10
PRESUPUESTO - TOTAL ENTIDAD : UNSCH OBRA FECHA : JULIO 2014 DESCRIPCION MONTO PRESUPUESTO ESTRUCTURAS S/. 3,257,996.58 ARQUITECTURA S/. 2,000,924.74 INSTALACIONES SANITARIAS S/. 121,169.83 INSTALACIONES ELECTRICAS S/. 302,882.58 SUB TOTAL COSTO DIRECTO S/. 5,682,973.73 GASTOS GENERALES 9.39% 533,644.70 UTILIDAD 5.00% 284,148.69 SUB TOTAL 6,500,767.12 IMPUESTO (IGV) 18% 1,170,138.08 TOTAL DE PRESUPUESTO REFERENCIAL DE OBRA S/. 7,670,905.20 : “MEJORAMIENTO DEL SERVICIO DE EDUCACION UNIVERSITARIA EN LA ESCUELA DE FORMACION PROFESIONAL DE ING. CIVIL DE LA UNIVERSIDAD NACIONAL SAN CRISTOBAL DE HUMANGA".

Upload: juan-julian-allccarima-quito

Post on 16-Sep-2015

214 views

Category:

Documents


0 download

TRANSCRIPT

PRESUPUESTO TOTALPRESUPUESTO - TOTALENTIDAD: UNSCHOBRA: MEJORAMIENTO DEL SERVICIO DE EDUCACION UNIVERSITARIA EN LA ESCUELA DE FORMACION PROFESIONAL DE ING. CIVIL DE LA UNIVERSIDAD NACIONAL SAN CRISTOBAL DE HUMANGA".FECHA: JULIO 2014DESCRIPCIONMONTOPRESUPUESTOCOSTO TOTALESTRUCTURASS/.3,257,996.584,397,659.41ARQUITECTURAS/.2,000,924.742,700,857.81INSTALACIONES SANITARIASS/.121,169.83163,555.63INSTALACIONES ELECTRICASS/.302,882.58408,832.35SUB TOTAL COSTO DIRECTOS/.5,682,973.737,670,905.20GASTOS GENERALES9.39%533,644.70UTILIDAD5.00%284,148.69SUB TOTAL6,500,767.12IMPUESTO (IGV)18%1,170,138.08TOTAL DE PRESUPUESTO REFERENCIAL DE OBRAS/.7,670,905.20

ESTRUCTURASPRESUPUESTO - ESTRUCTURASENTIDAD: UNSCHOBRA: MEJORAMIENTO DEL SERVICIO DE EDUCACION UNIVERSITARIA EN LA ESCUELA DE FORMACION PROFESIONAL DE ING. CIVIL DE LA UNIVERSIDAD NACIONAL SAN CRISTOBAL DE HUMANGA".FECHA: JULIO 2014ItemDescripcinUnd.MetradoPrecio (S/.)Parcial (S/.)01ESTRUCTURAS3,257,996.5801.01OBRAS PROVISIONALES23,543.0601.01.01CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 X 2.40Mpza1.001,278.121,278.1201.01.02CERCO PROVISIONAL DE SEGURIDAD C/ARPILLERA H=2.0M C/ROLLIZOSm300.0023.096,927.0001.01.03ALMACEN, OFICINA Y CASETA DE GUARDIANIAm282.32156.3412,869.9101.01.04AGUA PARA CONSTRUCCIONglb1.002,468.032,468.0301.02TRABAJOS PRELIMINARES16,520.4001.02.01LIMPIEZA DE TERRENO NORMALm25,295.001.367,201.2001.02.02TRAZO Y REPLANTEO DURANTE EJECUCIONm25,295.001.769,319.2001.03MOVIMIENTO DE TIERRAS241,645.2001.03.01CORTE DE TERRENO CON MAQUINARIAm32,193.944.209,214.5501.03.02PERFILADO Y COMPACTACION EN ZONAS DE CORTE CON MAQUINARIAm24,786.351.406,700.8901.03.03CONFORMACION DE TERRAPLENES CON MAQUINARIAm3207.665.511,144.2101.03.04CONFORMACION DE AFIRMADO CON MAQUINARIAm378.0072.015,616.7801.03.05EXCAVACION MANUALm3655.5227.5318,046.4701.03.06EXCAVACION DE ZAPATAS HASTA 3.50 mm31,014.2538.5539,099.3401.03.07EXCAVACION DE ZANJAS PARA CIMIENTOS HASTA 1.00 mm3186.5524.094,493.9901.03.08NIVELACION Y COMPACTADO DE SUBBASEm23,661.661.435,236.1701.03.09RELLENO Y COMPACT. MANUAL C/MAT. AFIRMADOm3395.3793.7937,081.7501.03.10RELLENO Y COMPACT. MANUAL C/MAT. PROPIOm3497.3913.886,903.7701.03.11ACARREO INTERNO DE MAT. PROCEDENTE DE EXC.m31,630.7113.1221,394.9201.03.12ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINARIAm34,055.7721.3886,712.3601.04CONCRETO SIMPLE295,876.5701.04.01SOLADO PARA ZAPATAS DE 4" MEZCLA 1:12 CEMENTO-HORMIGONm2392.0427.5010,781.1001.04.02sub-CIMIENTOS CORRIDOS MEZCLA 1:12 CEMENTO-HORMIGON 30%PGm3136.77142.8719,540.3301.04.03CIMIENTO ENCOFRADO Y DESENCOFRADOm2378.9977.9929,557.4301.04.04CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30%PGm3108.52150.4916,331.1701.04.05SOBRECIMIENTO ENCOFRADO Y DESENCOFRADOm2663.4371.9747,747.0601.04.06SOBRECIMIENTOS CORRIDOS MEZCLA 1:8 CEMENTO-HORMIGON 25%PMm363.87232.4614,847.2201.04.07FALSO PISO DE H=4" MEZCLA 1:8m21,455.3625.0436,442.2101.04.08VARIOS120,630.0501.04.08.01ENCOFRADO Y DESENCOFRADO CARAVISTA, SARDINELESm2171.9353.099,127.7601.04.08.02CONCRETO F'C=175 KG/CM2, SARDINELESm388.73317.3028,154.0301.04.08.03ENCOFRADO Y DESENCOFRADO DE PISTAm271.4074.315,305.7301.04.08.04CONCRETO PISTA F'C=210 KG/CM2m3195.00373.5272,836.4001.04.08.05ENCOFRADO Y DESENCOFRADO, GRADASm224.7584.652,095.0901.04.08.06CONCRETO F'C=175 KG/CM2, GRADASm35.86341.702,002.3601.04.08.07CONCRETO F'C=140 KG/CM2 (DADOS DE TUBERIA MONTANTE)m33.77294.081,108.6801.05CONCRETO ARMADO2,210,865.7601.05.01ZAPATAS96,134.1101.05.01.01ZAPATAS, ACERO DE REFUERZO FY=4200 KG/CM2kg7,538.223.9229,549.8201.05.01.02ZAPATAS, CONCRETO F'C=210 KG/CM2m3237.92279.8666,584.2901.05.02COLUMNAS716,286.2101.05.02.01COLUMNAS, ACERO DE REFUERZO FY=4200 KG/CM2kg66,636.243.92261,214.0601.05.02.02COLUMNAS, ENCOFRADO Y DESENCOFRADOm23,898.6473.39286,121.1901.05.02.03COLUMNAS, CONCRETO F'C=210 KG/CM2m3435.89387.60168,950.9601.05.03VIGAS456,080.5501.05.03.01VIGAS, ACERO DE REFUERZO FY=4200 KG/CM2kg39,092.403.92153,242.2101.05.03.02VIGAS, ENCOFRADO Y DESENCOFRADOm22,273.5584.59192,319.5901.05.03.03VIGAS, CONCRETO F'C=210 KG/CM2m3312.05354.17110,518.7501.05.04LOSAS MACIZAS63,799.0501.05.04.01LOSA MACIZA, ACERO DE REFUERZO FY=4200 KG/CM2kg6,751.083.9226,464.2301.05.04.02LOSA MACIZA, ENCOFRADO Y DESENCOFRADOm2376.5557.0121,467.1201.05.04.03LOSA MACIZA, CONCRETO F'C=210 KG/CM2m346.39342.0515,867.7001.05.05LOSAS ALIGERADAS604,682.9101.05.05.01LOSA ALIGERADAS, ENCOFRADO Y DESENCOFRADOm23,633.9963.28229,958.8901.05.05.02LOSA ALIGERADAS, LADRILLO HUECO TECHO 0.30 X 0.30 X 0.20Mund23,762.004.69111,443.7801.05.05.03LOSA ALIGERADAS, LADRILLO HUECO TECHO 0.30 X 0.30 X 0.15Mund5,203.003.3617,482.0801.05.05.04LOSA ALIGERADAS, LADRILLO HUECO TECHO 0.30 X 0.30 X 0.12Mund3,436.003.1810,926.4801.05.05.05LOSA ALIGERADAS, ACERO DE REFUERZO FY=4200 KG/CM2kg26,121.333.92102,395.6101.05.05.06LOSA ALIGERADAS, CONCRETO F'C=210 KG/CM2m3409.61323.42132,476.0701.05.06CISTERNA SUBTERRANEA21,130.7401.05.06.01TANQUE CISTERNA, ACERO DE REFUERZO FY=4200 KG/CM2kg1,568.703.926,149.3001.05.06.02TANQUE CISTERNA, ENCOFRADO Y DESENCOFRADOm2141.2252.027,346.2601.05.06.03TANQUE CISTERNA, CONCRETO F'C=210 KG/CM2m316.40465.567,635.1801.05.07TANQUE ELEVADO12,941.1401.05.07.01TANQUE ELEVADO, ACERO DE REFUERZO FY=4200 KG/CM2kg776.803.923,045.0601.05.07.02TANQUE ELEVADO, ENCOFRADO Y DESENCOFRADOm288.4270.776,257.4801.05.07.03TANQUE ELEVADO, CONCRETO F'C=210 KG/CM2m37.00519.803,638.6001.05.08ESCALERAS36,782.2801.05.08.01ESCALERA, ACERO DE REFUERZO FY=4200 KG/CM2kg3,112.563.9212,201.2401.05.08.02ESCALERA, ENCOFRADO Y DESENCOFRADOm2156.7387.7813,757.7601.05.08.03ESCALERA, CONCRETO F'C=210 KG/CM2m326.01416.1210,823.2801.05.09COLUMNETAS Y VIGUETAS DE CONFINAMIENTO121,624.0901.05.09.01COLUMNETAS, VIGUETAS DE AMARRE, ACERO DE REFUERZO FY=4200 KG/CM2kg7,471.083.9229,286.6301.05.09.02COLUMNETAS,VIGUETAS DE AMARRE, ENCOFRADO Y DESENCOFRADOm2782.8373.3957,451.8901.05.09.03COLUMNETAS, VIGUETAS DE AMARRE, CONCRETO F'C=175 KG/CM2m379.89436.6734,885.5701.05.10VARIOS81,404.6801.05.10.01ENCOFRADO Y DESENCOFRADO CARAVISTA, CANALETA EVACUACION PLUVIALm2391.1047.8818,725.8701.05.10.02CANALETA DE EVACUACION PLUVIAL, CONCRETO F'C=175 KG/CM2 + REJILLAm184.48170.6631,483.3601.05.10.03BANCAS DE CONCRETOund8.00766.726,133.7601.05.10.04MESAS DE CONCRETO f'c=210 kg/cm2 (ancho=0.65m)m41.10154.606,354.0601.05.10.05FALSA COLUMNA/PROTECCION TUBERIA MONTANTE, CONCRETO F'C=210 KG/CM2m361.5051.7518,707.6301.06MUROS Y TABIQUES DE ALBAILERIA283,815.5901.06.01MUROS DE LADRILLO KK TIPO IV CABEZA M: 1:4, J:1.5CMm21,292.88134.57173,982.8601.06.02MUROS DE LADRILLO KK TIPO IV SOGA M: 1:4, J:1.5CMm21,337.1978.74105,290.3401.06.03ACERO DE REFUERZO FY=4200 KG/CM2: MUROS DE ALBAILERIAkg962.374.724,542.3901.07COBERTURAS185,730.0001.07.01COBERTURA AUTOSOPORTADO CURVA DE ACERO (TECHO DE LABORATORIO ESTRUCTURAS)m2450.00390.00175,500.0001.07.02CERRAMIENTO DE TIMPANO FRONTAL Y POSTERIORm266.00155.0010,230.00COSTO DIRECTO3,257,996.58GASTOS GENERALES9.39%305,933.60UTILIDAD5.00%162,899.83SUB TOTAL3,726,830.01IMPUESTO (IGV)18.00%670,829.40TOTAL DE PRESUPUESTO4,397,659.41

ARQUITECTURAPRESUPUESTO - ARQUITECTURAENTIDAD: UNSCHOBRA: MEJORAMIENTO DEL SERVICIO DE EDUCACION UNIVERSITARIA EN LA ESCUELA DE FORMACION PROFESIONAL DE ING. CIVIL DE LA UNIVERSIDAD NACIONAL SAN CRISTOBAL DE HUMANGA".FECHA: JULIO 2014ItemDescripcinUnd.MetradoPrecio (S/.)Parcial (S/.)01ARQUITECTURA2,000,924.7401.01REVOQUES ENLUCIDOS Y MOLDURAS341,760.9701.01.01TARRAJEO PRIMARIO, MORTERO 1:5 C:Am2436.2118.197,934.6601.01.02TARRAJEO EN MURO INTERIOR, MORTERO 1:5 C:Am22,710.7332.9389,264.3401.01.03TARRAJEO EN MURO EXTERIOR, MORTERO 1:5 C:Am21,785.6841.6774,409.2901.01.04TARRAJEO EN COLUMNAS, MORTERO 1:5 C:Am22,117.0729.0661,522.0501.01.05TARRAJEO EN VIGAS, MORTERO 1:5 C:Am21,482.1641.5661,598.5701.01.06VESTIDURA DE DERRAMES 1:5 C:Am1,772.2910.4518,520.4301.01.07BRUAS SEGUN DETALLE 1 X 1CMm1,845.366.8012,548.4501.01.08TARRAJEO CON IMPERMEABILIZANTEm2297.1053.7315,963.1801.02CIELO RASOS163,700.0501.02.01CIELO RASO CON MEZCLA C:A 1:5m23,314.7146.30153,471.0701.02.02VESTIDURA EN FONDO DE ESCALERA Y RAMPAm2333.3030.6910,228.9801.03PISOS Y PAVIMENTOS461,307.1901.03.01CONTRAPISO DE 40MMm23,167.1325.3280,191.7301.03.02PISO DE PORCELANATOm22,218.2554.55121,005.5401.03.03PISO GRES CERAMICO 10x20 COLOR ROJOm21,936.9856.53109,497.4801.03.04PISO CEMENTO SEMIPULIDO Y BRUADO E=2" S/COLOREARm21,808.3326.8448,535.5801.03.05PISO ADOQUINADOm22,085.2748.56101,260.7101.03.06ACABADO CEMENTO SEMIPULIDO Y BRUADOm233.1524.62816.1501.04CONTRAZOCALOS34,977.2001.04.01CONTRAZOCALO DE PORCELANATO H=10 cmm1,490.0816.5624,675.7201.04.02CONTRAZOCALO DE GRES CERAMICO ROJO H=10 cmm395.0316.326,446.8901.04.03CONTRAZOCALO S/COLOREAR H=30CM MEZCLA 1:2 E=1.5CMm334.6011.523,854.5901.05ZOCALOS26,953.4201.05.01ZOCALO DE MAYOLICA 20X30 1RAm2436.2161.7926,953.4201.06CUBIERTAS129,391.5601.06.01COBERTURA C/TEJA DE ARCILLA 42X20 ASENTADO C/MEZCLAm2165.5753.448,848.0601.06.02COBERTURA DE POLICARBONATOm2168.32691.31116,361.3001.06.03POSTES METALICOS DE SOSTENIMIENTO DE COBERTURA DE POLICARBONATOund11.00380.204,182.2001.07CARPINTERIA DE MADERA59,617.5401.07.01PUERTA CEDRO TIPO APANALADOm2168.96352.8559,617.5401.08CARPINTERIA METALICA13,163.0901.08.01ESCALERA TIPO GATO, TUBO FG 1 1/2" Y 1" TQE ELEVADOm5.00135.00675.0001.08.02TAPA DE FIERRO EN CISTERNA Y TQE ALTOund2.00348.24696.4801.08.03PASAMANOS DE TUBO FG DE 1 1/2"m30.6697.672,994.5601.08.04PUERTA METALICAm251.90169.508,797.0501.09CARPINTERIA DE ALUMINIO447,533.0901.09.01MURO CORTINA A BASE DE ESTRUCTURA DE ALUMINIO PFK Y CRISTAL TEMPLADO DE 9MM TEMPLEX REFLEJANTE BRONCEm2593.91440.68261,724.2601.09.02VENTANA SISTEMA CORREDIZA C/VIDRIO CRUDO REFLEJANTE DE 6mm Y ACCESORIODE ALUMINIO PFKm2389.05105.9341,212.0701.09.03BARANDA DE CRISTAL TEMPLADO INCOLORO DE 10 MM TEMPLEX Y ALUMINIO PFKm2371.27292.37108,548.2101.09.04PUERTA Y TABIQUERIA DE MELAMINE SEGUN DISEOm2119.35167.8020,026.9301.09.05CANTONERA DE ALUMINIO EN PASOS DE ESCALERAm625.6025.6116,021.6201.10CERRAJERIA8,085.2201.10.01BISAGRAS CAPUCHINA ALUMINIZADA DE 4" PESADA EN PUERTApza171.0015.402,633.4001.10.02CERRADURA DOS GOLPES EN PUERTApza60.0074.354,461.0001.10.03MANIJA DE BRONCE 4" P/PUERTASpza60.0015.23913.8001.10.04CANDADO TIPO FORTE 60MMpza2.0038.5177.0201.11VIDRIOS CRISTALES Y SIMILARES2,292.0001.11.01VIDRIO SEMIDOBLE INCOLORO CRUDOp2600.003.822,292.0001.12PINTURAS234,509.1101.12.01PINTURA LATEX 02 MANOS EN CIELO RASOm25,907.7811.9770,716.1301.12.02PINTURA OLEO 2 MANOS EN VIGASm22,296.229.0720,826.7201.12.03PINTURA OLEO 2 MANOS EN MUROS INTERIORESm25,890.8810.1759,910.2501.12.04PINTURA OLEO 2 MANOS EN MUROS EXTERIORESm22,838.7011.7333,297.9501.12.05PINTURA OLEO 2 MANOS EN COLUMNASm23,000.5710.7332,196.1201.12.06PINTURA OLEO 2 MANOS EN DERRAMESm1,772.295.519,765.3201.12.07PINTURA BARNIZ 2 MANOS EN CARP. MADERAm2418.3816.266,802.8601.12.08PINTURA ESMALTE 2 MANOS EN CONTRAZOCALO DE CEMENTO H=30CMm334.602.97993.7601.13VARIOS51,960.1501.13.01TAPAJUNTA METALICA EN PISOSm101.6440.184,083.9001.13.02TAPAJUNTA METALICA ENTRE MODULOS (VERTICAL)m7.2522.54163.4201.13.03JUNTA SISMICA CON ESPUMA PLASTICA+JEBE MICROPOROSO E=1"m42.8267.982,910.9001.13.04JUNTA DE CONSTRUCCIONm2276.959.882,736.2701.13.05JUNTA DILATACION RELLENO CON MORTERO ASFALTICO E=1"m1,198.968.109,711.5801.13.06BANCAS DE CONCRETO, TARRAJEOund8.00171.891,375.1201.13.07MESAS DE CONCRETO C/MAYOLICA, TARRAJEO Y ENCHAPADO (ANCHO 0.60 M)m22.80119.052,714.3401.13.08MESAS DE CONCRETO C/PORCELANATO, TARRAJEO Y ENCHAPADO (ANHO=0.65M)m18.30148.342,714.6201.13.09SEMBRADO DE GRASSm21,434.8716.5723,775.8001.13.10SEMBRADO DE ARBOLES ORNAMENTALESund60.0029.571,774.2001.14PLAN MANEJO AMBIENTAL25,674.1501.14.01PLAN DE MONITOREO AMBIENTALglb1.001,216.111,216.1101.14.02SEGURIDAD Y SEALIZACION EN CONSTRUCCIONglb1.007,881.477,881.4701.14.03BAOS MOVILESund1.003,623.513,623.5101.14.04PLAN DE CAPACITACION Y EDUCACION AMBIENTALglb1.0011,079.9611,079.9601.14.05PLAN DE CONTINGENCIASglb1.001,873.101,873.10COSTO DIRECTO2,000,924.74GASTOS GENERALES9.39%187,891.58UTILIDAD5.00%100,046.24SUB TOTAL2,288,862.55IMPUESTO (IGV)18.00%411,995.26TOTAL DE PRESUPUESTO2,700,857.81

ISPRESUPUESTO - INSTALACIONES SANITARIASENTIDAD: UNSCHOBRA: MEJORAMIENTO DEL SERVICIO DE EDUCACION UNIVERSITARIA EN LA ESCUELA DE FORMACION PROFESIONAL DE ING. CIVIL DE LA UNIVERSIDAD NACIONAL SAN CRISTOBAL DE HUMANGA".FECHA: JULIO 2014ItemDescripcinUnd.MetradoPrecio (S/.)Parcial (S/.)01INSTALACIONES SANITARIAS121,169.8301.01APARATOS SANITARIOS Y ACCESORIOS19,755.8901.01.01INODORO TANQUE BAJO DE LOSA 1RA CALIDAD ADULTOpza28.00328.229,190.1601.01.02LAVATORIO DE PARED BLANCO INC. ACCESORIOSpza26.00197.835,143.5801.01.03LAVATORIO OVALIN BLANCO...pza6.00248.681,492.0801.01.04LAVADERO DE ACERO INOXIDABLE INCLUYE ACCESORIOSpza2.00354.26708.5201.01.05URINARIOpza15.00214.773,221.5501.02INSTALACIONES SANITARIAS24,243.4701.02.01SALIDA DESAGUE DE PVC SAP 2"pto82.0063.845,234.8801.02.02SALIDA DESAGUE DE PVC SAP 4"pto54.0074.374,015.9801.02.03SALIDA PARA VENTILACIONpto12.0067.43809.1601.02.04TUBERIA DE PVC SAP 2"m197.8310.071,992.1501.02.05TUBERIA DE PVC SAP 4"m177.0513.432,377.7801.02.06SUMINISTRO E INSTALACION DE TUBERIA PVC NORMA ISO 4435 DN=160mm S-25m41.7526.291,097.6101.02.07REGISTRO DE BRONCE 4"und28.0035.811,002.6801.02.08SUMIDERO DE BRONCE ROSCADO 2"und18.0065.961,187.2801.02.09CAJA SUMIDERO CON REJILLA DE FIERROund1.00187.53187.5301.02.10CAJA DE REGISTRO DESAGUE 12"X24" C/TAPA CONCRETOund11.00576.226,338.4201.03SISTEMA DE AGUA FRIA Y CONTRA INCENDIO23,227.5801.03.01SALIDA DE AGUA FRIA TUBERIA PVC 1/2"pto77.0066.495,119.7301.03.02TUBERIA PVC CLASE 10 - 1/2"m127.9810.631,360.4301.03.03TUBERIA PVC CLASE 10 - 3/4"m77.3111.88918.4401.03.04TUBERIA PVC CLASE 10 - 1"m44.9213.57609.5601.03.05TUBERIA PVC CLASE 10 - 1 1/2"m48.3715.62755.5401.03.06TUBERIA DE FIERRO GALVANIZADO DE 2"m120.4232.083,863.0701.03.07VALVULA COMPUERTA DE BRONCE 1/2"und12.0084.121,009.4401.03.08VALVULA COMPUERTA DE BRONCE 3/4"und4.0098.53394.1201.03.09VALVULA COMPUERTA DE BRONCE 1 1/2"und1.00174.81174.8101.03.10REDUCCION PVC SAP 3/4" A 1/2"und16.0016.19259.0401.03.11REDUCCION PVC SAP 1" A 3/4"und4.0016.6266.4801.03.12REDUCCION PVC SAP 1 1/2" A 1"und2.0018.3136.6201.03.13CAJA EN NICHO DE MAYOLICA PARA VALVULAund16.0035.45567.2001.03.14CAJA BYPASS DE CONCRETOund1.00677.80677.8001.03.15GABINETE CONTRA INCENDIOS, INCLUYE ACCESORIOS Y MANGUERASund5.001,483.067,415.3001.04TANQUE CISTERNA 110,544.5301.04.01SUCCION E IMPULSION INCLUYE INSTALACION Y ACCESORIOSglb1.007,003.487,003.4801.04.02ALIMENTADOR A LOS SERVICIOS INCLUYE INSTALACION Y ACCESORIOSglb1.001,536.201,536.2001.04.03REBOSE Y LIMPIA INCLUYE INSTALACION Y ACCESORIOSglb1.002,004.852,004.8501.05SISTEMA DE AGUA DE LLUVIA37,351.0001.05.01TUBERIA DE PVC SAP 4"m739.9213.439,937.1301.05.02SUMIDERO DE BRONCE ROSCADO 4"und46.0099.604,581.6001.05.03SALIDA DESAGUE DE PVC SAP 4"pto92.0074.376,842.0401.05.04CAJA DE REGISTRO DESAGUE 12"X24" C/TAPA CONCRETOund22.00576.2212,676.8401.05.05CANALETA "MEDIA CAA"m361.498.252,982.2901.05.06GARGOLAS DE CONCRETO S/DISEOund11.0030.10331.1001.06VARIOS6,047.3601.06.01EXCAVACION MANUALm3142.6627.533,927.4301.06.02RELLENO Y COMPACT. MANUAL C/MAT. ZARANDEADOm371.3315.841,129.8701.06.03RELLENO Y COMPACT. MANUAL C/MAT. PROPIOm371.3313.88990.06COSTO DIRECTO121,169.83GASTOS GENERALES9.39%11,378.13UTILIDAD5.00%6,058.49SUB TOTAL138,606.46IMPUESTO (IGV)18.00%24,949.16TOTAL DE PRESUPUESTO163,555.63

IEPRESUPUESTO - INSTALACIONES ELECTRICASENTIDAD: UNSCHOBRA: MEJORAMIENTO DEL SERVICIO DE EDUCACION UNIVERSITARIA EN LA ESCUELA DE FORMACION PROFESIONAL DE ING. CIVIL DE LA UNIVERSIDAD NACIONAL SAN CRISTOBAL DE HUMANGA".FECHA: JULIO 2014ItemDescripcinUnd.MetradoPrecio (S/.)Parcial (S/.)01INSTALACIONES ELECTRICAS302,882.5801.01SALIDAS PARA ALUMBRADO23,885.3701.01.01SALIDA DE TECHO C/PVC SAP 15MM(NH-80 2.5 MM2)pto296.0064.7319,160.0801.01.02SALIDA DE PARED C/PVC SAP 15MM(NH-80 2.5 MM2)pto73.0064.734,725.2901.02SALIDAS PARA INTERRUPTORES5,055.9501.02.01INTERRUPTOR UNIPOLAR SIMPLE C/PVC SAP 15MM(NH-80 2.5 MM2)pto25.0044.601,115.0001.02.02INTERRUPTOR UNIPOLAR DOBLE C/PVC SAP 15MM(NH-80 2.5 MM2)pto20.0044.60892.0001.02.03INTERRUPTOR UNIPOLAR TRIPLE C/PVC SAP 15MM(NH-80 2.5 MM2)pto10.0077.69776.9001.02.04INTERRUPTOR CONMUTACION SIMPLE C/PVC SAP 15MM(NH-80 2.5M2)pto45.0050.492,272.0501.03SALIDAS PARA TOMACORRIENTES18,008.7701.03.01TOMACORR. BIPOLAR DOBLE 15A C/T. PVC SAP 15 MMpto237.0060.2314,274.5101.03.02TOMACORR. BIPOLAR DOBLE 15A C/TOMA A TIERRA. PVC SAP 15 MM ESTABILIZADOpto62.0060.233,734.2601.04SALIDAS ESPECIALES4,784.8001.04.01SALIDA PARA UPS C/PVC SAP 50MM (2-1 NH-80 16 MM2+1X50 MM2/T)pto6.00100.52603.1201.04.02SALIDA PARA BOMBA DE AGUA C/PVC SAP 20MM (3-1x4 MM2 NH-80 +1x4 MM2/T)pto3.00138.11414.3301.04.03SALIDA PARA TELEFONOpto5.0041.92209.6001.04.04SALIDA PARA DETECTOR DE HUMOpto52.0046.432,414.3601.04.05SALIDA PARA PARLANTEpto6.0043.18259.0801.04.06SALIDA DE FUERZAS ESPECIALESpto7.00126.33884.3101.05CAJAS DE PASE1,887.3001.05.01CAJAS DE PASE CON TAPA CIEGApza50.0029.091,454.5001.05.02CAJAS DE PASE DE 100X100X50MMpza20.0021.64432.8001.06TABLEROS3,898.2101.06.01TABLERO DE DISTRIBUCION CAJA METALICA 12 POLOSpza4.00172.23688.9201.06.02TABLERO DE DISTRIBUCION CAJA METALICA 26 POLOSpza8.00262.262,098.0801.06.03TABLERO DE DISTRIBUCION CAJA METALICA 36 POLOSpza1.00477.06477.0601.06.04TABLERO DE DISTRIBUCION CAJA METALICA 16 POLOSpza1.00197.06197.0601.06.05CAJA DE DISTRIBUCION TELEFONICA TIPO Bpza6.0058.84353.0401.06.06CAJA DE DISTRIBUCION TELEFONICA CENTRALpza1.0084.0584.0501.07INTERRUPTORES TERMOMAGNETICOS7,345.8301.07.01INTERRUPTOR TERMOMAGNETICO MONOFASICA 2X15Apza83.0050.544,194.8201.07.02INTERRUPTOR TERMOMAGNETICO TRIFASICA 3X40Apza2.0090.96181.9201.07.03INTERRUPTOR TERMOMAGNETICO TRIFASICA 3X50Apza3.00107.77323.3101.07.04INTERRUPTOR TERMOMAGNETICO TRIFASICA 3X20Apza15.0072.771,091.5501.07.05INTERRUPTOR TERMOMAGNETICO TRIFASICA 3X250Apza1.00256.93256.9301.07.06INTERRUPTOR TERMOMAGNETICO TRIFASICA 2X50Apza1.0092.6692.6601.07.07INTERRUPTOR TERMOMAGNETICO TRIFASICA 3X350Apza1.00376.68376.6801.07.08INTERRUPTOR TERMOMAGNETICO MONOFASICO 3X30Apza4.0089.54358.1601.07.09INTERRUPTOR DIFERENCIAL 2 X 20A-30mApza12.0039.15469.8001.08ARTEFACTOS65,173.5001.08.01ARTEFACTO TIPO B1pza31.00207.636,436.5301.08.02ARTEFACTO TIPO B2pza261.00132.2134,506.8101.08.03ARTEFACTO TIPO B3pza9.00132.211,189.8901.08.04ARTEFACTO TIPO Gpza73.00196.3514,333.5501.08.05COLOCACION DE ARTEFACTOS DE ALUMBRADOpza374.0023.288,706.7201.09SISTEMA DE PUESTA A TIERRA6,520.6001.09.01POZO DE PROTECCION A TIERRAund10.00652.066,520.6001.10PRUEBAS ELECTRICAS8,898.3301.10.01PRUEBAS DE AISLAMIENTO Y RESISTIVIDADglb3.002,966.118,898.3301.11CONDUCTOS50,761.3701.11.01TUBERIAS PVC SAP (ELECTRICAS) D=15MMm2,600.008.3121,606.0001.11.02TUBERIAS PVC SAP (ELECTRICAS) D=20MMm2,050.009.6219,721.0001.11.03TUBERIAS PVC SAP (ELECTRICAS) D=25MMm81.0010.83877.2301.11.04TUBERIAS PVC SAP (ELECTRICAS) D=35MMm360.0014.245,126.4001.11.05TUBERIAS PVC SAP (ELECTRICAS) D=50MMm162.0018.973,073.1401.11.06TUBERIAS PVC SAP (ELECTRICAS) D=100MMm20.0017.88357.6001.12CABLES Y CONDUCTORES34,892.5001.12.01CABLE ELECTRICO NH-80 1X2.5 MM2m2,600.001.273,302.0001.12.02CABLE ELECTRICO TW 4 MM2m2,050.000.711,455.5001.12.03CABLE ELECTRICO NYY 3-1X2.5+1X1.5MM2m10.0015.75157.5001.12.04CABLE ELECTRICO NYY 3-1X6+1X4MM2m81.0021.001,701.0001.12.05CABLE ELECTRICO NYY 3-1X10+1X6MM2m195.0027.305,323.5001.12.06CABLE ELECTRICO NYY 3-1X16+1X10MM2m223.0031.507,024.5001.12.07CABLE ELECTRICO NYY 3-1X50+1X35MM2m93.0073.506,835.5001.12.08CABLE ELECTRICO NYY 3-1X70+1X50MM2m68.0099.756,783.0001.12.09CABLE ELECTRICO NYY 3-1X120+1X95MM2m20.00115.502,310.0001.13SISTEMA DE LUZ DE EMERGENCIA31,749.7601.13.01ARTEFACTO DE ILUMINACION DE EMERGENCIA A BATERIApza112.00220.8824,738.5601.13.02TOMACORRIENTE PARA LUZ DE EMERGENCIApza112.0062.607,011.2001.14SISTEMA DE COMPUTO, TELEFONO Y ALARMAS3,764.0201.14.01SISTEMA DE COMUNICACIONES3,764.0201.14.01.01SALIDA DE COMUNICACIONES/DATA EN PAREDpto62.0060.713,764.0201.15EQUIPOS ELECTRICOS Y MECANICOS2,627.1201.15.01INSTALACIONES MECANICAS2,627.1201.15.01.01PARARRAYOSund1.002,627.122,627.1201.16MOVIMIENTO DE TIERRAS12,862.2401.16.01EXCAVACION MANUALm3309.4027.538,517.7801.16.02RELLENO Y COMPACT. MANUAL C/MAT. PROPIOm3285.6013.883,964.1301.16.03ACARREO INTERNO DE MAT. PROCEDENTE DE EXC.m323.8013.12312.2601.16.04NIVELACION Y COMPACTADO DE SUBBASEm247.601.4368.0701.17FAROLAS ORNAMENTALES11,798.6101.17.01EXCAVACION MANUALm33.0027.5382.5901.17.02ACARREO INTERNO DE MAT. PROCEDENTE DE EXC.m33.0013.1239.3601.17.03CONCRETO F'C=175 KG/CM2, PARA ANCLAJES Y DADOSm33.00301.80905.4001.17.04FAROLAS ORNAMENTALESund31.00347.4610,771.2601.18APARATOS LUMINARIOS8,968.3001.18.01LUMINARIAS CON GLOBOund62.00144.658,968.30COSTO DIRECTO302,882.58GASTOS GENERALES9.39%28,441.40UTILIDAD5.00%15,144.11SUB TOTAL346,468.10IMPUESTO (IGV)18.00%62,364.26TOTAL DE PRESUPUESTO408,832.36