'' Cajatoma Muro-2.80m-CC
351 171+240.00 171+234.00 TMC-48'' Cajatoma Cabezal
352 171+422.00 171+422.00 TMC-48'' Cajatoma Cabezal
353 171+751.00 171+749.00 TMC-48'' Cajatoma Cabezal
354 171+803.00 171+803.00 TMC-72'' Cabezal Muro-3.80m-CA
355 171+881.00 TMC-60'' Cajatoma Cabezal
356 171+948.00 TMC-72'' Cajatoma Cabezal
357 171+987.00 TMC-72'' Cajatoma Cabezal
358 172+039.00 TMC-72'' Cabezal Cabezal
359 172+124.00 172+124.50 TMC-72'' Cabezal Cabezal
360 172+193.00 172+193.00 TMC-72'' Cabezal Muro-3.80m-CA
361 172+589.00 172+582.00 TMC-48'' Cabezal Muro-3.80m-CA
362 172+680.00 172+680.00 TMC-36'' Cajatoma Cabezal
363 173+140.00 TMC-36'' Cajatoma Cabezal