1.- EXCAVACION DE ZANJAS
RENDIMIENTO 2.50 m3
CAPATAZ = 0.10
OPERARIO = 0.00
OFICIAL = 0.00
PEON = 1.00
CAPATAZ = 0.10 x 8.00 = 0.3200 hh
OPERARIO = 0.00 x 8.00 = 0.0000 hh
OFICIAL = 0.00 x 8.00 = 0.0000 hh
PEON = 1.00 x 8.00 = 3.2000 hh
2.- SOLADO DE CONCRETO
RENDIMIENTO 80.00 m2
CAPATAZ = 0.10
OPERARIO = 1.00
OFICIAL = 1.00
PEON = 4.00
CAPATAZ = 0.10 x 8.00 = 0.0100 hh
OPERARIO = 1.00 x 8.00 = 0.1000 hh
OFICIAL = 1.00 x 8.00 = 0.1000 hh
PEON = 4.00 x 8.00 = 0.4000 hh
3.- ACERO EN COLUMNAS
RENDIMIENTO 300.00 KG
CAPATAZ = 0.10
OPERARIO = 1.00
OFICIAL = 1.00
PEON = 0.00
80.00
2.50
2.50
2.50
2.50
80.00
80.00
80.00
-
5/24/2018 2 Da Parcial de Costos
2/15
CAPATAZ = 0.10 x 8.00 = 0.0030 hh
OPERARIO = 1.00 x 8.00 = 0.0270 hh
OFICIAL = 1.00 x 8.00 = 0.0270 hh
PEON = 0.00 x 8.00 = 0.0000 hh
4.- CONCRETO EN ZAPATAS
RENDIMIENTO 25.00 m3
CAPATAZ = 0.20
OPERARIO = 2.00
OFICIAL = 2.00PEON = 4.00
CAPATAZ = 0.20 x 8.00 = 0.0640 hh
OPERARIO = 2.00 x 8.00 = 0.6400 hh
OFICIAL = 2.00 x 8.00 = 0.6400 hh
PEON = 4.00 x 8.00 = 1.2800 hh
5.- ENCOFRADO EN COLUMNAS
RENDIMIENTO 18.00 m2
CAPATAZ = 0.10
OPERARIO = 1.00
OFICIAL = 1.00
PEON = 2.00
CAPATAZ = 0.10 x 8.00 = 0.0440 hh
OPERARIO = 1.00 x 8.00 = 0.4440 hh
OFICIAL = 1.00 x 8.00 = 0.4440 hh
18.00
18.00
25.00
25.00
25.00
25.00
300.00
300.00
300.00
300.00
-
5/24/2018 2 Da Parcial de Costos
3/15
PEON = 2.00 x 8.00 = 0.8890 hh
6.- CONCRETO EN COLUMNAS
RENDIMIENTO 5.00 m3
CAPATAZ = 0.20
OPERARIO = 2.00
OFICIAL = 2.00
PEON = 6.00
CAPATAZ = 0.20 x 8.00 = 0.3200 hh
OPERARIO = 2.00 x 8.00 = 3.2000 hh
OFICIAL = 2.00 x 8.00 = 3.2000 hh
PEON = 6.00 x 8.00 = 9.6000 hh
18.00
18.00
5.00
5.00
5.00
5.00
-
5/24/2018 2 Da Parcial de Costos
4/15
CAPATAZ = 0.3200
OPERARIO = 0.0000
OFICIAL = 0.0000
PEON = 3.2000
CAPATAZ = 0.0100
OPERARIO = 0.1000
OFICIAL = 0.1000
PEON = 0.4000
-
5/24/2018 2 Da Parcial de Costos
5/15
CAPATAZ = 0.0030
OPERARIO = 0.0270
OFICIAL = 0.0270
PEON = 0.0000
CAPATAZ = 0.0640
OPERARIO = 0.6400
OFICIAL = 0.6400
PEON = 1.2800
CAPATAZ = 0.0440
OPERARIO = 0.4440
OFICIAL = 0.4440
PEON = 0.8890
-
5/24/2018 2 Da Parcial de Costos
6/15
CAPATAZ = 0.3200
OPERARIO = 3.2000
OFICIAL = 3.2000
PEON = 9.6000
-
5/24/2018 2 Da Parcial de Costos
7/15
OBRA : EXAMEN 2013 - II
PARTIDA: 1.- EXCAVACION DE ZANJAS
UNIDAD : m3 RENDIMIENTO : COSTO UNITARIO : S/. 48.78
1.- MATERIALES
UND. CANT. P. UNIT PARCIAL TOTAL
0.00
2.- MANO DE OBRA
No H-H J-H PARCIAL TOTAL
HH 0.320 18.00 5.76
HH 0.000 16.00 0.00
HH 0.000 15.00 0.00
HH 3.200 13.00 41.60
47.36
3.- EQUIPO
No H-M A-H PARCIAL TOTAL
1.42
0.00
0.00
1.42
.(1) S/. 0.00
.(2) S/. 47.36
.(3) S/. 1.42
S/. 48.78
OBRA : EXAMEN 2013 - II
PARTIDA: 2.- SOLADO DE CONCRETO
UNIDAD : m2 RENDIMIENTO : COSTO UNITARIO : S/. 23.75
1.- MATERIALES
UND. CANT. P. UNIT PARCIAL TOTALbolsas 0.28 22.00 6.16
m2 0.10 50.00 5.00
11.16
2.- MANO DE OBRA
No H-H J-H PARCIAL TOTAL
HH 0.010 18.00 0.18
DESCRIPCION
CAPATAZ
DESCRIPCION
CAPATAZ
OPERARIO
OFICIAL
PEON
ANALISIS DE COSTOS UNITARIOS N 1
DESCRIPCION
DESCRIPCION
HERRAMIENTAS 3% M.O.
DESCRIPCIONCEMENTO
HORMIGON
TOTAL MATERIAL
TOTAL MANO DE OBRA
TOTAL EQUIPO
COSTO UNITARIO
ANALISIS DE COSTOS UNITARIOS N 2
-
5/24/2018 2 Da Parcial de Costos
8/15
HH 0.100 16.00 1.60
HH 0.100 15.00 1.50
HH 0.400 13.00 5.20
8.48
3.- EQUIPO
No H-M A-H PARCIAL TOTAL
0.251.00 0.10 35.00 3.50
0.12 3.00 0.36
4.11
.(1) S/. 11.16
.(2) S/. 8.48
.(3) S/. 4.11
S/. 23.75
OBRA : EXAMEN 2013 - II
PARTIDA: 3.- ACERO EN COLUMNAS
UNIDAD : KG RENDIMIENTO : COSTO UNITARIO : S/. 7.97
1.- MATERIALES
UND. CANT. P. UNIT PARCIAL TOTAL
BLS 1.07 6.00 6.42
m3 0.06 7.00 0.42
6.84
2.- MANO DE OBRA
No H-H J-H PARCIAL TOTAL
HH 0.003 18.00 0.05
HH 0.027 16.00 0.43
HH 0.027 15.00 0.41
HH 0.000 13.00 0.00
0.89
3.- EQUIPO
No H-M A-H PARCIAL TOTAL0.03
Hm 0.05 4.00 0.21
0.24
.(1) S/. 6.84
.(2) S/. 0.89
TOTAL MATERIAL
TOTAL MANO DE OBRA
CIZALLA
DESCRIPCIONHERRAMIENTAS 3% M.O.
DESCRIPCION
CAPATAZ
OPERARIO
OFICIAL
PEON
DESCRIPCION
ACERO
ALAMBRE
TOTAL MATERIAL
TOTAL MANO DE OBRA
TOTAL EQUIPO
COSTO UNITARIO
ANALISIS DE COSTOS UNITARIOS N 3
MEZCLADORA
REGLAS DE MADERA
OPERARIO
OFICIAL
PEON
DESCRIPCION
HERRAMIENTAS 3% M.O.
-
5/24/2018 2 Da Parcial de Costos
9/15
.(3) S/. 0.24
S/. 7.97
OBRA : EXAMEN 2013 - II
PARTIDA: 4.- CONCRETO EN ZAPATASUNIDAD : m3 RENDIMIENTO : COSTO UNITARIO : S/. 284.25
1.- MATERIALES
UND. CANT. P. UNIT PARCIAL TOTAL
kg 8.00 22.00 176.00
kg 0.57 45.00 25.65
0.58 48.00 27.84
229.49
2.- MANO DE OBRA
No H-H J-H PARCIAL TOTAL
HH 0.064 18.00 1.15
HH 0.640 16.00 10.24
HH 0.640 15.00 9.60
HH 1.280 13.00 16.64
37.63
3.- EQUIPO
No H-M A-H PARCIAL TOTAL
1.13
Hm 0.32 35.00 11.20
0.32 15.00 4.80
17.13
.(1) S/. 229.49
.(2) S/. 37.63
.(3) S/. 17.13
S/. 284.25
OBRA : EXAMEN 2013 - II
PARTIDA: 5.- ENCOFRADO EN COLUMNASUNIDAD : m2 RENDIMIENTO : COSTO UNITARIO : S/. 69.74
1.- MATERIALES
UND. CANT. P. UNIT PARCIAL TOTAL
kg 5.00 8.00 40.00
kg 0.15 7.00 1.05
0.30 6.00 1.80
42.85
TOTAL MATERIAL
TOTAL MANO DE OBRA
TOTAL EQUIPO
COSTO UNITARIO
DESCRIPCION
HERRAMIENTAS 3% M.O.
MEZCLADORA
VIBRADOR
DESCRIPCION
CAPATAZ
OPERARIO
OFICIAL
PEON
ANALISIS DE COSTOS UNITARIOS N 4
DESCRIPCION
CEMENTO
ARENA
PIEDRA
TOTAL EQUIPO
COSTO UNITARIO
ANALISIS DE COSTOS UNITARIOS N 5
DESCRIPCION
MADERA
CLAVOS
ALAMBRE
-
5/24/2018 2 Da Parcial de Costos
10/15
2.- MANO DE OBRA
No H-H J-H PARCIAL TOTAL
HH 0.044 18.00 0.79
HH 0.444 16.00 7.10
HH 0.444 15.00 6.66
HH 0.889 13.00 11.56
26.11
3.- EQUIPO
No H-M A-H PARCIAL TOTAL
0.78
0.78
.(1) S/. 42.85
.(2) S/. 26.11
.(3) S/. 0.78
S/. 69.74
OBRA : EXAMEN 2013 - II
PARTIDA: 6.- CONCRETO EN COLUMNAS
UNIDAD : m RENDIMIENTO : COSTO UNITARIO : S/. 467.71
1.- MATERIALES
UND. CANT. P. UNIT PARCIAL TOTAL
BOLS 8.00 22.00 176.00
m3 0.58 45.00 26.10
m3 0.60 48.00 28.80
230.90
2.- MANO DE OBRA
No H-H J-H PARCIAL TOTAL
HH 0.320 18.00 5.76
HH 3.200 16.00 51.20
HH 3.200 15.00 48.00
HH 9.600 13.00 124.80
229.76
3.- EQUIPO
No H-M A-H PARCIAL TOTAL
6.89
Hm 0.08 2.00 0.16
7.05
.(1) S/. 230.90
.(2) S/. 229.76
DESCRIPCION
CAPATAZ
OPERARIO
OFICIAL
PEON
DESCRIPCION
HERRAMIENTAS 3% M.O.
TOTAL MATERIAL
TOTAL MANO DE OBRA
TOTAL EQUIPO
COSTO UNITARIO
ANALISIS DE COSTOS UNITARIOS N 6
DESCRIPCION
CEMENTO
ARENA
PIEDRA
DESCRIPCION
CAPATAZ
OPERARIO
OFICIAL
PEON
DESCRIPCION
HERRAMIENTAS 3% M.O.
MEZCLADORA
VIBRADOR
TOTAL MATERIAL
TOTAL MANO DE OBRA
-
5/24/2018 2 Da Parcial de Costos
11/15
.(3) S/. 7.05
S/. 467.71
TOTAL EQUIPO
COSTO UNITARIO
-
5/24/2018 2 Da Parcial de Costos
12/15
FORMULA POLINOMICA
1.000 x 48.000 2.000 x 3.600 3.000 x 525.000
1.00 MANO DE OBRA
J .---------> 47.360 x 48.000 + 8.480 x 3.600 + 0.890 x 525.000
8627.265
25539.265
2.00 CEMENTO
Ce .---------> 0.000 x 48.000 + 6.160 x 3.600 + 0.000 x 525.000
3533.376
25539.265
3.00 HORMIGON, ARENA Y PIEDRA
Ar .---------> 0.000 x 48.000 + 5.000 x 3.600 + 0.000 x 525.000
1098.450
25539.265
4.00 ACERO, ALAMBRE, CLAVOS, PERNOS
Ac .---------> 0.000 x 48.000 + 0.000 x 3.600 + 6.840 x 525.000
3950.100
25539.265
5.00 MADERA, TRIPLAY, PROTECTOR ENCOFRADO
Md .---------> 0.000 x 48.000 + 0.000 x 3.600 + 0.000 x 525.000
5040.000
25539.265
6.00 HERRAMIENTAS
Hrr .---------> 1.420 x 48.000 + 4.110 x 3.600 + 0.240 x 525.000
553.724
25539.265
7.00 GASTOS GENERALES Y UTILIDAD
2736.350
25539.265
J .---------> = 0.338
Ce .---------> = 0.138
.---------> = 0.022
Ar .---------> = 0.043
Ac .---------> = 0.155
GGyU .---------> = 0.107
Md .---------> = 0.197
Hrr
Jo Ceo Aro Aco Mdo
Jr Cer Arr Acr Mdr K = 0.338 0.043+ + 0.155 0.1970.138 + + + 0.0
-
5/24/2018 2 Da Parcial de Costos
13/15
9.450
9.450
9.450
9.450
9.450
9.450
9.450
-
5/24/2018 2 Da Parcial de Costos
14/15
METRADOS
48.00 m3
3.60 m2
525.00 kg
10.50 m3
126.00 m2
9.45 m3
PRESUPUESTO
METRADO C.U PARCIAL
48.00 x 48.78 = 2341.44
3.60 x 23.75 = 85.50
525.00 x 7.97 = 4184.25
10.50 x 284.25 = 2984.63
126.00 x 69.74 = 8787.24
9.45 x 467.71 = 4419.86
COSTO DIRECTO = 22802.91
GGyU 12.00% = 2736.35SUB TOTAL = 25539.26
IGV 18.00% = 4597.07
SUB TOTAL = 30136.33
5.- ENCOFRADO EN COLUMNAS
6.- CONCRETO EN COLUMNAS
3.- ACERO EN COLUMNAS
4.- CONCRETO EN ZAPATAS
1.- EXCAVACION DE ZANJAS
2.- SOLADO DE CONCRETO
3.- ACERO EN COLUMNAS
4.- CONCRETO EN ZAPATAS
1.- EXCAVACION DE ZANJAS
2.- SOLADO DE CONCRETO
5.- ENCOFRADO EN COLUMNAS
6.- CONCRETO EN COLUMNAS
-
5/24/2018 2 Da Parcial de Costos
15/15
RELACION DE INSUMOS