CAPITULO SUBCAPITULO ACTIVIDAD UNIDAD CODIGO ITEM UNIDAD CANTIDAD VALOR UNITARIO VALOR TOTAL CAMPAMENTO UN PLAST 01 TEJA TRASLUCIDA P 1000 PREMIUM UN 8 $35,380.00 $283,040.00 HERR 03 PORTA CANDADO GATO SIMPLE 3 UN 2 $1,850.00 $3,700.00 HERR 02 BISAGRA GATO OMEGA 3 UN 3 $1,783.00 $5,349.00 HERR 01 PUNTILLA CABEZA 2 LB 3 $2,552.00 $7,656.00 HERR 04 GANCHO TEJA ETERNIT 55 MM UN 16 $269.00 $4,304.00 HH 02 VARA DE CLAVO DIAM. 6 A 8 CM X 3.00 M UN 4.13 $4,950.00 $20,443.50 MAD 03 TABLA CHAPA 30 X 1.8 A 2.0 CM X 2.9 UN 10.34 $13,428.00 $138,845.52 AR 02 BASE GRANULAR M3 1.17 $33,640.00 $39,358.80 MO 01 MANO DE OBRA AA Hc 15.18 $17,486.00 $265,437.48 TOTAL $768,134.30 DESCAPOTE M2 MAQUI 02 VOLQUETA M3 Vj 0.37 $55,000.00 $20,350.00 MO 03 MANO DE OBRA AA ALBAÑILERIA Hc 0.26 $16,351.00 $4,251.26 MO 03 MANO DE OBRA AYUDANTE ALBAÑILERIA Hh 0.16 $6,310.00 $1,009.60 TOTAL $25,610.86 REPLANTEO M2 HERR 05 PUNTILLA CABEZA 1 LB 0.02 $2,645.00 $52.90 HERR 01 PUNTILLA CABEZA 2 LB 0.02 $2,552.00 $51.04 MAD 02 DURMIENTE ORDINARIA UN 0.34 $3,550.00 $1,207.00 MO 01 MANO DE OBRA AA Hc 0.28 $17,486.00 $4,896.08 TOTAL $6,207.02 EXCAVACION MECÁNICA M3 EQUIP 02 CARGADOR AE 60 OPERARIO + COMBUSTIBLE D 0.02 $403,700.00 $8,074.00 MAQUI 02 VOLQUETA M3 Vj 0.37 $55,000.00 $20,350.00 TOTAL $28,424.00 EXCAVACIÓN MANUAL DE CIMIENTOS M3 MAQUI 02 VOLQUETA M3 Vj 0.37 $55,000.00 $20,350.00 MO 01 MANO DE OBRA AA Hc 0.93 $17,486.00 $16,261.98 TOTAL $36,611.98 MUROS DE CONTENCION ALTURA 2M M3 AR 01 CONCRETO 3000 PSI M3 1.03 $340,390.00 $350,601.70 HERR 01 PUNTILLA CABEZA 2 LB 2.12 $33,640.00 $71,316.80 EQUIP 01 VIBRADOR CONCRETO GASOLINA D 0.04 $7,000.00 $280.00 MAD 04 TABLA BURRA 30 X 2.7CM X 2.90MORD UN 1.5 $4,950.00 $7,425.00 MAD 05 REPISA 8 X 4 CM X 2.90 MORDINARIO UN 0.67 $4,703.00 $3,151.01 HH 03 VARA DE CLAVO 8 CM X 3.00 M EUCALIPTO UN 0.95 $27,840.00 $26,448.00 MO 01 MANO DE OBRA AA Hc 10.68 $2,552.00 $27,255.36 TOTAL $486,477.87 PILOTES PREEXCAVADOS M3 MAQUI 02 VOLQUETA M3 Vj 0.37 $55,000.00 $20,350.00 HH 12 ACERO FIGURADO 60000 PSI 3/8" KG 80 $2,050.00 $164,000.00 AR 01 CONCRETO 3000 PSI M3 1 $340,390.00 $340,390.00 TOTAL $524,740.00 DEMOLICION CABEZAS PILOTES M3 EQUIP 03 COMPRESOR DE AIRE PEQUEÑO H 6.95 $31,320.00 $217,674.00 MAQUI 03 RETROEXCAVADORA ORUGA CAT320 + OPERAD H 0.04 $14,951.11 $598.04 MAQUI 02 VOLQUETA M3 Vj 0.45 $55,000.00 $24,750.00 MO 01 MANO DE OBRA AA Hc 8.91 $17,486.00 $155,800.26 TOTAL $398,822.30 PLACA FLOTANTE 0.9 MTS M2 AR 01 CONCRETO 3000 PSI M3 0.46 $340,390.00 $156,579.40 EQUIP 04 COSTO ADICIONAL DE BOMBEO M2 0.46 $35,000.00 $16,100.00 EQUIP 01 VIBRADOR CONCRETO GASOLINA D 0.04 $27,840.00 $1,113.60 MO 03 MANO DE OBRA AA ALBAÑILERIA Hc 1.83 $16,351.00 $29,922.33 POLIEST 01 ICOPOR 1 X 1 ESPESOR 1 CM M 0.8 $2,900.00 $2,320.00 HERR 01 PUNTILLA CABEZA 2 LB 0.03 $2,552.00 $76.56 MAD 03 TABLA CHAPA 30 X 1.8 A 2.0 CM X 2.9 UN 0.04 $13,428.00 $537.12 TOTAL $206,649.01 VIGA DE CIMENTACION M3 AR 01 CONCRETO 3000 PSI M3 1.03 $340,390.00 $350,601.70 HH 01 ACERO REFUERZO #4 KG 25 $7,000.00 $175,000.00 EQUIP 01 VIBRADOR CONCRETO GASOLINA D 0.04 $27,840.00 $1,113.60 HERR 01 PUNTILLA CABEZA 2 LB 2.2 $2,552.00 $5,614.40 MAD 01 PLANCHON ORDINARIO UN 1.23 $17,750.00 $21,832.50 MAD 02 DURMIENTE ORDINARIA UN 1 $3,550.00 $3,550.00 MO 01 MANO DE OBRA AA Hc 12 $17,486.00 $209,832.00 TOTAL $767,544.20 COLUMNAS M3 AR 01 CONCRETO 3000 PSI M3 1.1 $340,390.00 $374,429.00 HERR 01 PUNTILLA CABEZA 2 LB 8 $2,552.00 $20,416.00 MAD 05 REPISA 8 X 4 CM X 2.90 MORDINARIO UN 2.5 $7,100.00 $17,750.00 MAD 04 TABLA BURRA 30 X 2.7CM X 2.90MORD UN 0.91 $14,700.00 $13,377.00 EQUIP 01 VIBRADOR CONCRETO GASOLINA D 0.04 $27,840.00 $1,113.60 ESTRUC 01 ANDAMIO TUBULAR 1.50 X 1.50 ALQUILER MS 0.2 $20,880.00 $4,176.00 ESTRUC 02 PARAL METÁLICO HASTA 3.30 M MS 1 $3,828.00 $3,828.00 MO 01 MANO DE OBRA AA Hc 10.29 $17,486.00 $179,930.94 TOTAL $615,020.54 ENTREPISOS CASETON CON VIGAS M2

Upload: maria-jose-aristizabal

Post on 21-Jul-2015

158 views

Category:

Data & Analytics


2 download

TRANSCRIPT

Page 1: 3. APUs

CAPITULO SUBCAPITULO ACTIVIDAD UNIDAD CODIGO ITEM UNIDAD CANTIDAD VALOR  UNITARIO VALOR  TOTALCAMPAMENTO UN

PLAST  01 TEJA  TRASLUCIDA  P  1000  PREMIUM UN 8 $35,380.00 $283,040.00HERR  03 PORTA  CANDADO  GATO  SIMPLE  3 UN 2 $1,850.00 $3,700.00HERR  02 BISAGRA  GATO  OMEGA  3 UN 3 $1,783.00 $5,349.00HERR  01 PUNTILLA  CABEZA  2 LB 3 $2,552.00 $7,656.00HERR  04 GANCHO  TEJA  ETERNIT  55  MM UN 16 $269.00 $4,304.00HH  02 VARA  DE  CLAVO  DIAM.  6  A  8  CM  X  3.00  M UN 4.13 $4,950.00 $20,443.50MAD  03 TABLA  CHAPA  30  X  1.8  A  2.0  CM  X  2.9 UN 10.34 $13,428.00 $138,845.52AR  02 BASE  GRANULAR M3 1.17 $33,640.00 $39,358.80MO  01 MANO  DE  OBRA  AA Hc 15.18 $17,486.00 $265,437.48

TOTAL $768,134.30

DESCAPOTE M2MAQUI  02 VOLQUETA  M3 Vj 0.37 $55,000.00 $20,350.00MO  03 MANO  DE  OBRA  AA  -­‐  ALBAÑILERIA Hc 0.26 $16,351.00 $4,251.26MO  03 MANO  DE  OBRA  AYUDANTE  ALBAÑILERIA Hh 0.16 $6,310.00 $1,009.60

TOTAL $25,610.86

REPLANTEO M2HERR  05 PUNTILLA  CABEZA  1 LB 0.02 $2,645.00 $52.90HERR  01 PUNTILLA  CABEZA  2 LB 0.02 $2,552.00 $51.04MAD  02 DURMIENTE  ORDINARIA UN 0.34 $3,550.00 $1,207.00MO  01 MANO  DE  OBRA  AA Hc 0.28 $17,486.00 $4,896.08

TOTAL $6,207.02

EXCAVACION  MECÁNICA M3EQUIP  02 CARGADOR  AE  60  OPERARIO  +  COMBUSTIBLE D 0.02 $403,700.00 $8,074.00MAQUI  02 VOLQUETA  M3 Vj 0.37 $55,000.00 $20,350.00

TOTAL $28,424.00

EXCAVACIÓN  MANUAL  DE  CIMIENTOS M3MAQUI  02 VOLQUETA  M3 Vj 0.37 $55,000.00 $20,350.00MO  01 MANO  DE  OBRA  AA Hc 0.93 $17,486.00 $16,261.98

TOTAL $36,611.98

MUROS  DE  CONTENCION  ALTURA  2M   M3AR  01 CONCRETO  3000  PSI M3 1.03 $340,390.00 $350,601.70HERR  01 PUNTILLA  CABEZA  2 LB 2.12 $33,640.00 $71,316.80EQUIP  01 VIBRADOR  CONCRETO  GASOLINA D 0.04 $7,000.00 $280.00MAD  04 TABLA  BURRA  30  X  2.7CM  X  2.90M-­‐ORD UN 1.5 $4,950.00 $7,425.00MAD  05 REPISA  8  X  4  CM  X  2.90  M-­‐ORDINARIO UN 0.67 $4,703.00 $3,151.01HH  03 VARA  DE  CLAVO  8  CM  X  3.00  M  EUCALIPTO UN 0.95 $27,840.00 $26,448.00MO  01 MANO  DE  OBRA  AA Hc 10.68 $2,552.00 $27,255.36

TOTAL $486,477.87

PILOTES  PRE-­‐EXCAVADOS M3MAQUI  02 VOLQUETA  M3 Vj 0.37 $55,000.00 $20,350.00HH  12 ACERO  FIGURADO  60000  PSI  3/8" KG 80 $2,050.00 $164,000.00AR  01 CONCRETO  3000  PSI M3 1 $340,390.00 $340,390.00

TOTAL $524,740.00

DEMOLICION  CABEZAS  PILOTES M3EQUIP  03 COMPRESOR  DE  AIRE  PEQUEÑO   H 6.95 $31,320.00 $217,674.00MAQUI  03 RETROEXCAVADORA  ORUGA  CAT320  +  OPERADORH 0.04 $14,951.11 $598.04MAQUI  02 VOLQUETA  M3 Vj 0.45 $55,000.00 $24,750.00MO  01 MANO  DE  OBRA  AA Hc 8.91 $17,486.00 $155,800.26

TOTAL $398,822.30

PLACA  FLOTANTE  0.9  MTS   M2AR  01 CONCRETO  3000  PSI M3 0.46 $340,390.00 $156,579.40EQUIP  04 COSTO  ADICIONAL  DE  BOMBEO M2 0.46 $35,000.00 $16,100.00EQUIP  01 VIBRADOR  CONCRETO  GASOLINA D 0.04 $27,840.00 $1,113.60MO  03 MANO  DE  OBRA  AA  -­‐  ALBAÑILERIA Hc 1.83 $16,351.00 $29,922.33POLIEST  01 ICOPOR  1  X  1  ESPESOR  1  CM M 0.8 $2,900.00 $2,320.00HERR  01 PUNTILLA  CABEZA  2 LB 0.03 $2,552.00 $76.56MAD  03 TABLA  CHAPA  30  X  1.8  A  2.0  CM  X  2.9 UN 0.04 $13,428.00 $537.12

TOTAL $206,649.01

VIGA  DE  CIMENTACION M3AR  01 CONCRETO  3000  PSI M3 1.03 $340,390.00 $350,601.70HH  01 ACERO  REFUERZO  #4 KG 25 $7,000.00 $175,000.00EQUIP  01 VIBRADOR  CONCRETO  GASOLINA D 0.04 $27,840.00 $1,113.60HERR  01 PUNTILLA  CABEZA  2 LB 2.2 $2,552.00 $5,614.40MAD  01 PLANCHON  ORDINARIO UN 1.23 $17,750.00 $21,832.50MAD  02 DURMIENTE  ORDINARIA UN 1 $3,550.00 $3,550.00MO  01 MANO  DE  OBRA  AA Hc 12 $17,486.00 $209,832.00

TOTAL $767,544.20

COLUMNAS M3AR  01 CONCRETO  3000  PSI M3 1.1 $340,390.00 $374,429.00HERR  01 PUNTILLA  CABEZA  2 LB 8 $2,552.00 $20,416.00MAD  05 REPISA  8  X  4  CM  X  2.90  M-­‐ORDINARIO UN 2.5 $7,100.00 $17,750.00MAD  04 TABLA  BURRA  30  X  2.7CM  X  2.90M-­‐ORD UN 0.91 $14,700.00 $13,377.00EQUIP  01 VIBRADOR  CONCRETO  GASOLINA D 0.04 $27,840.00 $1,113.60ESTRUC  01 ANDAMIO  TUBULAR  1.50  X  1.50  ALQUILER MS 0.2 $20,880.00 $4,176.00ESTRUC  02 PARAL  METÁLICO  HASTA  3.30  M MS 1 $3,828.00 $3,828.00MO  01 MANO  DE  OBRA  AA Hc 10.29 $17,486.00 $179,930.94

TOTAL $615,020.54

ENTREPISOS  CASETON  CON  VIGAS M2

Page 2: 3. APUs

HH  04 ACERO  FIGURADO  60000  PSI  1/4" KG 4.5 $1,833.11 $8,249.00HH  05 ALAMBRE  NEGRO  NO.  18  (RECOCIDO) KG 0.14 $2,671.43 $374.00AR  01 CONCRETO  3000  PSI M3 0.17 $340,390.00 $57,866.30MAD  06 ESTERILLA  GUADUA  ANCHO  30  CM  X  4.00  M UN 1.43 $6,950.35 $9,939.00FORM  01 FORMALETA  ENTREPISOS MS 0.88 $6,062.50 $5,335.00MAD  07 LISTON  10  X  1.8  CM  X  2.90  M  AMARILLO UN 1.33 $9,191.72 $12,224.99HERR  01 PUNTILLA  CABEZA  2 LB 0.02 $2,552.00 $51.04MAD  05 REPISA  8  X  4  CM  X  2.90  M-­‐ORDINARIO UN 0.02 $7,100.00 $142.00MAD  04 TABLA  BURRA  30  X  2.7CM  X  2.90M-­‐ORD UN 0.02 $14,700.00 $294.00EQUIP  01 VIBRADOR  CONCRETO  GASOLINA D 0.01 $27,840.00 $278.40MO  01 MANO  DE  OBRA  AA Hc 2.01 $17,486.00 $35,146.86

TOTAL $129,900.58

ENTREPISOS  LÁMINA  COLABORANTE  2" M2AR  01 CONCRETO  3000  PSI M3 0.08 $340,390.00 $27,231.20HH  06 MALLA  ELECTROSOLDADA  Q  3.1 UN 0.02 $71,400.00 $1,428.00HH  07 METAL  DECK  2"  9.40  M  CAL  22  (0.75  MM) M2 1 $27,870.00 $27,870.00MAD  04 TABLA  BURRA  30  X  2.7CM  X  2.90M-­‐ORD UN 0.02 $14,700.00 $294.00MO  01 MANO  DE  OBRA  AA Hc 0.67 $17,486.00 $11,715.62

TOTAL $68,538.82

ENTREPISOS  LÁMINA  COLABORANTE  3" M2AR  01 CONCRETO  3000  PSI M3 0.08 $340,390.00 $27,231.20HH  06 MALLA  ELECTROSOLDADA  Q  3.1 UN 0.02 $71,400.00 $1,428.00HH  08 METAL  DECK  3"  0.87  M  CAL.22  (0.75  MM) M2 0.67 $27,870.00 $18,672.90MAD  04 TABLA  BURRA  30  X  2.7CM  X  2.90M-­‐ORD UN 0.02 $14,700.00 $294.00MO  01 MANO  DE  OBRA  AA Hc 0.67 $17,486.00 $11,715.62

TOTAL $59,341.72

MURO  EN  LADRILLO  MACIZO  COMÚN  10CM M2AR  03 LADRILLO  MACIZO  24X12X6 M2 70 $719.00 $50,330.00AR  04 MORTERO  1:4 M2 0.06 $286,434.90 $17,186.09MO  03 MANO  DE  OBRA  AA  -­‐  ALBAÑILERIA Hc 0.75 $16,351.00 $12,263.25

TOTAL $79,779.34

MURO  EN  LADRILLO  PRETENSADO  LIVIANO M2AR  05 LADRILLO  P-­‐V  PRENSADO  LIVIANO  6  CM UN 56 $577.00 $32,312.00MO  03 MANO  DE  OBRA  AA  -­‐  ALBAÑILERIA Hc 1.25 $16,351.00 $20,438.75ESTRUC  01 ANDAMIO  TUBULAR  1.50  X  1.50  ALQUILER MS 0.16 $20,880.00 $3,340.80MAD  13 TABLA  BURRA  15  X  2.2  A  2.7  X  2.9 UN 0.04 $6,902.00 $276.08AR  06 MORTERO  1:3 M3 0.03 $344,480.00 $10,334.40HH  12 ACERO  FIGURADO  60000  PSI  3/8" KG 80 $2,050.00 $0.00

TOTAL $66,702.03

ESCALERA   M3MO  03 MANO  DE  OBRA  AA  -­‐  ALBAÑILERIA Hc 17.7 $16,351.0 $289,412.7MAD  14 PARAL  TELESCOPICO   D 2.9 $150.0 $435.0AR  01 CONCRETO  3000  PSI M3 1.1 $340,390.0 $374,429.0FORM  01 FORMALETA  ENTREPISOS MS 8.69 $6,062.5 $52,683.1EQUIP  01 VIBRADOR  CONCRETO  GASOLINA D 0.04 $27,840.0 $1,113.6HERR  01 PUNTILLA  CABEZA  2 LB 1.49 $2,552.0 $3,802.5MAD  15 PARAL  TELESCOPICO  2 D 2.9 $309.0 $896.1MAD  05 REPISA  8  X  4  CM  X  2.90  M-­‐ORDINARIO UN 0.95 $7,100.0 $6,745.0MAD  16 TABLA  BURRA  30  X  2.2  A  2.7  X  2.9 UN 3.14 $17,284.0 $54,271.8MAD  17 TABLA  BURRA  25  X  2.2  A  2.7  X  2.9 UN 3.74 $14,345.7 $53,653.0

TOTAL $837,441.8

ACABADO  VENTANAS UNVENT  01 VENTANA  FIJA  1  X  1  VIDRIO  4  MM UN 1 $120,000 $120,000

TOTAL $120,000.00

PUERTA  OFICINA UNMO  05 MANO  DE  OBRA  DD  -­‐  CARPINTERIA Hc 0.7 $19,621.00 $13,734.70PUERTA  01 PUERTA  FORTE  PROVIDENZA  0.91 UN 1.1 $140,737.00 $154,810.70

TOTAL $168,545.40

PUERTA  BAÑOS UNMO  05 MANO  DE  OBRA  DD  -­‐  CARPINTERIA Hc 0.7 $19,621.00 $13,734.70PUERTA  02 PUERTA  FORTE  PROVIDENZA  0.81 UN 1 $126,562.00 $126,562.00

TOTAL $140,296.70

ACABADO  PISOS M2MO  06 MANO  DE  OBRA  -­‐  PULIDA  /  LACADA M2 1 $40,600.00 $40,600.00LACAS  01 BARNIZ  VIRTIFLEX  A  BASE  DE  AGUA GAL 0.1 $193,900.00 $19,390.00

TOTAL $59,990.00

ACABADO  PAREDES M2PINTU  01 ESTUCO  Y  VINILOS  3  MANOS M2 1 $13,597.68 $13,597.68AR  07 PAÑETE  LISO  MUROS  1:4 M2 1 $3,266.08 $3,266.08

TOTAL $16,863.76

CUBIERTA  SANDWICH M2HERR  08 CLIP  TIPO  C  SENCILLO   UN 2.22 $2,522.00 $5,598.84HERR  09 TORNILLO  AUTOPERFORANTE  7/8 UN 2.22 $133.00 $295.26MO  03 MANO  DE  OBRA  AA  -­‐  ALBAÑILERIA Hc 0.37 $16,351.00 $6,049.87POLIUR  02 ECO  POLIURETANO M2 1 $45,000.00 $45,000.00HH  13 LAMINA  COLD  ROLLED   UN 0.2 $54,288.00 $10,857.60

TOTAL $67,801.57

COLUMNA  EN  MADERA MESTRUC  01 ANDAMIO  TUBULAR  1.50  X  1.50  ALQUILER MS 0.01 $20,880.00 $208.80

Page 3: 3. APUs

HERR  06 PERNO  GRADO  6 UN 6 $350.00 $2,100.00HH  09 ANCLAJE  EPOXICO  INCLUYE  ACERO UN 1 $1,200.00 $1,200.00HH  10 PLATINA  I  0.9  X  0.3  X  0.4 UN 1 $41,700.00 $41,700.00MAD  08 COLUMNA  MADERA  0.08  X  0.18  X  5.9 UN 0.33 $219,240.00 $72,349.20MO  04 MANO  DE  OBRA  BB  -­‐  INSTALACIONES D 0.3 $72,277.00 $21,683.10

TOTAL $139,241.10

VIGA  EN  MADERA MESTRUC  01 ANDAMIO  TUBULAR  1.50  X  1.50  ALQUILER MS 0.01 $20,880.00 $208.80HH  11 PLATINA  I  0.9  X  0.10  x  1/4 UN 1 $34,000.00 $34,000.00HERR  06 PERNO  GRADO  6 UN 6 $350.00 $2,100.00HH  09 ANCLAJE  EPOXICO  INCLUYE  ACERO UN 1 $1,200.00 $1,200.00MO  04 MANO  DE  OBRA  BB  -­‐  INSTALACIONES D 0.25 $72,277.00 $18,069.25MAD  09 VIGA  18CM  X  8CM  X  2.90  M UN 0.35 $113,100.00 $39,585.00

TOTAL $95,163.05

VIGUETA  EN  MADERA MESTRUC  01 ANDAMIO  TUBULAR  1.50  X  1.50  ALQUILER MS 0.01 $20,880.00 $208.80HH  11 PLATINA  I  0.9  X  0.10  x  1/4 UN 1 $34,000.00 $34,000.00HERR  06 PERNO  GRADO  6 UN 4 $350.00 $1,400.00MO  04 MANO  DE  OBRA  BB  -­‐  INSTALACIONES D 0.2 $72,277.00 $14,455.40MAD  12 VIGA  0.1  X  0.05  X  2.9  M UN 0.35 $49,300.00 $17,255.00

TOTAL $67,319.20

CERRAMIENTO  MADERA M2ESTRUC  01 ANDAMIO  TUBULAR  1.50  X  1.50  ALQUILER MS 0.05 $20,880.00 $1,044.00MO  04 MANO  DE  OBRA  BB  -­‐  INSTALACIONES D 0.2 $72,277.00 $14,455.40HERR  07 PUNTILLA  CABEZA  2  1/2 UN 0.1 $2,400.00 $240.00POLIUR  01 FRESCASA  SIN  PAPEL  600  X  48  X  2-­‐1/2 UN 0.05 $148,778.00 $7,438.90MAD  10 ENTRAMADO  MADERA  PINO  0.05  X  0.10  M M2 2 $10,600.00 $21,200.00MAD  11 LISTON  DE  PINO  PARA  MACHIMBRE M2 2 $13,220.00 $26,440.00

TOTAL $70,818.30

DUCTOS   MHERR  10 ANCLAJE  AUTOPERFORANTE  1/2 UN   4 $6,000.00 $24,000.00DUC  01 DUCTOS  METALICO   UN   1.2 $33,640.00 $40,368.00ESTRUC  04 SOPORTE  PARA  BANDEJA  PORTA  CABLES UN 0.6 $20,450.00 $12,270.00EQUIP  05 TALADRO  3/4  PERCUTOR D 0.07 $17,000.00 $1,190.00MO  07 CUADRILLA  INSTALACIONES  INTERNAS Hc 0.56 $17,986.00 $10,072.16

TOTAL $87,900.16