Página: 1 de 1 Versión: (5.6.0) Obra: Contratante: P R E S U P U E S T O Part. No Descripción Und. Cantidad Precio Unitario Total BsF. 1 S/C 76,738.80 15,347.76 5.00 PZA S/C POSTE DE ACERO 11.28 MTS. EC.295 KG(INCLUYE LEVANTAMIENTO Y ALINEACION) 2 S/C 43,174.22 9,166.50 4.71 HM S/C TENSADO SOBRE AISLADORES DE 100 METROS DE CONDUCTOR ARVIDAL # 1/0 AWG .A.T 3 S/C 1,771,547.78 1,771,547.78 1.00 PZA S/C TRES TRANSF.MONOF.DE 25 KVA CON RELACION 13800/120-240 V 4 S/C 14,889.52 3,722.38 4.00 PZA S/C DE UNA PERCHA CINCO AISL.EN ALINEACION POSTE (4 1/2") 5 S/C 31,946.47 9,952.17 3.21 HM S/C TENSADO SOBRE AISLADORES DE 100 METROS DE CONDUCTOR ARVIDAL # 1/0 AWG .B.T 1,938,296.79 Total Hoja (Sin I.V.A.): 1,938,296.79 Total Acumulado (Sin I.V.A.): 232,595.61 Total I.V.A. (12.00%): 2,170,892.40 Total General BsF. :

Upload: jesus-reinier-jimenez-perez

Post on 15-Jan-2016

3 views

Category:

Documents


0 download

DESCRIPTION

PORNO

TRANSCRIPT

Page 1: Alex Presu

Página: 1 de 1 Versión: (5.6.0)

Obra:

Contratante:

P R E S U P U E S T O

Part. No Descripción Und. Cantidad Precio Unitario Total BsF.

1 S/C 76,738.80 15,347.76 5.00 PZA S/C POSTE DE ACERO 11.28 MTS. EC.295 KG(INCLUYE LEVANTAMIENTO Y

ALINEACION) 2 S/C

43,174.22 9,166.50 4.71 HM S/C TENSADO SOBRE AISLADORES DE 100 METROS DE CONDUCTOR ARVIDAL # 1/0 AWG .A.T

3 S/C 1,771,547.78 1,771,547.78 1.00 PZA S/C TRES TRANSF.MONOF.DE 25 KVA CON RELACION 13800/120-240 V

4 S/C 14,889.52 3,722.38 4.00 PZA S/C DE UNA PERCHA CINCO AISL.EN ALINEACION POSTE (4 1/2")

5 S/C 31,946.47 9,952.17 3.21 HM S/C TENSADO SOBRE AISLADORES DE 100 METROS DE CONDUCTOR

ARVIDAL # 1/0 AWG .B.T

1,938,296.79 Total Hoja (Sin I.V.A.):

1,938,296.79 Total Acumulado (Sin I.V.A.):

232,595.61 Total I.V.A. (12.00%):

2,170,892.40 Total General BsF. :